General

Bridge Type : Motor Bridge High Level
Structure No : S.No. 02
Feature Intersected : Ramtau River
Name of Bridge : Dhanauri Bridge on Ratmau
Nearest Town : Dhanauri
Latitude (Northing) : 29.94029000
Longitude (Easting) : 77.95024000
Construction Year : 2010
Inventory Year : 2011

Geometric

Overall length (in meter) : 220.00
Total No of Span : 1
Maximuam Span (in meter) : 24.45
Span Arragment : 9x 24.445
No of Lane : 1.000
Overall Width (m) : 7.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 269.600
OFL Ordinary Flood Level : 266.000
LWL Low Water Level : 265.875
Design Velocity (m/Sec) :
Design Discharge (Cumecs) : 2025.00
Soffit Level at Centre : 270.000
Road Level at Centre : 273.650
Design Scour Level at Pier : 265.275
Design Scour Level at Abutments : 271.250
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 8
Abutment Type : other
Pier Type : other

Protection Work

Bank Protection Left Side of Up-stream : protection work provided
Bank Protection Right Side of Up-stream : protection work provided
Bank Protection Left Side of Down-stream : protection work provided
Bank Protection Right Side of Down-stream : protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided