Bridge (ID- 893 ) Inventory Report

Baleshawar On Chainage 0.028 of Ramnagar Bhandarpani Amgari Bhorakote Aakhudunga Talli Sati Betalghat Ratora Visalkote Jaina Richi Billekh state highway

Data finalized On 25 Jul 2022

By Punam Bisht

Last Rated On 19 Jun 2024

Rating 5.03%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : PD Ranikhet

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Baleshawar
Name of Bridge : Baleshawar
Nearest Town : Tipola
Latitude (Northing) : 29.56337800
Longitude (Easting) : 79.46178900
Construction Year : 2003
Inventory Year : 2020

Geometric

Overall length (in meter) : 55.00
Total No of Span : 1
Maximuam Span (in meter) : 55.00
Span Arragment : 1x55
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class SV

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : R R 1:6 Masonary Work 5.30m Length
Bank Protection Right Side of Up-stream : R R 1:6 Masonary Work 7.20m Length
Bank Protection Left Side of Down-stream : R R 1:6 Masonary Work 5.00m Length
Bank Protection Right Side of Down-stream : R R 1:6 Masonary Work 7.20m
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided