Bridge (ID- 881 ) Inventory Report

RCC Bridge Over Local Gadhera On Chainage 3.615 of Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway

Data finalized On 14 Nov 2022

By Gulam Mohammad

Last Rated On 16 May 2024

Rating 0.13%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : PD Ranikhet

General

Bridge Type : Motor Bridge High Level
Structure No : 3/4
Feature Intersected : Over Local Gadhera
Name of Bridge : RCC Bridge Over Local Gadhera
Nearest Town : Bhikysain
Latitude (Northing) : 29.75167500
Longitude (Easting) : 79.23770900
Construction Year : 1990
Inventory Year : 2021

Geometric

Overall length (in meter) : 7.00
Total No of Span : 1
Maximuam Span (in meter) : 6.00
Span Arragment : 1x7
No of Lane : 1.000
Overall Width (m) : 5.250
Carriageway Width (m) : 4.270
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.5
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Pre-cast concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided