Bridge (ID- 814 ) Inventory Report

Vijay Nagar( Siwuto)

Data finalized On 22 Dec 2023

By Vijay Pal Singh

Last Rated On 19 Jun 2026

Rating 1.31%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : CD Ranikhet

General

Bridge Type : Pedestrain Bridge
Structure No : 54/1
Feature Intersected : Ram ganga
Name of Bridge : Vijay Nagar( Siwuto)
Nearest Town : Haat/ Vijay nagar
Latitude (Northing) : 29.86464722
Longitude (Easting) : 79.32610278
Construction Year : 1984
Inventory Year : 2021
Work Code(s) : --

Geometric

Overall length (in meter) : 70.00
Total No of Span : 1
Maximuam Span (in meter) : 66.00
Span Arragment : 1x66
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.200
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 860.000
OFL Ordinary Flood Level : 856.000
LWL Low Water Level : 855.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Cable stayed
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : Plum concrete
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided