Bridge (ID- 76 ) Inventory Report

Rusi Bridge On Chainage 1.960 of Chandikhet Aashram devta Kundidhar road

Data finalized On 16 Nov 2022

By Sunil kumar

Last Rated On 13 May 2024

Rating 8.75%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : PD Nainital

General

Bridge Type : Motor Bridge High Level
Structure No : 2/1
Feature Intersected : Rusi Gadhera
Name of Bridge : Rusi Bridge
Nearest Town : Nainital
Latitude (Northing) : 29.36341700
Longitude (Easting) : 79.45077800
Construction Year : 2016
Inventory Year : 2021

Geometric

Overall length (in meter) : 60.00
Total No of Span : 1
Maximuam Span (in meter) : 60.00
Span Arragment : 1x60
No of Lane : 2.000
Overall Width (m) : 9.900
Carriageway Width (m) : 7.900
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : POT PIN

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Abutment protection work by Plum concrete blocks
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : primer and painting in superstructure