Excel Column visibility
Showing 1 to 4 of 4 entries
ID | Final | District | Bridge Type | Loding | Const. Year | Length(m) | Width(m) | Road Chainage | Rating Date | Intersected | Road Type | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1324 |
|
Motor Bridge High Level | Class B | 1976 | 45.00 | 4.600 | 1.000 | 10-06-2024 | POWER RIVER | MDR | ||
1536 |
|
Motor Bridge High Level | Class B | 2012 | 24.00 | 4.900 | 9.000 | 21-05-2024 | local khad | MDR | ||
1537 |
|
Motor Bridge High Level | Class B | 2012 | 27.00 | 4.900 | 11.000 | local khad | MDR | |||
2370 |
|
Motor Bridge High Level | Class A | 2021 | 42.00 | 4.300 | 11.000 | 31-01-2024 | Arakot chinwa balcha | MDR |