Bridge (ID- 90 ) Inventory Report

Kosi Bridge On Chainage 79.615 of Jyolikot Almora Karanprayag national highway

Data finalized On 27 Jul 2022

By Er. Balam Singh Jani (AAE)

Last Rated On 21 May 2024

Rating 0.08%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : NH Ranikhet

General

Bridge Type : Motor Bridge High Level
Structure No : 80/4
Feature Intersected : Kosi River
Name of Bridge : Kosi Bridge
Nearest Town : Hawalbagh Kosi
Latitude (Northing) : 29.63153333
Longitude (Easting) : 79.62561111
Construction Year : 1923
Inventory Year : 2020

Geometric

Overall length (in meter) : 30.80
Total No of Span : 1
Maximuam Span (in meter) : 41.10
Span Arragment : 1X30.80
No of Lane : 1.000
Overall Width (m) : 4.750
Carriageway Width (m) : 4.850
RS Footpath Width (m) : 0.375
LS Footpath Width (m) : 0.375
Approch Width i/c Shoulders (m) : 10.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Severe
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Arch
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Filler
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided