All Features Report For CD Uttarkashi
Road Segment Feature Chainage Length Cordinates Status Priority Install Date Repair Date Repair events Remark Updated On
[27] Badethi Banchora Bhadrigad state highway culvert 33.250 - 33.256 6.000 30.6418550000, 78.2145800000 Estimation Done 10 culvert is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cause way 29.200 - 29.215 15.000 30.6481880000, 78.2280320000 Identified 10 cause is urgently required for water management Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cause way 29.400 - 29.415 15.000 30.6488810000, 78.2269470000 Identified 10 causeway is urgently required Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cause way 30.900 - 30.913 13.000 30.6478080000, 78.2199440000 Identified 10 causeway is required for watermanagement Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cause way 36.100 - 36.115 15.000 30.6334310000, 78.2146010000 Treatment in Progress 10 causeway is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cause way 39.800 - 39.815 15.000 30.6348950000, 78.1945580000 Treatment in Progress 10 cause is partially damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cause way 41.100 - 41.112 12.000 30.6400180000, 78.1956260000 Identified 8 cause way is required Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cause way 41.750 - 41.764 14.000 30.6438680000, 78.1949750000 Identified 10 causeway is required Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cause way 42.050 - 42.065 15.000 30.6466890000, 78.1940190000 Identified 10 causeway is required Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cause way 44.225 - 44.237 12.000 30.6500290000, 78.1781140000 Estimation Done 6 2024-03-15 00:00:00 2 causeway is constructed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 28.900 0.000 30.6470510000, 78.2306940000 Estimation Done 6 cautionary board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 31.200 0.000 30.6460830000, 78.2176630000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 34.750 0.000 30.6410000000, 78.2135590000 Estimation Done 6 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 35.850 0.000 30.6292400000, 78.2155170000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 36.900 0.000 30.6292400000, 78.2155170000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 37.200 0.000 30.6299810000, 78.2123560000 Estimation Done 5 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 37.500 0.000 30.6309020000, 78.2099120000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 39.100 0.000 30.6312210000, 78.1970350000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 39.600 0.000 30.6322800000, 78.1935470000 Estimation Done 5 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 41.100 0.000 30.6400180000, 78.1956260000 Sanctioned 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 41.400 0.000 30.6414620000, 78.1942880000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 41.700 0.000 30.6435950000, 78.1944440000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 44.200 0.000 30.6500290000, 78.1781140000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 44.700 0.000 30.6462560000, 78.1790970000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 45.000 0.000 30.6447680000, 78.1804010000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Cautionary board 47.150 0.000 30.6358920000, 78.1755340000 Estimation Done 0 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Informatory board 35.900 0.000 30.6356570000, 78.2161120000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Informatory board 50.200 0.000 30.6298430000, 78.1642140000 Estimation Done 7 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Informatory board 53.150 0.000 30.6155460000, 78.1670750000 Estimation Done 6 board is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 28.300 0.000 30.6434910000, 78.2328000000 Sanctioned 8 scupper required maintainance Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 28.500 0.000 30.6452320000, 78.2327940000 Sanctioned 8 scupper is required maintain Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 28.825 0.000 30.6468710000, 78.2316790000 Sanctioned 8 scupper required maintainance Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 29.100 0.000 30.6471760000, 78.2295070000 Treatment in Progress 8 Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 29.250 0.000 30.6481880000, 78.2280320000 Sanctioned 8 scupper is half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 29.850 0.000 30.6516030000, 78.2251660000 Sanctioned 10 scupper is half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 30.100 0.000 30.6522790000, 78.2231850000 Sanctioned 8 scupper is half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 30.250 0.000 30.6518630000, 78.2228340000 Sanctioned 8 scupper is half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 30.450 0.000 30.6504200000, 78.2217200000 Sanctioned 8 scupper is half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 30.600 0.000 30.6491240000, 78.2209000000 Sanctioned 8 scupper is half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 31.200 0.000 30.6460830000, 78.2176630000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 31.600 0.000 30.6455450000, 78.2158420000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 31.700 0.000 30.6460740000, 78.2157550000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 31.775 0.000 30.6470500000, 78.2155050000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 32.275 0.000 30.6472610000, 78.2136200000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 33.300 0.000 30.6420100000, 78.2145800000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 33.500 0.000 30.6408150000, 78.2153320000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 34.150 0.000 30.6392910000, 78.2176880000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 34.750 0.000 30.6410000000, 78.2135590000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 35.350 0.000 30.6387550000, 78.2170360000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 35.700 0.000 30.6363900000, 78.2166580000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 37.400 0.000 30.6308410000, 78.2112030000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 38.500 0.000 30.6328130000, 78.2022720000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 38.700 0.000 30.6316130000, 78.2002000000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 38.900 0.000 30.6307570000, 78.1997530000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 39.150 0.000 30.6312210000, 78.1970350000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 39.400 0.000 30.6316870000, 78.1961600000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 39.600 0.000 30.6326830000, 78.1938230000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 39.750 0.000 30.6336770000, 78.1945470000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 40.200 0.000 30.6367850000, 78.1937680000 Treatment in Progress 8 scupper is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 40.600 0.000 30.6378120000, 78.1934450000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 40.700 0.000 30.6375370000, 78.1954600000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 40.775 0.000 30.6383470000, 78.1964080000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 41.100 0.000 30.6400180000, 78.1956260000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 41.200 0.000 30.6407990000, 78.1945800000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 41.400 0.000 30.6419840000, 78.1950260000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 41.450 0.000 30.6426120000, 78.1947900000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 41.700 0.000 30.6435950000, 78.1944440000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 41.800 0.000 30.6443700000, 78.1949910000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 42.100 0.000 30.6461640000, 78.1944740000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 42.150 0.000 30.6472270000, 78.1936430000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 42.275 0.000 30.6478240000, 78.1930950000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 42.600 0.000 30.6486050000, 78.1909890000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 42.700 0.000 30.6494440000, 78.1897500000 Sanctioned 5 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 42.775 0.000 30.6494750000, 78.1897280000 Sanctioned 8 Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 43.000 0.000 30.6503360000, 78.1876030000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 43.200 0.000 30.6509840000, 78.1876030000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 43.500 0.000 30.6512250000, 78.1836710000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 43.575 0.000 30.6510720000, 78.1830130000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 43.700 0.000 30.6510360000, 78.1823810000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 43.850 0.000 30.6507170000, 78.1806520000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 44.450 0.000 30.6484650000, 78.1791250000 Identified 8 scupper is required Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 44.500 0.000 30.6478430000, 78.1792300000 Identified 8 required scupper Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 44.575 0.000 30.6472760000, 78.1790770000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 44.700 0.000 30.6462560000, 78.1790970000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 44.950 0.000 30.6447870000, 78.1800240000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 45.200 0.000 30.6439910000, 78.1816620000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 45.450 0.000 30.6427510000, 78.1820360000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 45.575 0.000 30.6422550000, 78.1821430000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 45.700 0.000 30.6414950000, 78.1817340000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 45.775 0.000 30.6407800000, 78.1811980000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 45.950 0.000 30.6402990000, 78.1801280000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 46.050 0.000 30.6406310000, 78.1790590000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 46.100 0.000 30.6406600000, 78.1786960000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 46.175 0.000 30.6400100000, 78.1781930000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 46.450 0.000 30.6399000000, 78.1764780000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 46.800 0.000 30.6394170000, 78.1748490000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 46.900 0.000 30.6375130000, 78.1756680000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 47.000 0.000 30.6369430000, 78.1765143000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 47.050 0.000 30.6365570000, 78.1768800000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 47.150 0.000 30.6361490000, 78.1770340000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 47.300 0.000 30.6358920000, 78.1755340000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 47.650 0.000 30.6364670000, 78.1732230000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 48.050 0.000 30.6375380000, 78.1697520000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 48.200 0.000 30.6377930000, 78.1695860000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 48.700 0.000 30.6348100000, 78.1684920000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 49.050 0.000 30.6360370000, 78.1651230000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 49.150 0.000 30.6357010000, 78.1646610000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 49.250 0.000 30.6343660000, 78.1646500000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 49.450 0.000 30.6341330000, 78.1634550000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 49.600 0.000 30.6332040000, 78.1635550000 Identified 8 required scupper Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 49.800 0.000 30.6323580000, 78.1656650000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 49.950 0.000 30.6129390000, 78.1622150000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 50.050 0.000 30.6297590000, 78.1627080000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 50.275 0.000 30.6298470000, 78.1656140000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 50.450 0.000 30.6281110000, 78.1655750000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 50.700 0.000 30.6270850000, 78.1668300000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 50.775 0.000 30.6270600000, 78.1677340000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 51.050 0.000 30.6265610000, 78.1683890000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 51.275 0.000 30.6252090000, 78.1663590000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 51.500 0.000 30.6248690000, 78.1646610000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 51.875 0.000 30.6216010000, 78.1631770000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 52.175 0.000 30.6205850000, 78.1647210000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 52.275 0.000 30.6196200000, 78.1650760000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 52.500 0.000 30.6190900000, 78.1670090000 Sanctioned 8 half choked Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 52.750 0.000 30.6180100000, 78.1680610000 Identified 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 52.950 0.000 30.6172520000, 78.1682850000 Sanctioned 8 half chokee Jul 2024
[27] Badethi Banchora Bhadrigad state highway Scupper 53.300 0.000 30.6141140000, 78.1673280000 Sanctioned 8 half choke Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 28.500 - 28.510 10.000 30.6452320000, 78.2327940000 Treatment in Progress 10 parapet is damaged Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 35.000 - 35.015 15.000 30.6348780000, 78.2156030000 Treatment in Progress 8 parapet is damaged Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 36.000 - 36.024 24.000 30.6287240000, 78.2144540000 Treatment in Progress 8 parapet is damaged Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 37.400 - 37.412 12.000 30.6308410000, 78.2112030000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 38.250 - 38.271 21.000 30.6321730000, 78.2034340000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 38.400 - 38.415 15.000 30.6328130000, 78.2022720000 Estimation Done 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 39.500 - 39.512 12.000 30.6405680000, 78.2159160000 Treatment in Progress 10 parapet is damaged Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 44.400 - 44.416 16.000 30.6478430000, 78.1792300000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 44.475 - 44.490 15.000 30.6472760000, 78.1790770000 Treatment in Progress 0 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 45.475 - 45.499 24.000 30.6422550000, 78.1821430000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 45.700 - 45.721 21.000 30.6418470000, 78.1817880000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 45.950 - 45.971 21.000 30.6402990000, 78.1801280000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 45.950 - 45.977 27.000 30.6402990000, 78.1801280000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 46.000 - 46.021 21.000 30.6369430000, 78.1765130000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 46.400 - 46.421 21.000 30.6399000000, 78.1764780000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 46.500 - 46.521 21.000 30.6399000000, 78.1764780000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 46.800 - 46.821 21.000 30.6418470000, 78.1817880000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 47.550 - 47.568 18.000 30.6359740000, 78.1735790000 Identified 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Parapet 48.550 - 48.571 21.000 30.6347660000, 78.1694300000 Treatment in Progress 8 parapet is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Puccadrain 40.700 - 40.750 50.000 30.6375370000, 78.1954600000 Treatment in Progress 8 drain is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Puccadrain 43.250 - 43.600 350.000 30.6513040000, 78.1859880000 Treatment in Progress 8 drain is damaged Jul 2024
[27] Badethi Banchora Bhadrigad state highway Puccadrain 44.750 - 44.850 100.000 30.6452210000, 78.1794900000 Treatment in Progress 8 drain is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Puccadrain 45.200 - 45.500 300.000 30.6435640000, 78.1826730000 Treatment in Progress 10 drain is damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Puccadrain 46.100 - 46.150 50.000 30.6406600000, 78.1786960000 Treatment in Progress 0 drain is partially damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Puccadrain 53.100 - 53.200 100.000 30.6160920000, 78.1669620000 Treatment in Progress 10 drain is partially damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 28.100 - 28.120 20.000 30.6425910000, 78.2339420000 Estimation Done 5 delinator is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 28.800 - 28.815 15.000 30.6470030000, 78.2319870000 Estimation Done 5 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 37.200 - 37.208 8.000 30.6295810000, 78.2123560000 Estimation Done 5 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 37.400 - 37.412 12.000 30.6308410000, 78.2112030000 Estimation Done 5 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 37.500 - 37.512 12.000 30.6309020000, 78.2099120000 Treatment in Progress 8 delinator is installed but some are damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 37.700 - 37.715 15.000 30.6314030000, 78.2089190000 Treatment in Progress 6 delinator is installed but damage in some quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 38.100 - 38.128 28.000 30.6319630000, 78.2060930000 Estimation Done 6 delinator is installed Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 38.300 - 38.315 15.000 30.6321730000, 78.2034340000 Estimation Done 6 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 38.700 - 38.712 12.000 30.6316130000, 78.2002000000 Estimation Done 6 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 39.100 - 39.121 21.000 30.6304890000, 78.1986180000 Identified 7 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 39.400 - 39.414 14.000 30.6319170000, 78.1941300000 Estimation Done 6 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 40.600 - 40.615 15.000 30.6378120000, 78.1942240000 Estimation Done 6 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 40.800 - 40.820 20.000 30.6383470000, 78.1964080000 Estimation Done 6 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 41.400 - 41.415 15.000 30.6414620000, 78.1942880000 Treatment in Progress 8 delinator is installed but damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 50.000 - 50.020 20.000 30.6340600000, 78.1624950000 Estimation Done 8 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 50.775 - 50.790 15.000 30.6270600000, 78.1677340000 Estimation Done 8 delinator is installed but not in required quantity Jul 2024
[27] Badethi Banchora Bhadrigad state highway Delimetor 51.800 - 51.812 12.000 30.6224340000, 78.1633250000 Treatment in Progress 8 delinator is installed but damage Jul 2024
[27] Badethi Banchora Bhadrigad state highway Black spot 36.750 - 36.780 30.000 30.6291710000, 78.2159760000 Identified 10 treatment is required for avoid mishappening in future Jul 2024
[27] Badethi Banchora Bhadrigad state highway Black spot 37.775 - 37.800 25.000 30.6319630000, 78.2060930000 Identified 10 treatment is required for avoid mishappening in future Jul 2024
[27] Badethi Banchora Bhadrigad state highway Black spot 38.250 - 38.280 30.000 30.6319630000, 78.2060930000 Identified 10 treatment is required for avoid mishappening in future Jul 2024
[27] Badethi Banchora Bhadrigad state highway Black spot 40.075 - 40.105 30.000 30.6374710000, 78.1934450000 Identified 10 treatment is required Jul 2024
[27] Badethi Banchora Bhadrigad state highway Black spot 46.000 - 46.025 25.000 30.6406310000, 78.1794840000 Identified 10 Accident prone area Jul 2024
[27] Badethi Banchora Bhadrigad state highway Slide Zone 48.250 - 48.275 25.000 30.6358220000, 78.1755340000 Identified 10 treatment is required in slide part Jul 2024
[27] Badethi Banchora Bhadrigad state highway Slide Zone 51.800 - 51.840 40.000 30.6224340000, 78.1633250000 Identified 10 very danger point Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Cause way 62.600 - 62.608 7.500 30.6293250000, 78.2126220000 Identified 10 requried Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Cause way 68.975 - 68.982 7.000 30.7336111100, 78.3386111100 Estimation Done 0 good condition Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Cause way 75.875 - 75.883 8.000 30.5975830000, 78.2216970000 Identified 10 requried cause way Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Cause way 78.500 - 78.507 7.000 30.7858333300, 78.2541666700 Identified 10 requried Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Cause way 78.600 - 78.608 7.500 30.5974070000, 78.2217120000 Identified 10 requried Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 25.550 0.000 30.8336111100, 78.4833333300 Estimation Done 0 good condition Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 60.125 0.000 30.6666666700, 78.4761111100 Estimation Done 0 Good condition Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 61.450 0.000 30.6427777800, 78.4491666700 Estimation Done 0 good condition Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 61.675 0.000 30.8686111100, 78.4516666700 Estimation Done 0 good condition Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 65.450 0.000 30.8102777800, 78.2005555600 Estimation Done 0 good condition Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 65.650 0.000 30.8180555600, 78.4005555600 Estimation Done 0 good condition Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 66.550 0.000 30.7716666700, 78.3369444400 Estimation Done 0 good condtion Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 66.700 0.000 30.8186111100, 78.3475000000 Estimation Done 0 good condtion Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 67.400 0.000 30.7744444400, 78.3738888900 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 68.050 0.000 30.7750000000, 78.2530555600 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 68.650 0.000 30.7050000000, 78.2286111100 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 68.850 0.000 30.7208333300, 78.2369444400 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 69.200 0.000 30.7713888900, 78.2986111100 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 69.350 0.000 30.7672222200, 78.3022222200 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 69.500 0.000 30.7652777800, 78.3180555600 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 69.550 0.000 30.7594444400, 78.3180555600 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 69.625 0.000 30.7569444400, 78.3213888900 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 70.000 0.000 30.3955968000, 78.3611111100 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 70.200 0.000 30.7172222200, 78.3352777800 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 70.350 0.000 30.7119444400, 78.3441666700 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 70.450 0.000 30.6991666700, 78.3611111100 Estimation Done 8 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 70.600 0.000 30.6875000000, 78.3308333300 Estimation Done 9 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 70.700 0.000 30.6736111100, 78.3416666700 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 71.700 0.000 30.8683333300, 78.3400000000 Estimation Done 9 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 72.300 0.000 30.8772222200, 78.3947222200 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 72.650 0.000 30.8497222200, 78.4041666700 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 73.250 0.000 30.8152777800, 78.4566666700 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 73.800 0.000 30.7877777800, 78.4558333300 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 73.900 0.000 30.8563888900, 78.4041666700 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 74.925 0.000 30.7352777800, 78.4513888900 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 75.200 0.000 30.6536111100, 78.2025000000 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 75.500 0.000 30.6344444400, 78.3511111100 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 75.575 0.000 30.6369444400, 78.3369444400 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 75.700 0.000 30.6430555600, 78.3227777800 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 75.800 0.000 30.6719444400, 78.2825000000 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 75.850 0.000 30.6397222200, 78.2622222200 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 76.200 0.000 30.6338888900, 78.2611111100 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 76.350 0.000 30.6347222200, 78.2622222200 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 76.700 0.000 30.6444444400, 78.2327777800 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 77.125 0.000 30.6055555600, 78.2586111100 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 77.200 0.000 30.6175000000, 78.2919444400 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 77.300 0.000 30.6094444400, 78.2991666700 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 78.075 0.000 30.8105555600, 78.3452777800 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 78.300 0.000 30.7738888900, 78.3347222200 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 78.425 0.000 30.7738888900, 78.3677777800 Estimation Done 0 Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 78.550 0.000 30.7516666700, 78.2808333300 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 78.875 0.000 30.7072222200, 78.3461111100 Estimation Done 0 good Jul 2024
[92] Silkyara Bangaon Chapda Sarot state highway Scupper 78.950 0.000 30.7072222200, 78.3008333300 Estimation Done 0 good Jul 2024
[5102] HRT to Jaspur motor road. Scupper 0.000 -- 30.6168350000, 78.3292320000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 0.200 -- 30.6179960000, 78.3305180000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 0.400 -- 30.6199090000, 78.3316550000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 0.600 -- 30.6202450000, 78.3328390000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 0.800 -- 30.5873760000, 78.3347090000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 1.100 -- 30.6220920000, 78.3329710000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 1.300 -- 30.5940610000, 78.3329340000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 1.450 -- 30.6242290000, 78.3323700000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 1.700 -- 30.6187210000, 78.3332140000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 1.900 -- 30.6223140000, 78.3343170000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 2.100 -- 30.6187210000, 78.3362050000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 2.350 -- 30.6218340000, 78.3363140000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 2.600 -- 30.6247560000, 78.3346130000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 2.800 -- 30.6249910000, 78.3345480000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 3.050 -- 30.6236720000, 78.3354330000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 3.250 -- 30.6227410000, 78.3363210000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 3.475 -- 30.6216890000, 78.3382800000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 3.600 -- 30.6211340000, 78.3401570000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 3.750 -- 30.6207260000, 78.3409000000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 4.000 -- 30.6212630000, 78.3401850000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 4.200 -- 30.6216790000, 78.3395830000 1 m span RCC scupper Jan 2024
[5102] HRT to Jaspur motor road. Scupper 4.325 -- 30.6221360000, 78.3390680000 1 m span RCC scupper Jan 2024
[168] Dharasu Devisaur Malli bend Jogat motor road Slide Zone 2.575 - 2.925 350.000 30.6076581500, 78.3230675700 Identified 6 2014-07-13 00:00:00 2016-08-04 00:00:00 1 स्लाईड जोन का उपचार किया जाना अत्यन्त आवश्यक है। आगणन गठित करने की कार्यवाही की जा रही है। Jan 2024