Bridge (ID- 78 ) Inventory Report

Bridge On Chainage 5.580 of Bhawali Nainital Tanki Kilbury Pangot state highway

Data finalized On 17 Nov 2022

By Er. Meenu Devi

Last Rated On 19 May 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : PD Nainital

General

Bridge Type : Motor Bridge High Level
Structure No : 6/1
Feature Intersected : gadhera
Name of Bridge :
Nearest Town : Nainital
Latitude (Northing) : 29.38783300
Longitude (Easting) : 79.47341700
Construction Year :
Inventory Year : 2021

Geometric

Overall length (in meter) : 7.70
Total No of Span : 1
Maximuam Span (in meter) : 7.70
Span Arragment : 1x7.70
No of Lane : 1.000
Overall Width (m) : 10.500
Carriageway Width (m) : 9.700
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 10.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC buttressed type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : 10 m plum concrete work
Bank Protection Right Side of Down-stream : 15 m plum concrete work
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : painting work on railling