Bridge (ID- 753 ) Inventory Report

10.00 Mter Span RCC Bridge Bhyun On Chainage 1.600 of Bhayun Gadera Nargada motor road

Data Yet Not Finalized

Last Rated On 04 Jun 2025

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Bageshwar Under Division : CD Kapkot

General

Bridge Type : Motor Bridge High Level
Structure No : 2/1
Feature Intersected : Local Gadhera
Name of Bridge : 10.00 Mter Span RCC Bridge Bhyun
Nearest Town : Bhyun
Latitude (Northing) : 29.93751000
Longitude (Easting) : 79.90082000
Construction Year : 2014
Inventory Year : 2020

Geometric

Overall length (in meter) : 10.00
Total No of Span : 1
Maximuam Span (in meter) : 10.00
Span Arragment : 1x10
No of Lane : 1.000
Overall Width (m) : 4.750
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.000
Gradient (%age) : 0
Skew Angle (degree) : 1.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1201.000
OFL Ordinary Flood Level : 1200.500
LWL Low Water Level : 1200.000
Design Velocity (m/Sec) : 5.00
Design Discharge (Cumecs) : 75.00
Soffit Level at Centre : 3.500
Road Level at Centre : 4.500
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided