Bridge (ID- 880 ) Inventory Report

13.5 meter span bridge On Chainage 87.000 of Pauri Devpryag Gaja Jajal state highway

Data finalized On 15 Jun 2024

By matwar singh Rawat

Last Rated On 15 Jun 2024

Rating 8.17%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : CD Narendnagar

General

Bridge Type : Motor Bridge High Level
Structure No : 1/10
Feature Intersected : Local gadera
Name of Bridge : 13.5 meter span bridge
Nearest Town : Pokhri
Latitude (Northing) : 30.16171900
Longitude (Easting) : 78.26249000
Construction Year : 2018
Inventory Year : 2018

Geometric

Overall length (in meter) : 13.50
Total No of Span : 3
Maximuam Span (in meter) : 13.50
Span Arragment : 1x8
No of Lane : 1.000
Overall Width (m) : 6.500
Carriageway Width (m) : 6.400
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : other
Pier Foundation Type : NA
No of Piers : 2
Abutment Type : Stone Masonry
Pier Type : Stone Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided