Bridge (ID- 809 ) Inventory Report

bhakhada Bridge On Chainage 3.350 of Gram Kopa kripali marg (VR)

Data finalized On 19 Jul 2025

By Govind Singh JE(T)

Last Rated On 24 May 2026

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : PD Rudrapur

General

Bridge Type : Motor Bridge High Level
Structure No : 4/2
Feature Intersected : bhakhada River
Name of Bridge : bhakhada Bridge
Nearest Town : gularbhoj
Latitude (Northing) : 29.10545800
Longitude (Easting) : 79.32541900
Construction Year : 1974
Inventory Year : 2021
Work Code(s) : --

Geometric

Overall length (in meter) : 46.20
Total No of Span : 5
Maximuam Span (in meter) : 9.00
Span Arragment : 5x9M
No of Lane : 1.000
Overall Width (m) : 7.500
Carriageway Width (m) : 3.750
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : other
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 4
Abutment Type : other
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided