Bridge (ID- 684 ) Inventory Report

Dhanauri Bridge On Chainage 8.800 of Bahadrabad Dhanori Imlikheda Bhagwanpur Gagal Haidi state highway

Data Yet Not Finalized

Last Rated On 12 Jun 2024

Rating 0.45%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : CD Roorkee

General

Bridge Type : Motor Bridge High Level
Structure No : 2
Feature Intersected : Ganga Canal
Name of Bridge : Dhanauri Bridge
Nearest Town : Dhanauri
Latitude (Northing) : 29.93275000
Longitude (Easting) : 77.88492000
Construction Year : 2020
Inventory Year : 2020

Geometric

Overall length (in meter) : 85.00
Total No of Span : 3
Maximuam Span (in meter) : 28.33
Span Arragment : 1x28.33+ 1x28.33+1x28.33
No of Lane : 2.000
Overall Width (m) : 12.000
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 1.750
LS Footpath Width (m) : 1.750
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Filler
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : other

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 2
Abutment Type : other
Pier Type : other

Protection Work

Bank Protection Left Side of Up-stream : protection work provided
Bank Protection Right Side of Up-stream : protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided