Bridge (ID- 877 ) Inventory Report

GAINDKHAL-AAMSAIN SUSPENSION BRIDGE On Chainage 4.000 of Gaindkhal Dhansi Katghar motor road

Data finalized On 29 May 2024

By VIPIN DHULIYA

Last Rated On 06 Jun 2024

Rating 3.67%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : PD Lansdown

General

Bridge Type : Pedestrain Bridge
Structure No : 4/1
Feature Intersected : HEVAL RIVER
Name of Bridge : GAINDKHAL-AAMSAIN SUSPENSION BRIDGE
Nearest Town : katghar
Latitude (Northing) : 30.00598600
Longitude (Easting) : 78.46878300
Construction Year : 1981
Inventory Year : 2021

Geometric

Overall length (in meter) : 58.00
Total No of Span : 1
Maximuam Span (in meter) : 58.00
Span Arragment : 1x58
No of Lane : 1.000
Overall Width (m) : 1.830
Carriageway Width (m) : 1.830
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.830
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided