Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
149.000 - 149.088
|
88.000 |
29.9141360000, 78.9270810000 |
Estimation Done |
8 |
|
|
|
Installed under road safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
149.400 - 149.432
|
32.000 |
29.9115660000, 78.9258340000 |
Estimation Done |
7 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
149.600 - 149.624
|
24.000 |
29.9098150000, 78.9237530000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
149.700 - 149.744
|
44.000 |
29.9095520000, 78.9237230000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
149.800 - 149.832
|
32.000 |
29.9077510000, 78.9211940000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
150.000 - 150.028
|
28.000 |
29.9133790000, 78.9265650000 |
Estimation Done |
0 |
|
|
|
Installed under road safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
150.150 - 150.174
|
24.000 |
29.9122070000, 78.9261860000 |
Estimation Done |
8 |
|
|
|
Installed under road safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
150.210 - 150.266
|
56.000 |
29.9074790000, 78.9230540000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
150.400 - 150.440
|
40.000 |
29.9071140000, 78.9234610000 |
Estimation Done |
7 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
151.600 - 151.628
|
28.000 |
29.9068750000, 78.9217690000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
151.800 - 151.808
|
8.000 |
29.9030230000, 78.9141920000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
151.850 - 151.898
|
48.000 |
29.9030360000, 78.9140310000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
152.140 - 152.192
|
52.000 |
29.9012550000, 78.9104560000 |
Estimation Done |
7 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
152.200 - 152.236
|
36.000 |
29.9006740000, 78.9072150000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
152.400 - 152.412
|
12.000 |
29.9001900000, 78.9055580000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
152.430 - 152.486
|
56.000 |
29.9000370000, 78.9054220000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
152.600 - 152.624
|
24.000 |
29.8999860000, 78.9081500000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
152.630 - 152.694
|
64.000 |
29.8997490000, 78.9062040000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
152.700 - 152.772
|
72.000 |
29.8997760000, 78.9068920000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
152.800 - 152.844
|
44.000 |
29.8997480000, 78.9098250000 |
Estimation Done |
7 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
153.080 - 153.128
|
48.000 |
29.8996170000, 78.9104040000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
153.150 - 153.194
|
44.000 |
29.8994190000, 78.9110970000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
153.200 - 153.236
|
36.000 |
29.8994840000, 78.9129860000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
154.690 - 154.718
|
28.000 |
29.8974820000, 78.9070380000 |
Estimation Done |
7 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
154.750 - 154.778
|
28.000 |
29.8976920000, 78.9066670000 |
Estimation Done |
7 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
154.960 - 154.996
|
36.000 |
29.8978900000, 78.9049320000 |
Estimation Done |
10 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
162.600 - 162.648
|
48.000 |
29.8990630000, 78.8601060000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
162.750 - 162.770
|
20.000 |
29.8981890000, 78.8581820000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
162.820 - 162.848
|
28.000 |
29.8978890000, 78.8577260000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
163.850 - 163.926
|
76.000 |
29.9005850000, 78.8492310000 |
Estimation Done |
6 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
169.550 - 169.614
|
64.000 |
29.9013770000, 78.8193450000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
169.580 - 169.588
|
8.000 |
29.9009520000, 78.8189630000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
169.700 - 169.712
|
12.000 |
29.0094600000, 78.8178860000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
169.900 - 169.952
|
52.000 |
29.0000000000, 78.0000000000 |
Estimation Done |
8 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
170.050 - 170.094
|
44.000 |
29.9040450000, 78.8167590000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
170.200 - 170.256
|
56.000 |
29.9056770000, 78.8154800000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
170.600 - 170.632
|
32.000 |
29.9063630000, 78.8144250000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
170.700 - 170.776
|
76.000 |
29.9064470000, 78.8142890000 |
Estimation Done |
9 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
170.800 - 170.848
|
48.000 |
29.9086340000, 78.8111320000 |
Estimation Done |
9 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
171.020 - 171.096
|
76.000 |
29.9090570000, 78.8100670000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
171.100 - 171.124
|
24.000 |
29.9096610000, 78.8101370000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
171.600 - 171.684
|
84.000 |
29.9143040000, 78.8077460000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
171.800 - 171.832
|
32.000 |
29.9158450000, 78.8075310000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
172.010 - 172.118
|
108.000 |
29.9153800000, 78.8069050000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
172.600 - 172.624
|
24.000 |
29.9111920000, 78.8044660000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
172.700 - 172.736
|
36.000 |
29.9106940000, 78.8042180000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
172.800 - 172.856
|
56.000 |
29.9106660000, 78.8038580000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
173.020 - 173.068
|
48.000 |
29.9098780000, 78.8023200000 |
Estimation Done |
7 |
2024-12-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
173.200 - 173.284
|
84.000 |
29.9101970000, 78.8026220000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
173.300 - 173.376
|
76.000 |
29.9093820000, 78.8025230000 |
Estimation Done |
10 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
174.200 - 174.228
|
28.000 |
29.9048700000, 78.7940690000 |
Estimation Done |
9 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
174.300 - 174.364
|
64.000 |
29.9048870000, 78.7933070000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
174.400 - 174.420
|
20.000 |
29.0000000000, 78.0000000000 |
Estimation Done |
9 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
175.850 - 175.942
|
92.000 |
29.8989030000, 78.7932510000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
176.010 - 176.082
|
72.000 |
29.8980920000, 78.7893640000 |
Estimation Done |
7 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
176.600 - 176.656
|
56.000 |
29.8951730000, 78.7842880000 |
Estimation Done |
10 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
180.000 - 180.040
|
40.000 |
29.9006080000, 78.7631360000 |
Estimation Done |
10 |
|
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
180.041 - 180.057
|
16.000 |
29.9008530000, 78.7629280000 |
Estimation Done |
10 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
180.070 - 180.086
|
16.000 |
29.9007490000, 78.7627070000 |
Estimation Done |
10 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
180.600 - 180.672
|
72.000 |
29.9010080000, 78.7624580000 |
Estimation Done |
8 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
181.600 - 181.656
|
56.000 |
29.9069450000, 78.7659180000 |
Estimation Done |
9 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[62]
Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)
|
Crash barrier |
181.750 - 181.794
|
44.000 |
29.9066730000, 78.7652960000 |
Estimation Done |
9 |
2024-01-27 00:00:00 |
|
|
installed under Roads safety |
Dec 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
0.125
|
-- |
30.1242700000, 78.9028500000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
0.325
|
-- |
30.1236300000, 78.9032600000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
0.500
|
-- |
30.1227800000, 78.9042400000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
0.625
|
-- |
30.1226600000, 78.9049300000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
0.650
|
-- |
30.1225700000, 78.9054100000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
0.750
|
-- |
30.1227100000, 78.9057100000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
1.025
|
-- |
30.1241000000, 78.9042900000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
1.175
|
-- |
30.1246100000, 78.9056600000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
1.275
|
-- |
30.1253600000, 78.9049900000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
1.500
|
-- |
30.1254500000, 78.9042000000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
1.625
|
-- |
30.1262200000, 78.9051200000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
1.700
|
-- |
30.1257200000, 78.9052100000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
1.900
|
-- |
30.1258100000, 78.9027300000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
2.100
|
-- |
30.1245700000, 78.9061500000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
2.275
|
-- |
30.1242000000, 78.9065300000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
2.400
|
-- |
30.1247400000, 78.9077700000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
2.500
|
-- |
30.1234600000, 78.9085300000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Scupper |
2.750
|
-- |
30.1223500000, 78.9079800000 |
|
|
|
|
|
scupper |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Parapet |
0.050
|
-- |
30.1248600000, 78.9023900000 |
|
|
|
|
|
Parapet (Plum) |
Jan 2024 |
[3446]
Bidoli Ghunna motor road
|
Parapet |
1.400
|
-- |
30.1252600000, 78.9036400000 |
|
|
|
|
|
Parapet (plum) |
Jan 2024 |
[54]
Karanprayg Nauti Paithani state highway
|
Slide Zone |
58.000 - 58.200
|
200.000 |
30.1768487000, 79.0800382000 |
Estimation Done |
10 |
|
|
|
|
Jan 2024 |