ID | Final | Division | District | Bridge Name | Struct Type | Bridge Type | Loding | Const. Year | Length(m) | Width(m) | Road ID | Road Name | Road Chainage | Rating | Rating Date | Intersected | Nearest town | Road Type | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1094 |
|
PD Haridwar | Sidcul four lane bridge | T-beam and slab | Motor Bridge High Level | Class A | 60.00 | 12.500 | 2018 | Bahadarabad-SIDCUL Four lane road (Petrol Pump) to Rawali Mahdud road | 0.400 |
1.00 % |
16-11-2024 | Upper Ganga Canal | Bahadrabad | VR | |||
1097 |
|
PD Haridwar | Sidcul four lane bridge2 | T-beam and slab | Motor Bridge High Level | Class A | 70.00 | 7.500 | 2018 | Bahadarabad-SIDCUL Four lane road (Petrol Pump) to Rawali Mahdud road | 0.500 |
1.38 % |
16-11-2024 | Upper Ganga Canal | Bahadrabad | VR |