Bridge (ID- 73 ) Inventory Report

Padli Bridge On Chainage 0.150 of NH 87 Km 114 to Chak Bisod Padli Motor Road

Data finalized On 17 Nov 2022

By Er. Meenu Devi

Last Rated On 29 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : PD Nainital

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Sipra River
Name of Bridge : Padli Bridge
Nearest Town : Bhowali
Latitude (Northing) : 29.43650000
Longitude (Easting) : 79.48938900
Construction Year : 2015
Inventory Year : 2021

Geometric

Overall length (in meter) : 21.00
Total No of Span : 1
Maximuam Span (in meter) : 21.00
Span Arragment : 1x21
No of Lane : 1.000
Overall Width (m) : 5.350
Carriageway Width (m) : 3.900
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Filler
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : 8m length RR masonary
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : primer work and painting work