Bridge (ID- 663 ) Inventory Report

Rcc bridge at bangwa to khakra nadi road over khakra Nala On Chainage 1.200 of Bangaun to Khakra River Marg

Data finalized On 25 Feb 2022

By Er. Girish Chandra Lohani

Last Rated On 18 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : CD Khatima

General

Bridge Type : Motor Bridge High Level
Structure No : 2/1
Feature Intersected : Khakra Nala
Name of Bridge : Rcc bridge at bangwa to khakra nadi road over khakra Nala
Nearest Town : Majola
Latitude (Northing) : 28.78553000
Longitude (Easting) : 79.91002000
Construction Year : 1998
Inventory Year : 2021

Geometric

Overall length (in meter) : 27.00
Total No of Span : 3
Maximuam Span (in meter) : 9.00
Span Arragment : 1x9.00m
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.300
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Pile
Pier Foundation Type : Pile
No of Piers : 2
Abutment Type : RCC Box type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided