Bridge (ID- 712 ) Inventory Report

Prestressed Bridge on Dhanauri Ratmau River On Chainage 9.800 of Bahadrabad Dhanori Imlikheda Bhagwanpur Gagal Haidi state highway

Data Yet Not Finalized

Last Rated On 10 Jun 2025

Rating 0.63%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : CD Roorkee

General

Bridge Type : Motor Bridge High Level
Structure No : S.No. 02
Feature Intersected : Ramtau River
Name of Bridge : Prestressed Bridge on Dhanauri Ratmau River
Nearest Town : Dhanauri
Latitude (Northing) : 29.94029000
Longitude (Easting) : 77.95024000
Construction Year : 2010
Inventory Year : 2011

Geometric

Overall length (in meter) : 220.00
Total No of Span : 1
Maximuam Span (in meter) : 24.45
Span Arragment : 9x 24.445
No of Lane : 1.000
Overall Width (m) : 7.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 269.600
OFL Ordinary Flood Level : 266.000
LWL Low Water Level : 265.875
Design Velocity (m/Sec) :
Design Discharge (Cumecs) : 2025.00
Soffit Level at Centre : 270.000
Road Level at Centre : 273.650
Design Scour Level at Pier : 265.275
Design Scour Level at Abutments : 271.250
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 8
Abutment Type : other
Pier Type : other

Protection Work

Bank Protection Left Side of Up-stream : protection work provided
Bank Protection Right Side of Up-stream : protection work provided
Bank Protection Left Side of Down-stream : protection work provided
Bank Protection Right Side of Down-stream : protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided