Bridge (ID- 984 ) Inventory Report

Suspension bridle bridge Over Ramganga River at near Near Digolibabagh On Chainage 5.250 of Bhikiyasain to Thapla Motor Road

Data finalized On 02 May 2023

By Deepak Samant

Last Rated On 13 Jun 2024

Rating 19.04%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : PD Ranikhet

General

Bridge Type : Pedestrain Bridge
Structure No : 6/2
Feature Intersected : Ramganga River
Name of Bridge : Suspension bridle bridge Over Ramganga River at near Near Digolibabagh
Nearest Town : Thapla
Latitude (Northing) : 29.65308300
Longitude (Easting) : 79.22853600
Construction Year : 1966
Inventory Year : 2021

Geometric

Overall length (in meter) : 67.05
Total No of Span : 1
Maximuam Span (in meter) : 67.05
Span Arragment : 1x67.05
No of Lane : 1.000
Overall Width (m) : 2.050
Carriageway Width (m) : 1.830
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) : 0.00
Design Discharge (Cumecs) : 0.00
Soffit Level at Centre : 0.000
Road Level at Centre : 0.000
Design Scour Level at Pier : 0.000
Design Scour Level at Abutments : 0.000
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Composite
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : Raft
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided