Bridge (ID- 762 ) Inventory Report

pabau santudhaar km 18 arch bridge On Chainage 17.335 of Pabou Santudhar Nagounkhal Damdewal Chubattakhal Chorikhal motor road

Data finalized On 23 Dec 2023

By Himanshu pandey

Last Rated On 02 Dec 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : CD Paboo

General

Bridge Type : Motor Bridge High Level
Structure No : 18/1
Feature Intersected : Local nala
Name of Bridge : pabau santudhaar km 18 arch bridge
Nearest Town : pabau
Latitude (Northing) : 30.03202700
Longitude (Easting) : 78.85878000
Construction Year : 1972
Inventory Year : 2020

Geometric

Overall length (in meter) : 19.35
Total No of Span : 1
Maximuam Span (in meter) : 19.35
Span Arragment : 1x19.35
No of Lane : 1.000
Overall Width (m) : 8.500
Carriageway Width (m) : 8.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.850
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class SV
Load Rating : Class A

Super-Structure

Superstructure Type : Arch
Superstructure Material : Masonry
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : other
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided