Bridge (ID- 825 ) Inventory Report

Khajiya Bridge On Chainage 13.400 of Link road from Jafarpur Gularbhoj road to Ajgra school

Data finalized On 27 Jun 2022

By Er P C Bahuguna

Last Rated On 15 Jun 2024

Rating 0.26%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : PD Rudrapur

General

Bridge Type : Motor Bridge High Level
Structure No : 14/1
Feature Intersected : Khajiya River
Name of Bridge : Khajiya Bridge
Nearest Town : Gularbhoj
Latitude (Northing) : 29.09629000
Longitude (Easting) : 79.30246000
Construction Year :
Inventory Year : 2021

Geometric

Overall length (in meter) : 26.70
Total No of Span : 9
Maximuam Span (in meter) : 8.50
Span Arragment : 2*9+1*8.7
No of Lane : 1.000
Overall Width (m) : 4.000
Carriageway Width (m) : 4.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 9.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Hard clayey
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 1
Abutment Type : RCC buttressed type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : Boulder Pitching
Bank Protection Right Side of Up-stream : Boulder Pitching
Bank Protection Left Side of Down-stream : Boulder Pitching
Bank Protection Right Side of Down-stream : Boulder Pitching
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided