Bridge (ID- 973 ) Inventory Report

Laxman jhula Pedestrain Bridge On Chainage 1200.000 of Laxman Jhula approach road

Data finalized On 15 Jun 2024

By Er. Rupesh Bhatt

Bridge Yet Not Rated

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : CD Narendnagar

General

Bridge Type : Pedestrain Bridge
Structure No : 2/1
Feature Intersected : Ganga River
Name of Bridge : Laxman jhula Pedestrain Bridge
Nearest Town : Tapovan
Latitude (Northing) : 30.12654600
Longitude (Easting) : 78.32928900
Construction Year : 1929
Inventory Year : 2019

Geometric

Overall length (in meter) : 136.26
Total No of Span : 1
Maximuam Span (in meter) : 136.26
Span Arragment : 1x136.26m
No of Lane : 1.000
Overall Width (m) : 2.200
Carriageway Width (m) : 2.200
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 3.750
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : Stone Masonry
Pier Type : Stone Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided. Bridge is closed for traffic and pedestrians. A new Bajrangsetu bridge is being constructed beside this bridge.