1054
|
|
CD Gairsain |
|
Rcc bridge |
T-beam and slab |
Motor Bridge High Level |
NA |
2015 |
15.00 |
4.900 |
1744
|
Shaurya Chakra Vijata Shaheed Raghuveer Singh Chauhan motor road (Khinsar link road)
|
0.796 |
0.98 %
|
31-05-2024
|
Kali river |
Maykholi |
VR
|
|
1055
|
|
CD Gairsain |
|
Rcc bridge |
T-beam and slab |
Motor Bridge High Level |
NA |
2019 |
15.00 |
4.900 |
1744
|
Shaurya Chakra Vijata Shaheed Raghuveer Singh Chauhan motor road (Khinsar link road)
|
2.182 |
0.45 %
|
31-05-2024
|
Kali River |
maikholi |
VR
|
|
1060
|
|
CD Gairsain |
|
Steel girder bridge |
Solid slab |
Pedestrain Bridge |
Footpath Live Load |
2002 |
18.00 |
1.800 |
1744
|
Shaurya Chakra Vijata Shaheed Raghuveer Singh Chauhan motor road (Khinsar link road)
|
1.000 |
3.10 %
|
31-05-2024
|
Rohira Gad |
maikholi |
VR
|
|