Bridge (ID- 93 ) Inventory Report

Sunoli Bridge On Chainage 124.830 of Jyolikot Almora Karanprayag national highway

Data finalized On 03 Aug 2022

By Er. Alok Kumar (AAE)

Last Rated On 21 May 2024

Rating 0.12%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : NH Ranikhet

General

Bridge Type : Motor Bridge High Level
Structure No : 125/4
Feature Intersected : Sunoli Gadhera/Nala
Name of Bridge : Sunoli Bridge
Nearest Town : Kafda
Latitude (Northing) : 29.70920000
Longitude (Easting) : 79.43740000
Construction Year :
Inventory Year : 2020

Geometric

Overall length (in meter) : 17.15
Total No of Span : 1
Maximuam Span (in meter) : 15.30
Span Arragment : 1X15.30
No of Lane : 1.000
Overall Width (m) : 5.250
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Masonry
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided