Bridge (ID- 87 ) Inventory Report

RCC Bridge at km 5.51 of Uttarkashi bypass m/r On Chainage 5.510 of Uttarkashi Bypass Motor Road

Data Yet Not Finalized

Last Rated On 08 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : PD Bhatwari

General

Bridge Type : Motor Bridge High Level
Structure No : 5/1
Feature Intersected : Indravati river
Name of Bridge : RCC Bridge at km 5.51 of Uttarkashi bypass m/r
Nearest Town : JOSHIYARA
Latitude (Northing) : 30.72505800
Longitude (Easting) : 78.43915600
Construction Year : 2016
Inventory Year : 2020

Geometric

Overall length (in meter) : 50.00
Total No of Span : 1
Maximuam Span (in meter) : 50.00
Span Arragment : 1x50
No of Lane : 1.000
Overall Width (m) : 11.000
Carriageway Width (m) : 7.000
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 7.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1124.593
OFL Ordinary Flood Level : 1119.200
LWL Low Water Level : 1118.200
Design Velocity (m/Sec) : 1.94
Design Discharge (Cumecs) : 518.02
Soffit Level at Centre :
Road Level at Centre : 1129.000
Design Scour Level at Pier :
Design Scour Level at Abutments : 4.750
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class 70R
Load Rating : Class 70R

Super-Structure

Superstructure Type : Box girder
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : plum concrete work
Bank Protection Right Side of Up-stream : plum concrete work
Bank Protection Left Side of Down-stream : plum concrete work
Bank Protection Right Side of Down-stream : plum concrete work
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided