Bridge (ID- 975 ) Inventory Report

Ram Jhula Pedestrain Bridge On Chainage 0.000 of Narendernagar Muni ki Reti bridle road

Data finalized On 15 Jun 2024

By Er. Ashu Sajwan

Last Rated On 12 Nov 2024

Rating 12.78%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : CD Narendnagar

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Ganga River
Name of Bridge : Ram Jhula Pedestrain Bridge
Nearest Town : Swargashram
Latitude (Northing) : 30.12400500
Longitude (Easting) : 78.31403500
Construction Year : 1990
Inventory Year : 2019

Geometric

Overall length (in meter) : 220.40
Total No of Span : 1
Maximuam Span (in meter) : 220.40
Span Arragment : 1x220.40m
No of Lane : 1.000
Overall Width (m) : 2.200
Carriageway Width (m) : 1.900
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 3.750
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Mastic asphalt
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : Stone Masonry
Pier Type : Stone Masonry

Protection Work

Bank Protection Left Side of Up-stream : CC Block protection work
Bank Protection Right Side of Up-stream : Temporary Gabions wall protection work.
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided