Bridge (ID- 99 ) Inventory Report

Dobra chanthi HMV Suspension Bridge On Chainage 0.622 of Dobra Bridge Heavy vehicle approach road

Data finalized On 01 Aug 2023

By Shri Pramod Negi

Last Rated On 08 Jan 2024

Rating 0.52%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : PD New Tehri

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Bhagirathi River
Name of Bridge : Dobra chanthi HMV Suspension Bridge
Nearest Town : Dobra of Thauldhar Block & Chanthi of Pratapnagr Block
Latitude (Northing) : 30.44759000
Longitude (Easting) : 78.43457000
Construction Year : 2020
Inventory Year : 2020

Geometric

Overall length (in meter) : 725.00
Total No of Span : 22
Maximuam Span (in meter) : 440.00
Span Arragment : 20x13.00+1x440.00+1x25
No of Lane : 1.500
Overall Width (m) : 7.950
Carriageway Width (m) : 5.500
RS Footpath Width (m) : 0.750
LS Footpath Width (m) : 0.750
Approch Width i/c Shoulders (m) : 5.950
Gradient (%age) : 2
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 835.000
OFL Ordinary Flood Level : 830.000
LWL Low Water Level : 740.450
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre : 854.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Severe
Seismic Importance factor : 1.2
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Reinforced concrete
Wearing Coat Type : Mastic asphalt
Expension Joint Type : Modular Strip/Box Seal Joints
Railing/Crash Barrier type : Tubular steel
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : Raft
No of Piers : 18
Abutment Type : RCC Box type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : RCC Toe & Plum Concrete Blocks in 40m Length 4 layer of 1.00m hight avg.Shotcrete work avg. 15X2.00 m
Bank Protection Right Side of Up-stream : RCC Toe & Plum Concrete Blocks in 100m Length 15 layer of 1.00m hight avg.Shotcrete work avg. 100X20.00 m
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : RCC Toe & Plum Concrete Blocks in 100m Length 15 layer of 1.00m hight avg.Shotcrete work avg. 100X20.00 m
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided