[98]
Uttarkashi Ghansali Tilwara state highway
|
culvert |
98.250 - 98.258
|
8.000 |
30.4318170000, 78.6537300000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.153 - 67.178
|
25.000 |
30.5215520000, 78.5533970000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.178 - 67.194
|
16.000 |
30.5217470000, 78.5533380000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.194 - 67.203
|
9.000 |
30.5218730000, 78.5533020000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.203 - 67.243
|
40.000 |
30.5219700000, 78.5532440000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.243 - 67.264
|
21.000 |
30.5223300000, 78.5532890000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.264 - 67.304
|
40.000 |
30.5224640000, 78.5533660000 |
Treatment in Progress |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.348 - 67.380
|
32.000 |
30.5229670000, 78.5539530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.420 - 67.444
|
24.000 |
30.5236460000, 78.5541460000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.444 - 67.464
|
20.000 |
30.5237170000, 78.5544160000 |
Treatment in Progress |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.464 - 67.481
|
17.000 |
30.5236670000, 78.5546930000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.511 - 67.571
|
60.000 |
30.5237180000, 78.5550770000 |
Treatment in Progress |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.572 - 67.596
|
24.000 |
30.5239720000, 78.5555430000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.706 - 67.738
|
32.000 |
30.5247570000, 78.5565300000 |
Treatment in Progress |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
67.768 - 67.796
|
28.000 |
30.5252900000, 78.5566720000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.024 - 68.080
|
56.000 |
30.5251990000, 78.5585580000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.116 - 68.172
|
56.000 |
30.5254340000, 78.5593850000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.216 - 68.304
|
88.000 |
30.5257790000, 78.5603120000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.308 - 68.351
|
43.000 |
30.4934890000, 78.6167010000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.366 - 68.402
|
36.000 |
30.5264260000, 78.5615780000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.436 - 68.460
|
24.000 |
30.5268140000, 78.5620540000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.558 - 68.598
|
40.000 |
30.5276470000, 78.5612480000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.662 - 68.670
|
8.000 |
30.5284720000, 78.5610480000 |
Treatment in Progress |
8 |
|
|
|
panels are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.674 - 68.698
|
24.000 |
30.5285410000, 78.5611470000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
68.826 - 68.866
|
40.000 |
30.5292880000, 78.5621990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
69.000 - 69.060
|
60.000 |
30.5303170000, 78.5628400000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
69.060 - 69.132
|
72.000 |
30.5306280000, 78.5632270000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
69.210 - 69.378
|
168.000 |
30.5307880000, 78.5644750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
69.419 - 69.479
|
60.000 |
30.5320870000, 78.5652340000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
69.491 - 69.719
|
228.000 |
30.5318510000, 78.5658680000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
69.724 - 69.988
|
264.000 |
30.5313720000, 78.5680700000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.031 - 70.067
|
36.000 |
30.5338020000, 78.5677350000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.082 - 70.514
|
432.000 |
30.5340800000, 78.5675030000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.548 - 70.568
|
20.000 |
30.5311800000, 78.5696750000 |
Treatment in Progress |
8 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.568 - 70.616
|
48.000 |
30.5310700000, 78.5698320000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.616 - 70.724
|
108.000 |
30.5307280000, 78.5699880000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.731 - 70.745
|
14.000 |
30.5302520000, 78.5705820000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.745 - 70.809
|
64.000 |
30.5304300000, 78.5707250000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.811 - 70.853
|
42.000 |
30.5308460000, 78.5712050000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.853 - 70.881
|
28.000 |
30.5310470000, 78.5714270000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.878 - 70.923
|
45.000 |
30.5309810000, 78.5711600000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.920 - 70.932
|
12.000 |
30.5308200000, 78.5708730000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.932 - 70.996
|
64.000 |
30.5308970000, 78.5709550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
70.994 - 71.003
|
9.000 |
30.5311220000, 78.5715280000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.000 - 71.086
|
86.000 |
30.5310090000, 78.5717560000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.086 - 71.096
|
10.000 |
30.5304320000, 78.5719430000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.096 - 71.140
|
44.000 |
30.5304140000, 78.5720750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.136 - 71.150
|
14.000 |
30.5301050000, 78.5722800000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.150 - 71.358
|
208.000 |
30.5299440000, 78.5723580000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.399 - 71.463
|
64.000 |
30.5282610000, 78.5735720000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.463 - 71.481
|
18.000 |
30.5283570000, 78.5729790000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.482 - 71.554
|
72.000 |
30.5283930000, 78.5727650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.568 - 71.640
|
72.000 |
30.5285950000, 78.5714100000 |
Treatment in Progress |
8 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.638 - 71.694
|
56.000 |
30.5286700000, 78.5712770000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.699 - 71.714
|
15.000 |
30.5286750000, 78.5706870000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.714 - 71.770
|
56.000 |
30.5286310000, 78.5705250000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.768 - 71.779
|
11.000 |
30.5287730000, 78.5700150000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.779 - 71.855
|
76.000 |
30.5288260000, 78.5688260000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.861 - 71.909
|
48.000 |
30.5285020000, 78.5694680000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
71.923 - 71.948
|
25.000 |
30.5279710000, 78.5694840000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.014 - 72.036
|
22.000 |
30.5272960000, 78.5694370000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.036 - 72.156
|
120.000 |
30.5273370000, 78.5692190000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.233 - 72.268
|
35.000 |
30.5275940000, 78.5679770000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.268 - 72.360
|
92.000 |
30.5275020000, 78.5676970000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.364 - 72.388
|
24.000 |
30.5269610000, 78.5670010000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.401 - 72.411
|
10.000 |
30.5267170000, 78.5668320000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.411 - 72.515
|
104.000 |
30.5266570000, 78.5669050000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.539 - 72.581
|
42.000 |
30.5258520000, 78.5677370000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.581 - 72.637
|
56.000 |
30.5257200000, 78.5673180000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.639 - 72.654
|
15.000 |
30.5253880000, 78.5669550000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.654 - 72.678
|
24.000 |
30.5252780000, 78.5668160000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.711 - 72.736
|
25.000 |
30.5249130000, 78.5666270000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.736 - 72.784
|
48.000 |
30.5247870000, 78.5669010000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.790 - 72.798
|
8.000 |
30.5247350000, 78.5674330000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.798 - 72.850
|
52.000 |
30.5247320000, 78.5675130000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.849 - 72.869
|
20.000 |
30.5246830000, 78.5677830000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
72.869 - 72.925
|
56.000 |
30.5246580000, 78.5682350000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.000 - 73.048
|
48.000 |
30.5243820000, 78.5687590000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.052 - 73.074
|
22.000 |
30.5245900000, 78.5693240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.074 - 73.086
|
12.000 |
30.5245970000, 78.5695860000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.086 - 73.098
|
12.000 |
30.5245940000, 78.5697200000 |
Treatment in Progress |
7 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.098 - 73.110
|
12.000 |
30.5245590000, 78.5698250000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.207 - 73.243
|
36.000 |
30.5241170000, 78.5704130000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.315 - 73.473
|
158.000 |
30.5241100000, 78.5714700000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.501 - 73.741
|
240.000 |
30.5237800000, 78.5731020000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.742 - 73.848
|
106.000 |
30.5218570000, 78.5725920000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
73.848 - 73.884
|
36.000 |
30.5220190000, 78.5734250000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.000 - 74.036
|
36.000 |
30.5223690000, 78.5746870000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.036 - 74.064
|
28.000 |
30.5225850000, 78.5749580000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.081 - 74.129
|
48.000 |
30.5229320000, 78.5750610000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.129 - 74.220
|
91.000 |
30.5229070000, 78.5755420000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.220 - 74.280
|
60.000 |
30.5224620000, 78.5763400000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.293 - 74.365
|
72.000 |
30.5229800000, 78.5768390000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.365 - 74.390
|
25.000 |
30.5227180000, 78.5775180000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.390 - 74.590
|
200.000 |
30.5226770000, 78.5777630000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.590 - 74.607
|
17.000 |
30.5218900000, 78.5792980000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.607 - 74.803
|
196.000 |
30.5218280000, 78.5794900000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.803 - 74.896
|
93.000 |
30.5213670000, 78.5812830000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.896 - 74.920
|
24.000 |
30.5208010000, 78.5818000000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.927 - 74.935
|
8.000 |
30.5206290000, 78.5819880000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
74.936 - 74.974
|
38.000 |
30.5205290000, 78.5819580000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
75.000 - 75.214
|
214.000 |
30.5202900000, 78.5817220000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
75.214 - 75.260
|
46.000 |
30.5192780000, 78.5799580000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
75.260 - 75.976
|
716.000 |
30.5189530000, 78.5800380000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.000 - 76.008
|
8.000 |
30.5174750000, 78.5867900000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.008 - 76.196
|
188.000 |
30.5173800000, 78.5868100000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.197 - 76.208
|
11.000 |
30.5162850000, 78.5880600000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.208 - 76.244
|
36.000 |
30.5161780000, 78.5880630000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.246 - 76.261
|
15.000 |
30.5158430000, 78.5880230000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.261 - 76.377
|
116.000 |
30.5157070000, 78.5880600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.427 - 76.443
|
16.000 |
30.5145710000, 78.5887860000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.444 - 76.462
|
18.000 |
30.5146850000, 78.5888930000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.462 - 76.570
|
108.000 |
30.5148070000, 78.5888890000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.571 - 76.602
|
31.000 |
30.5156920000, 78.5883200000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.612 - 76.651
|
39.000 |
30.5159710000, 78.5882970000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.641 - 76.757
|
116.000 |
30.5162690000, 78.5884050000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.825 - 76.849
|
24.000 |
30.5173650000, 78.5873650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.855 - 76.923
|
68.000 |
30.5175250000, 78.5871250000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.929 - 76.985
|
56.000 |
30.5182300000, 78.5182300000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
76.995 - 77.008
|
13.000 |
30.5183300000, 78.5865170000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
77.000 - 77.410
|
410.000 |
30.5183300000, 78.5865170000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
77.410 - 77.474
|
64.000 |
30.5196450000, 78.5840750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
77.474 - 77.494
|
20.000 |
30.5198030000, 78.5846820000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
77.504 - 77.574
|
70.000 |
30.5198950000, 78.5848540000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
77.668 - 77.856
|
188.000 |
30.5210750000, 78.5850630000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
77.856 - 77.940
|
84.000 |
30.5223420000, 78.5848880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.018 - 78.082
|
64.000 |
30.5232450000, 78.5844350000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.084 - 78.211
|
127.000 |
30.5237880000, 78.5842930000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.225 - 78.261
|
36.000 |
30.5249290000, 78.5848290000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.264 - 78.308
|
44.000 |
30.5247530000, 78.5851680000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.334 - 78.611
|
277.000 |
30.5243340000, 78.5856320000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.611 - 78.631
|
20.000 |
30.5222820000, 78.5872800000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.636 - 78.656
|
20.000 |
30.5222060000, 78.5874640000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.662 - 78.718
|
56.000 |
30.5220260000, 78.5877140000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.718 - 78.762
|
44.000 |
30.5221570000, 78.5882360000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.771 - 78.841
|
70.000 |
30.5222600000, 78.5887760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
78.920 - 78.939
|
19.000 |
30.5213130000, 78.5892690000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
79.000 - 79.148
|
148.000 |
30.5210930000, 78.5892420000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
79.144 - 79.182
|
38.000 |
30.5207020000, 78.5904880000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
79.182 - 79.350
|
168.000 |
30.5205290000, 78.5908610000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
79.358 - 79.430
|
72.000 |
30.5193130000, 78.5919670000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
79.430 - 79.518
|
88.000 |
30.5186570000, 78.5921300000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
79.532 - 79.592
|
60.000 |
30.5177700000, 78.5921600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
79.592 - 79.639
|
47.000 |
30.5178930000, 78.5926970000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.000 - 80.042
|
42.000 |
30.5143150000, 78.5947100000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.054 - 80.118
|
64.000 |
30.5139400000, 78.5950870000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.114 - 80.168
|
54.000 |
30.5137780000, 78.5956780000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.168 - 80.312
|
144.000 |
30.5134820000, 78.5960780000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.316 - 80.365
|
49.000 |
30.5129350000, 78.5973850000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.365 - 80.409
|
44.000 |
30.5128130000, 78.5978470000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.416 - 80.452
|
36.000 |
30.5123860000, 78.5979320000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.452 - 80.467
|
15.000 |
30.5123560000, 78.5979320000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.452 - 80.580
|
128.000 |
30.5121600000, 78.5981700000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.595 - 80.779
|
184.000 |
30.5115300000, 78.5990160000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.779 - 80.858
|
79.000 |
30.5100830000, 78.5998870000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
80.853 - 80.940
|
87.000 |
30.5095320000, 78.6003720000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.000 - 81.036
|
36.000 |
30.5090180000, 78.6010120000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.036 - 81.085
|
49.000 |
30.5087470000, 78.6011950000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.095 - 81.140
|
45.000 |
30.5085470000, 78.6017420000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.148 - 81.162
|
14.000 |
30.5082380000, 78.6020600000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.162 - 81.238
|
76.000 |
30.5081420000, 78.6019600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.238 - 81.247
|
9.000 |
30.5075470000, 78.6018270000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.269 - 81.289
|
20.000 |
30.5074780000, 78.6021250000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.289 - 81.341
|
52.000 |
30.5075250000, 78.6023580000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.344 - 81.467
|
123.000 |
30.5074320000, 78.6028870000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.467 - 81.523
|
56.000 |
30.5067700000, 78.6039150000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.524 - 81.533
|
9.000 |
30.5065250000, 78.6043830000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.533 - 81.593
|
60.000 |
30.5064720000, 78.6044820000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.590 - 81.736
|
146.000 |
30.5063650000, 78.6050350000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.754 - 81.786
|
32.000 |
30.5061870000, 78.6067470000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.794 - 81.805
|
11.000 |
30.5059190000, 78.6067930000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
81.858 - 81.946
|
88.000 |
30.5053290000, 78.6068650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.000 - 82.021
|
21.000 |
30.5051770000, 78.6076850000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.021 - 82.037
|
16.000 |
30.5052340000, 78.6079360000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.039 - 82.074
|
35.000 |
30.5052000000, 78.6080970000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.074 - 82.158
|
84.000 |
30.5049400000, 78.6083560000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.176 - 82.214
|
38.000 |
30.5040490000, 78.6084760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.196 - 82.248
|
52.000 |
30.5038710000, 78.6085240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.312 - 82.436
|
124.000 |
30.5032980000, 78.6088070000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.339 - 82.470
|
131.000 |
30.5042630000, 78.6081070000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.502 - 82.586
|
84.000 |
30.5046000000, 78.6077920000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.502 - 82.586
|
84.000 |
30.5042630000, 78.6081070000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.583 - 82.771
|
188.000 |
30.5039300000, 78.6081450000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
82.771 - 82.951
|
180.000 |
30.5025450000, 78.6092020000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.010 - 83.106
|
96.000 |
30.5011950000, 78.6103370000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.106 - 83.199
|
93.000 |
30.5004320000, 78.6107850000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.199 - 83.263
|
64.000 |
30.4997650000, 78.6113760000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.264 - 83.322
|
58.000 |
30.4993200000, 78.6117820000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.322 - 83.362
|
40.000 |
30.4988180000, 78.6119050000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.413 - 83.437
|
24.000 |
30.4980980000, 78.6121180000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.468 - 83.520
|
52.000 |
30.4977200000, 78.6124980000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.524 - 83.576
|
52.000 |
30.4970460000, 78.6132340000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.576 - 83.628
|
52.000 |
30.4970460000, 78.6132340000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.626 - 83.687
|
61.000 |
30.4966820000, 78.6134470000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.702 - 83.742
|
40.000 |
30.4961770000, 78.6137320000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.742 - 83.890
|
148.000 |
30.4959900000, 78.6140670000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
83.890 - 84.018
|
128.000 |
30.4948880000, 78.6149270000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.000 - 84.024
|
24.000 |
30.4941050000, 78.6159700000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.024 - 84.036
|
12.000 |
30.4939870000, 78.6160940000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.036 - 84.108
|
72.000 |
30.4938930000, 78.6161830000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.106 - 84.119
|
13.000 |
30.4934890000, 78.6167010000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.119 - 84.215
|
96.000 |
30.4934100000, 78.6168150000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.210 - 84.220
|
10.000 |
30.4930370000, 78.6176470000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.228 - 84.260
|
32.000 |
30.4929430000, 78.6177950000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.260 - 84.289
|
29.000 |
30.4927910000, 78.6181140000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.295 - 84.493
|
198.000 |
30.4925810000, 78.6183990000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.493 - 84.577
|
84.000 |
30.4917120000, 78.6202020000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.578 - 84.645
|
67.000 |
30.4915480000, 78.6209680000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.671 - 84.698
|
27.000 |
30.4910920000, 78.6217460000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.704 - 84.756
|
52.000 |
30.4910250000, 78.6220520000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.775 - 84.803
|
28.000 |
30.4908730000, 78.6227570000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.800 - 84.830
|
30.000 |
30.4910990000, 78.6227720000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.839 - 84.879
|
40.000 |
30.4914240000, 78.6226570000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.878 - 84.948
|
70.000 |
30.4917910000, 78.6227860000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.878 - 84.948
|
70.000 |
30.4917910000, 78.6227860000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
84.878 - 84.890
|
12.000 |
30.4923770000, 78.6232250000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
85.000 - 85.024
|
24.000 |
30.4924440000, 78.6233080000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
85.024 - 85.064
|
40.000 |
30.4925520000, 78.6235290000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
85.053 - 85.101
|
48.000 |
30.4926840000, 78.6238100000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
85.100 - 85.345
|
245.000 |
30.4929910000, 78.6241010000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
85.345 - 85.393
|
48.000 |
30.4940330000, 78.6262470000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
85.418 - 85.535
|
117.000 |
30.4942160000, 78.6269600000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
85.535 - 85.915
|
380.000 |
30.4942630000, 78.6281670000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
85.817 - 85.955
|
138.000 |
30.4960230000, 78.6290820000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.000 - 86.064
|
64.000 |
30.4970540000, 78.6282980000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.110 - 86.182
|
72.000 |
30.4980654000, 78.6274570000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.111 - 86.140
|
29.000 |
30.4978650000, 78.6276570000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.211 - 86.271
|
60.000 |
30.4983050000, 78.6267950000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.270 - 86.350
|
80.000 |
30.4986620000, 78.6263530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.354 - 86.550
|
196.000 |
30.4992580000, 78.6259120000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.550 - 86.655
|
105.000 |
30.5006370000, 78.6264720000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.718 - 86.756
|
38.000 |
30.5005990000, 78.6278570000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.773 - 86.833
|
60.000 |
30.5001380000, 78.6277080000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
86.833 - 86.969
|
136.000 |
30.4995970000, 78.6275150000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
87.050 - 87.300
|
250.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
87.300 - 87.350
|
50.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
Constructed under safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
87.350 - 87.550
|
200.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
constructed under safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
87.575 - 87.650
|
75.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
constructed under safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
87.750 - 87.875
|
125.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
87.875 - 88.000
|
125.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.000 - 88.075
|
75.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.075 - 88.107
|
32.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.125 - 88.150
|
25.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.150 - 88.225
|
75.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.150 - 88.225
|
75.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.375 - 88.425
|
50.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.450 - 88.500
|
50.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.500 - 88.600
|
100.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.600 - 88.750
|
150.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
88.750 - 89.000
|
250.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
89.000 - 89.075
|
75.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
89.075 - 89.150
|
75.000 |
30.4988970000, 78.6282760000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
89.150 - 89.350
|
200.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
91.150 - 91.250
|
100.000 |
30.4988970000, 78.6282760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
92.225 - 92.250
|
25.000 |
30.4597430000, 78.6360490000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
92.250 - 92.675
|
425.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
92.675 - 92.750
|
75.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
92.850 - 92.950
|
100.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
92.950 - 93.000
|
50.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.000 - 93.050
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.050 - 93.075
|
25.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.075 - 93.175
|
100.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.200 - 93.250
|
50.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.250 - 93.550
|
300.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.550 - 93.625
|
75.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.625 - 93.675
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.675 - 93.725
|
50.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.750 - 93.800
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
93.850 - 94.050
|
200.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.000 - 94.025
|
25.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.225 - 94.325
|
100.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.325 - 94.400
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.425 - 94.500
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.500 - 94.550
|
50.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.550 - 94.650
|
100.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.650 - 94.700
|
50.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.700 - 94.725
|
25.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.725 - 94.800
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
94.875 - 95.000
|
125.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
95.000 - 95.550
|
550.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
95.625 - 95.850
|
225.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
95.875 - 95.925
|
50.000 |
30.4597640000, 78.6359650000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
95.950 - 95.980
|
30.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
95.975 - 96.000
|
25.000 |
30.4597640000, 78.6359650000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.000 - 96.075
|
75.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.075 - 96.150
|
75.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.150 - 96.225
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.225 - 96.275
|
50.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.275 - 96.475
|
200.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.475 - 96.500
|
25.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.500 - 96.550
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.550 - 96.625
|
75.000 |
30.4597640000, 78.6359650000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.625 - 96.700
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.700 - 96.725
|
25.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.800 - 96.850
|
50.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.850 - 96.950
|
100.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
96.950 - 97.000
|
50.000 |
30.4597640000, 78.6359650000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
97.100 - 97.175
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
97.225 - 97.325
|
100.000 |
28.7535000000, 78.7060000000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
97.475 - 97.550
|
75.000 |
30.4284540000, 78.6492710000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
97.625 - 97.675
|
50.000 |
30.4274330000, 78.6474920000 |
Estimation Done |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
97.675 - 97.800
|
125.000 |
30.4294910000, 78.6497660000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
100.617 - 100.637
|
20.000 |
30.4223000000, 78.6693240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
100.644 - 100.648
|
4.300 |
30.4223590000, 78.6691270000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
100.665 - 100.673
|
8.000 |
30.4220880000, 78.6695600000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
100.677 - 100.691
|
14.000 |
30.4233470000, 78.6702690000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
100.703 - 100.727
|
24.000 |
30.4235470000, 78.6755600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
101.000 - 101.100
|
100.000 |
30.4232280000, 78.6702690000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
101.100 - 101.128
|
28.000 |
30.4231280000, 78.6706960000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
101.128 - 101.157
|
28.600 |
30.4201060000, 78.6716070000 |
Treatment in Progress |
5 |
|
|
|
1st and 7th damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
101.181 - 101.193
|
12.000 |
30.4201060000, 78.6716070000 |
Treatment in Progress |
5 |
|
|
|
3rd unhooked |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
101.231 - 101.391
|
160.000 |
30.4201060000, 78.6716070000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
101.400 - 101.445
|
44.600 |
30.4162220000, 78.6766800000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
101.455 - 101.511
|
56.000 |
30.4162280000, 78.6766880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
101.660 - 101.684
|
24.000 |
30.4162780000, 78.6766910000 |
Treatment in Progress |
2 |
|
|
|
6th damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.010 - 102.054
|
44.000 |
30.4162240000, 78.6766770000 |
Treatment in Progress |
4 |
|
|
|
10th and 11th are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.403 - 102.455
|
52.000 |
30.4142920000, 78.6815550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.481 - 102.541
|
60.000 |
30.4138660000, 78.6820440000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.691 - 102.719
|
28.000 |
30.4128950000, 78.6837970000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.719 - 102.728
|
9.000 |
30.4128950000, 78.6837970000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.727 - 102.751
|
24.000 |
30.4128390000, 78.6841140000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.751 - 102.772
|
21.000 |
30.4129440000, 78.6843600000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.751 - 102.772
|
21.000 |
30.4129440000, 78.6843600000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.784 - 102.836
|
52.000 |
30.4129340000, 78.6843910000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.836 - 102.873
|
37.000 |
30.4123480000, 78.6854910000 |
Identified |
6 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.871 - 102.891
|
20.000 |
30.4123480000, 78.6854910000 |
Treatment in Progress |
2 |
|
|
|
5th damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.901 - 102.961
|
60.000 |
30.4128980000, 78.6858360000 |
Treatment in Progress |
5 |
|
|
|
1st is damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
102.995 - 103.003
|
8.000 |
30.4126700000, 78.6868450000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
103.070 - 103.090
|
20.000 |
30.4116130000, 78.6869360000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
103.111 - 103.123
|
12.000 |
30.4116130000, 78.6869360000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
103.203 - 103.219
|
16.000 |
30.4116110000, 78.6869360000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
103.454 - 103.490
|
36.000 |
30.4106820000, 78.6920690000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
104.700 - 104.744
|
44.000 |
30.4073500000, 78.7003310000 |
Treatment in Progress |
5 |
|
|
|
panel 11,10 and 9 are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
104.743 - 104.786
|
43.000 |
30.4072820000, 78.7013220000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
104.862 - 104.890
|
28.000 |
30.4073110000, 78.7019220000 |
Treatment in Progress |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.030 - 105.054
|
24.000 |
30.4278400000, 78.6468240000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.225 - 105.253
|
28.000 |
30.4278400000, 78.6468240000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.266 - 105.300
|
34.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.325 - 105.397
|
72.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.400 - 105.464
|
64.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.500 - 105.516
|
16.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.516 - 105.524
|
8.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.525 - 105.540
|
15.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.540 - 105.550
|
10.000 |
28.7535000000, 78.7060000000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.575 - 105.647
|
72.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.650 - 105.660
|
10.000 |
30.4278400000, 78.6468240000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.670 - 105.720
|
50.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.725 - 105.825
|
100.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
1 no of panel is damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.875 - 105.900
|
25.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.900 - 105.950
|
50.000 |
29.1752000000, 78.5041000000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
105.950 - 106.000
|
50.000 |
29.1752000000, 78.5041000000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.000 - 106.050
|
50.000 |
29.1752000000, 78.5041000000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.050 - 106.070
|
20.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
2 no. of Panels are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.070 - 106.082
|
12.000 |
30.4278400000, 78.6468250000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.150 - 106.200
|
50.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.200 - 106.232
|
32.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.250 - 106.275
|
25.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.375 - 106.425
|
50.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.425 - 106.549
|
124.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.550 - 106.600
|
50.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.575 - 106.650
|
75.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.725 - 106.800
|
75.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.800 - 106.850
|
50.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
106.850 - 106.925
|
75.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
107.020 - 107.048
|
28.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
107.450 - 107.500
|
50.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
107.625 - 107.700
|
75.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
107.700 - 107.775
|
75.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
107.775 - 107.875
|
100.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.000 - 108.075
|
75.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.075 - 108.119
|
44.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.125 - 108.175
|
50.000 |
30.3938230000, 78.7308980000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.250 - 108.300
|
50.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.300 - 108.325
|
25.000 |
30.4278400000, 78.6468240000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.325 - 108.353
|
28.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.400 - 108.475
|
75.000 |
30.4278400000, 78.6864240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.475 - 108.575
|
100.000 |
30.4278400000, 78.6468240000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.575 - 108.650
|
75.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.650 - 108.750
|
100.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.825 - 108.850
|
25.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.850 - 108.875
|
25.000 |
30.4278400000, 78.6468240000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.875 - 108.900
|
25.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.900 - 108.950
|
50.000 |
30.4278400000, 78.6468240000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
108.950 - 109.000
|
50.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.100 - 109.150
|
50.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.100 - 109.125
|
25.000 |
30.3927630000, 78.7351900000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.125 - 109.185
|
60.000 |
30.3966210000, 78.7283130000 |
Estimation Done |
5 |
|
|
|
1 panel damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.150 - 109.200
|
50.000 |
30.4278400000, 78.6468240000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.150 - 109.200
|
50.000 |
30.4278400000, 78.5041000000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.200 - 109.240
|
40.000 |
30.3966210000, 78.7283130000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.225 - 109.241
|
16.000 |
30.3926890000, 78.7325920000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.250 - 109.350
|
100.000 |
30.3937820000, 78.7309280000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.250 - 109.290
|
40.000 |
30.3923430000, 78.7331090000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.300 - 109.350
|
50.000 |
30.3923430000, 78.7331100000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.350 - 109.390
|
40.000 |
30.3923430000, 78.7331090000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.400 - 109.450
|
50.000 |
30.3925750000, 78.7342840000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.450 - 109.495
|
45.000 |
30.3926770000, 78.7343940000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.575 - 109.625
|
50.000 |
30.3933700000, 78.7348320000 |
Treatment in Progress |
5 |
|
|
|
5 no. of panels are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.625 - 109.725
|
100.000 |
30.4278400000, 78.6468240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.725 - 109.825
|
100.000 |
30.3927640000, 78.7351920000 |
Estimation Done |
5 |
|
|
|
4 no. of panels are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.800 - 109.850
|
50.000 |
30.3927630000, 78.7351920000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.875 - 109.887
|
12.000 |
30.3927630000, 78.7351910000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.900 - 109.925
|
25.000 |
30.3927630000, 78.7351900000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
109.950 - 110.000
|
50.000 |
30.3927630000, 78.7351910000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.100 - 110.175
|
75.000 |
30.3927610000, 78.7351630000 |
Treatment in Progress |
8 |
|
|
|
5 no. of panels are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.175 - 110.200
|
25.000 |
30.3906170000, 78.7379700000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.200 - 110.250
|
50.000 |
30.3906170000, 78.7379700000 |
Treatment in Progress |
8 |
|
|
|
some panels are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.250 - 110.300
|
50.000 |
30.3927762000, 78.7351700000 |
Treatment in Progress |
5 |
|
|
|
4 no. of panels are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.275 - 110.350
|
75.000 |
30.3906070000, 78.7368160000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.350 - 110.575
|
225.000 |
30.3914250000, 78.7355600000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.575 - 110.611
|
36.000 |
30.3911940000, 78.7353990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.625 - 110.675
|
50.000 |
30.3889520000, 78.7382330000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.700 - 110.760
|
60.000 |
30.3904020000, 78.7439530000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.750 - 110.775
|
25.000 |
30.3927610000, 78.7351630000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.825 - 110.900
|
75.000 |
30.3912500000, 78.7437830000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
110.925 - 111.000
|
75.000 |
30.3906280000, 78.7429580000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.100 - 111.145
|
45.000 |
30.3888920000, 78.7441170000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.100 - 111.250
|
150.000 |
30.3906230000, 78.7429550000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.325 - 111.340
|
15.000 |
30.3895870000, 78.7437600000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.350 - 111.425
|
75.000 |
30.3895850000, 78.7437580000 |
Treatment in Progress |
7 |
|
|
|
3 no. of panels are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.450 - 111.510
|
60.000 |
30.3896320000, 78.7446950000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.550 - 111.600
|
50.000 |
30.3891970000, 78.7462070000 |
Treatment in Progress |
5 |
|
|
|
2 no. of panels are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.600 - 111.608
|
8.000 |
30.3891970000, 78.7462070000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.675 - 111.775
|
100.000 |
30.3903160000, 78.7478770000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.775 - 111.815
|
40.000 |
30.3903160000, 78.7478770000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.825 - 111.850
|
25.000 |
30.3906770000, 78.7479880000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
111.900 - 111.950
|
50.000 |
30.3911380000, 78.7495020000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.000 - 112.012
|
12.000 |
30.3902300000, 78.7476380000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.025 - 112.073
|
48.000 |
30.3907370000, 78.7482780000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.400 - 112.592
|
192.000 |
30.3895470000, 78.7491500000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.525 - 112.557
|
32.000 |
30.3889610000, 78.7501070000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.600 - 112.672
|
72.000 |
30.3880310000, 78.7513850000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.690 - 112.714
|
24.000 |
30.3878990000, 78.7521370000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.725 - 112.741
|
16.000 |
30.3881800000, 78.7508250000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.800 - 112.816
|
16.000 |
30.3874270000, 78.5322590000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.825 - 112.846
|
21.000 |
30.3815006000, 78.7917130000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.875 - 112.915
|
40.000 |
30.3874270000, 78.5322590000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
112.900 - 112.916
|
16.000 |
30.3876130000, 78.7533650000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.050 - 113.098
|
48.000 |
30.3876080000, 78.7534300000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.075 - 113.135
|
60.000 |
30.3871220000, 78.7538530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.150 - 113.166
|
16.000 |
30.4198160000, 78.6886220000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.200 - 113.228
|
28.000 |
30.3862070000, 78.7556190000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.225 - 113.237
|
12.000 |
30.3866360000, 78.7552270000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.250 - 113.278
|
28.000 |
30.3861420000, 78.7568890000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.275 - 113.303
|
28.000 |
30.3859800000, 78.7565570000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.305 - 113.321
|
16.000 |
30.3861060000, 78.7571240000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.325 - 113.349
|
24.000 |
30.3852670000, 78.7575900000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.400 - 113.416
|
16.000 |
30.3852810000, 78.7582420000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.450 - 113.534
|
84.000 |
30.3856860000, 78.5844060000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.550 - 113.598
|
48.000 |
30.3855690000, 78.7592550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.600 - 113.668
|
68.000 |
30.3855020000, 78.7596740000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.775 - 113.811
|
36.000 |
30.3856610000, 78.7614230000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
113.850 - 113.870
|
20.000 |
30.3856610000, 78.7614230000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.050 - 114.082
|
32.000 |
30.3852040000, 78.7613410000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.150 - 114.250
|
100.000 |
30.3851210000, 78.7615030000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.300 - 114.316
|
16.000 |
30.3852840000, 78.7499210000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.320 - 114.344
|
24.000 |
30.3798380000, 78.7601950000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.350 - 114.386
|
36.000 |
30.3827980000, 78.7646530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.450 - 114.470
|
20.000 |
30.3827320000, 78.7656600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.500 - 114.520
|
20.000 |
30.3828460000, 78.7660310000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.525 - 114.549
|
24.000 |
30.3824300000, 78.7673760000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.775 - 114.911
|
136.000 |
30.3818640000, 78.7677980000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
114.925 - 114.937
|
12.000 |
30.3816400000, 78.7691680000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
115.050 - 115.066
|
16.000 |
30.3806730000, 78.7695390000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
115.200 - 115.280
|
80.000 |
30.3799000000, 78.7708330000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
115.225 - 115.300
|
75.000 |
30.3797860000, 78.7712990000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
115.400 - 115.421
|
21.000 |
30.3807850000, 78.7695390000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
115.475 - 115.551
|
76.000 |
30.3804700000, 78.7734030000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
115.600 - 115.640
|
40.000 |
27.1766701000, 78.0080745000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
115.800 - 115.892
|
92.000 |
30.3829260000, 78.7752650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
115.925 - 115.941
|
16.000 |
30.3837460000, 78.7749380000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
116.000 - 116.024
|
24.000 |
30.3840540000, 78.7744680000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
116.100 - 116.124
|
24.000 |
30.3848020000, 78.7747960000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
116.225 - 116.341
|
116.000 |
30.3848020000, 78.7747960000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
116.300 - 116.316
|
16.000 |
30.3798780000, 78.7712990000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
116.325 - 116.450
|
125.000 |
30.3837270000, 78.7747550000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
116.600 - 116.675
|
75.000 |
30.3841010000, 78.7746760000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
116.680 - 116.692
|
12.000 |
30.3849780000, 78.7765079000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
116.700 - 116.850
|
150.000 |
30.3940549000, 78.7315010000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
116.900 - 116.924
|
24.000 |
30.3813200000, 78.7774330000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
117.100 - 117.180
|
80.000 |
30.3797620000, 78.7781530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
117.200 - 117.300
|
100.000 |
30.3824480000, 78.7785260000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
117.500 - 117.518
|
18.000 |
30.3806701000, 78.7775520000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
117.600 - 117.644
|
44.000 |
30.3782400000, 78.7826410000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
117.675 - 118.240
|
565.000 |
30.3785140000, 78.7831780000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
117.800 - 117.844
|
44.000 |
30.3785140000, 78.7831780000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
117.925 - 117.973
|
48.000 |
30.3796320000, 78.7802230000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
118.000 - 118.125
|
125.000 |
30.3798300000, 78.7812770000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
118.125 - 118.181
|
56.000 |
30.3809910000, 78.7859010000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
118.200 - 118.232
|
32.000 |
30.3815790000, 78.7865340000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
118.300 - 118.348
|
48.000 |
30.3822540000, 78.7963160000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
118.350 - 118.390
|
40.000 |
30.3825030000, 78.7870190000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
118.600 - 118.756
|
156.000 |
30.3838480000, 78.7886930000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
118.800 - 118.844
|
44.000 |
30.3838480000, 78.7886930000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.000 - 119.125
|
125.000 |
30.3822240000, 78.7870440000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.200 - 119.248
|
48.000 |
30.3813030000, 78.7918400000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.250 - 119.298
|
48.000 |
30.3832830000, 78.7894500000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.400 - 119.412
|
12.000 |
30.3811910000, 78.7905900000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.450 - 119.462
|
12.000 |
30.3834210000, 78.7926210000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.465 - 119.501
|
36.000 |
30.3812620000, 8.7901690000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.500 - 119.516
|
16.000 |
30.3805310000, 78.7906900000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.675 - 119.699
|
24.000 |
30.3850110000, 78.7937110000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.750 - 119.770
|
20.000 |
30.3847960000, 78.7945550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
119.900 - 119.912
|
12.000 |
30.3853510000, 78.7958300000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
120.200 - 120.224
|
24.000 |
30.3831850000, 78.7924870000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
120.625 - 120.700
|
75.000 |
30.3847060000, 78.7951260000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
120.700 - 120.784
|
84.000 |
30.3853510000, 78.7958300000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
120.800 - 120.836
|
36.000 |
30.3916250000, 78.7977420000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
120.925 - 120.961
|
36.000 |
30.3926790000, 78.7980500000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
120.975 - 121.007
|
32.000 |
30.3930980000, 78.7982990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
121.050 - 121.078
|
28.000 |
30.3878970000, 78.7959900000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
121.100 - 121.204
|
104.000 |
30.3889010000, 78.7950830000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
121.250 - 121.302
|
52.000 |
30.3929790000, 78.7995080000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
121.350 - 121.470
|
120.000 |
30.3923980000, 78.7993590000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
121.500 - 121.564
|
64.000 |
30.3909100000, 78.7996290000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
121.625 - 121.653
|
28.000 |
30.3913840000, 78.7970160000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
121.725 - 121.875
|
150.000 |
30.3919450000, 78.7979930000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
122.000 - 122.350
|
350.000 |
30.3939430000, 78.7994660000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
122.350 - 122.458
|
108.000 |
30.3910180000, 78.8020870000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
122.650 - 122.774
|
124.000 |
30.3919440000, 78.8063760000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
122.875 - 122.967
|
92.000 |
30.3916690000, 78.8072640000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
122.970 - 122.998
|
28.000 |
30.3905670000, 78.8007370000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.000 - 123.100
|
100.000 |
30.3911610000, 78.8007750000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.125 - 123.233
|
108.000 |
30.3908980000, 78.8090770000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.200 - 123.212
|
12.000 |
30.3915650000, 78.8032520000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.300 - 123.324
|
24.000 |
30.3916880000, 78.8098730000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.325 - 123.353
|
28.000 |
30.3918490000, 78.8032810000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.375 - 123.427
|
52.000 |
30.3916940000, 78.8105640000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.450 - 123.578
|
128.000 |
30.3916940000, 78.8105640000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.600 - 123.620
|
20.000 |
30.3920680000, 78.8123300000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.625 - 123.657
|
32.000 |
30.3914460000, 78.8066060000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.650 - 123.698
|
48.000 |
30.3919990000, 78.8128100000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.700 - 123.716
|
16.000 |
30.3922360000, 78.8065490000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.775 - 123.839
|
64.000 |
30.3927170000, 78.8137790000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.840 - 123.888
|
48.000 |
30.3917010000, 78.8072360000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
123.900 - 123.912
|
12.000 |
30.3933270000, 78.8146920000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.100 - 124.204
|
104.000 |
30.3928870000, 78.8159320000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.225 - 124.245
|
20.000 |
30.3923970000, 78.8170390000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.300 - 124.354
|
54.000 |
30.3919030000, 78.8104660000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.400 - 124.440
|
40.000 |
30.3921410000, 78.8187390000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.450 - 124.498
|
48.000 |
30.3916380000, 78.8125960000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.500 - 124.552
|
52.000 |
30.3917310000, 78.8193010000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.600 - 124.660
|
60.000 |
30.3908230000, 78.8189070000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.625 - 124.633
|
8.000 |
30.3918660000, 78.8121920000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.675 - 124.751
|
76.000 |
30.3903720000, 78.8187180000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.800 - 124.892
|
92.000 |
30.0389509000, 78.8180750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
124.900 - 124.920
|
20.000 |
30.3887110000, 78.8174710000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.050 - 125.118
|
68.000 |
30.3878510000, 78.8164940000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.175 - 125.219
|
44.000 |
30.3868580000, 78.8159950000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.300 - 125.400
|
100.000 |
30.3857180000, 78.8158360000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.400 - 125.464
|
64.000 |
30.3849350000, 78.8153700000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.475 - 125.567
|
92.000 |
30.3844140000, 78.8150100000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.570 - 125.612
|
42.000 |
30.3920330000, 78.8187840000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.700 - 125.768
|
68.000 |
30.3844140000, 78.8150100000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.770 - 125.794
|
24.000 |
30.3917400000, 78.8190180000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.825 - 125.881
|
56.000 |
30.3851030000, 78.8166430000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
125.890 - 125.902
|
12.000 |
30.3907970000, 78.8189760000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
126.000 - 126.150
|
150.000 |
30.3899480000, 78.8177430000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
126.275 - 126.323
|
48.000 |
30.3899480000, 78.8177430000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
126.400 - 126.464
|
64.000 |
30.3871280000, 78.8227060000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
126.500 - 126.620
|
120.000 |
30.3877160000, 78.8231750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
126.625 - 126.675
|
50.000 |
30.3849983000, 78.8154640000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
126.800 - 126.848
|
48.000 |
30.8933700000, 78.8253550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
126.850 - 126.862
|
12.000 |
30.3842650000, 78.8155230000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
127.200 - 127.404
|
204.000 |
30.3911140000, 78.8280540000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
127.325 - 127.341
|
16.000 |
30.3859040000, 78.8195280000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
127.400 - 127.480
|
80.000 |
30.3906230000, 78.8298700000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
127.500 - 127.556
|
56.000 |
30.3908070000, 78.8308050000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
127.575 - 127.647
|
72.000 |
30.3900860000, 78.8310520000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
127.700 - 127.728
|
28.000 |
30.3903410000, 78.8320400000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
127.750 - 127.798
|
48.000 |
30.3883840000, 78.8233040000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
127.900 - 127.924
|
24.000 |
30.3903330000, 78.8338840000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.000 - 128.042
|
42.000 |
30.3890080000, 78.8239230000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.050 - 128.125
|
75.000 |
30.3896932000, 78.8255920000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.200 - 128.252
|
52.000 |
30.3911910000, 78.8362770000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.300 - 128.368
|
68.000 |
30.3916260000, 78.8370710000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.370 - 128.454
|
84.000 |
30.3901060000, 78.8271370000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.550 - 128.574
|
24.000 |
30.3910220000, 78.8286850000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.725 - 128.745
|
20.000 |
30.3907120000, 78.8301570000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.800 - 128.820
|
20.000 |
30.3898510000, 78.8412980000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.850 - 128.862
|
12.000 |
30.3906210000, 78.8307700000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.850 - 128.874
|
24.000 |
30.3897120000, 78.8418070000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.875 - 128.899
|
24.000 |
30.3901020000, 78.8313140000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
128.925 - 128.969
|
44.000 |
30.3891320000, 78.8427750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
129.050 - 129.062
|
12.000 |
30.3904240000, 78.8322720000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
129.075 - 129.107
|
32.000 |
30.3905020000, 78.8326010000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
129.100 - 129.160
|
60.000 |
30.3898420000, 78.8426380000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
129.200 - 129.224
|
24.000 |
30.3904790000, 78.8430340000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Crash barrier |
129.225 - 129.241
|
16.000 |
30.3902630000, 78.8337640000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Scupper |
98.400
|
0.000 |
30.4306550000, 78.6544170000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Scupper |
104.262
|
0.000 |
30.4090870000, 78.6977890000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
67.306 - 67.348
|
42.000 |
30.5227150000, 78.5536670000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
67.376 - 67.420
|
44.000 |
30.5232550000, 78.5540780000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
67.481 - 67.511
|
30.000 |
30.5236170000, 78.5548030000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
67.596 - 67.706
|
110.000 |
30.5240170000, 78.5558150000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
67.698 - 67.890
|
192.000 |
30.5254820000, 78.5568070000 |
Identified |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
67.738 - 67.768
|
30.000 |
30.5250300000, 78.5566020000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.000 - 68.024
|
24.000 |
30.5251180000, 78.5583690000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.082 - 68.116
|
34.000 |
30.5254910000, 78.5590290000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.170 - 68.216
|
46.000 |
30.5256630000, 78.5598720000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.351 - 68.366
|
15.000 |
30.5263370000, 78.5614780000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.402 - 68.410
|
8.000 |
30.5266230000, 78.5618660000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.410 - 68.436
|
26.000 |
30.5266230000, 78.5618660000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.458 - 68.508
|
50.000 |
30.5269430000, 78.5618880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.508 - 68.558
|
50.000 |
30.5269430000, 78.5618880000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.598 - 68.628
|
30.000 |
30.5280570000, 78.5612440000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.628 - 68.652
|
24.000 |
30.5280570000, 78.5612440000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.699 - 68.779
|
80.000 |
30.5285360000, 78.5613840000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.779 - 68.827
|
48.000 |
30.5285350000, 78.5613840000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.866 - 68.906
|
40.000 |
30.5296080000, 78.5622960000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
68.906 - 68.974
|
68.000 |
30.5296080000, 78.5622960000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
69.132 - 69.157
|
25.000 |
30.5306200000, 78.5639500000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
69.132 - 69.185
|
53.000 |
30.5306200000, 78.5639500000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
69.378 - 69.419
|
41.000 |
30.5321060000, 78.5649250000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
69.721 - 69.724
|
3.000 |
30.5312420000, 78.5679630000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
69.988 - 69.991
|
3.000 |
30.5335530000, 78.5675880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
69.988 - 69.992
|
4.000 |
30.5334680000, 78.5675950000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
70.000 - 70.020
|
20.000 |
30.5335530000, 78.5675880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
70.020 - 70.032
|
12.000 |
30.5335530000, 78.5675880000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
71.357 - 71.375
|
18.000 |
30.5285730000, 78.5735920000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
71.375 - 71.399
|
24.000 |
30.5285730000, 78.5735920000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
71.554 - 71.568
|
14.000 |
30.5283780000, 78.5720180000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
71.948 - 71.968
|
20.000 |
30.5277540000, 78.5693910000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
71.968 - 71.990
|
22.000 |
30.5277540000, 78.5693910000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
72.182 - 72.197
|
15.000 |
30.5279680000, 78.5681360000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
72.197 - 72.233
|
36.000 |
30.5279680000, 78.5681360000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
72.678 - 72.688
|
10.000 |
30.5251100000, 78.5666470000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
72.701 - 72.711
|
10.000 |
30.5249130000, 78.5666270000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
73.110 - 73.145
|
35.000 |
30.5244660000, 78.5699370000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
73.145 - 73.207
|
62.000 |
30.5244660000, 78.5699370000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
73.244 - 73.254
|
10.000 |
30.5241720000, 78.5707950000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
73.254 - 73.315
|
61.000 |
30.5241720000, 78.5707950000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
73.481 - 73.491
|
10.000 |
30.5239530000, 78.5730700000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
73.491 - 73.501
|
10.000 |
30.5239530000, 78.5730700000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
73.883 - 73.928
|
45.000 |
30.5223920000, 78.5737890000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
73.928 - 73.974
|
46.000 |
30.5223920000, 78.5737890000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
76.420 - 76.427
|
7.000 |
30.5145610000, 78.5886730000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
76.602 - 76.612
|
10.000 |
30.5159710000, 78.5882970000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
76.756 - 76.825
|
69.000 |
30.5170570000, 78.5878100000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
76.985 - 76.995
|
10.000 |
30.5183300000, 78.5865170000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
77.000 - 77.410
|
410.000 |
30.5183300000, 78.5865170000 |
Treatment in Progress |
8 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
77.574 - 77.688
|
114.000 |
30.5204340000, 78.5853920000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
77.940 - 77.950
|
10.000 |
30.5230580000, 78.5845900000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
78.000 - 78.018
|
18.000 |
30.5231220000, 78.5845650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
79.666 - 79.694
|
28.000 |
30.5176580000, 78.5933770000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
82.295 - 82.312
|
17.000 |
30.5032230000, 78.6089740000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
82.952 - 82.957
|
5.000 |
30.5012830000, 78.6102120000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
83.000 - 83.010
|
10.000 |
30.5012830000, 78.6102120000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
84.756 - 84.775
|
19.000 |
30.4908720000, 78.6225900000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
86.354 - 86.434
|
80.000 |
30.4992580000, 78.6259120000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
86.434 - 86.550
|
116.000 |
30.4992580000, 78.6259120000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
86.655 - 86.668
|
13.000 |
30.5010830000, 78.6273770000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
88.500 - 88.512
|
12.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
constructed under safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
89.700 - 89.725
|
25.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
91.075 - 91.150
|
75.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
93.725 - 93.750
|
25.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
94.175 - 94.225
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
94.400 - 94.425
|
25.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
94.800 - 94.875
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
95.100 - 95.125
|
25.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
95.350 - 95.400
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
95.850 - 95.875
|
25.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
95.925 - 95.945
|
20.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
96.725 - 96.800
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
97.000 - 97.100
|
100.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
97.125 - 97.150
|
25.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
97.425 - 97.475
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
97.550 - 97.625
|
75.000 |
30.4274120000, 78.6474810000 |
Estimation Done |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
97.750 - 97.850
|
100.000 |
30.4302000000, 78.6512450000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
97.900 - 98.000
|
100.000 |
30.4309470000, 78.6515370000 |
Estimation Done |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
98.000 - 98.125
|
125.000 |
30.4316860000, 78.6520280000 |
Treatment in Progress |
0 |
|
|
|
1 & 2 parapets are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
98.225 - 98.250
|
25.000 |
30.4317680000, 78.6538240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
98.575 - 98.625
|
50.000 |
30.4317680000, 78.6538240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
99.325 - 99.400
|
75.000 |
30.4258810000, 78.6625030000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
100.617 - 100.624
|
7.000 |
30.4230130000, 78.6683620000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
100.639 - 100.645
|
5.500 |
30.4221080000, 78.6695260000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
101.890 - 101.925
|
35.000 |
30.4162310000, 78.6766850000 |
Estimation Done |
1 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
102.388 - 102.403
|
15.000 |
30.4198170000, 78.6886220000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
102.455 - 102.481
|
26.400 |
30.4140290000, 78.6820590000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
102.541 - 102.691
|
150.000 |
30.4133710000, 78.6824820000 |
Treatment in Progress |
5 |
|
|
|
partially damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
102.772 - 102.784
|
12.000 |
30.4129910000, 78.6843990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
102.891 - 102.901
|
10.000 |
30.4123480000, 78.6854910000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
102.986 - 102.993
|
7.000 |
30.4116140000, 78.6870500000 |
Treatment in Progress |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
103.010 - 103.070
|
60.000 |
30.4116130000, 78.6869360000 |
Treatment in Progress |
6 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
103.090 - 103.111
|
20.800 |
30.4119110000, 78.6874190000 |
Treatment in Progress |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
103.250 - 103.300
|
50.000 |
30.4116130000, 78.6869360000 |
Treatment in Progress |
8 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
103.573 - 103.693
|
120.000 |
30.4105990000, 78.6919600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
103.726 - 103.746
|
20.000 |
30.4112110000, 78.6918120000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.030 - 104.150
|
120.000 |
30.4090500000, 78.6952210000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.217 - 104.259
|
42.000 |
30.4088710000, 78.6966930000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.258 - 104.261
|
3.000 |
30.4088910000, 78.6978710000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.320 - 104.350
|
30.000 |
30.4087190000, 78.6977690000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.398 - 104.458
|
60.000 |
30.4082560000, 78.6977550000 |
Estimation Done |
1 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.656 - 104.690
|
34.000 |
30.4077760000, 78.6998840000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.788 - 104.862
|
74.000 |
30.4072830000, 78.7013220000 |
Treatment in Progress |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.890 - 104.910
|
20.000 |
30.4070660000, 78.7022970000 |
Treatment in Progress |
10 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.953 - 104.965
|
12.000 |
30.4064530000, 78.7027480000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
104.982 - 104.992
|
10.000 |
30.4061140000, 78.7027870000 |
Treatment in Progress |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
105.000 - 105.030
|
30.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
105.050 - 105.095
|
45.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
105.100 - 105.200
|
100.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
105.200 - 105.225
|
25.000 |
28.7535000000, 78.7060000000 |
Estimation Done |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
105.475 - 105.500
|
25.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
105.825 - 105.875
|
50.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
106.100 - 106.150
|
50.000 |
30.4278400000, 78.6468240000 |
Treatment in Progress |
10 |
|
|
|
10 no. of Parapet are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
106.200 - 106.215
|
15.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
107.550 - 107.625
|
75.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
109.500 - 109.528
|
28.000 |
30.3926410000, 78.7341800000 |
Treatment in Progress |
8 |
|
|
|
partially parapets are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
109.650 - 109.725
|
75.000 |
30.3927640000, 78.7351930000 |
Treatment in Progress |
7 |
|
|
|
same parapets are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
110.100 - 110.250
|
150.000 |
30.3906230000, 78.7429550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
110.800 - 110.815
|
15.000 |
30.3912500000, 78.7437830000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
110.900 - 110.910
|
10.000 |
30.3906230000, 78.7429550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
111.850 - 111.890
|
40.000 |
30.3908790000, 78.7482530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
111.950 - 111.990
|
40.000 |
30.3911380000, 78.7495020000 |
Treatment in Progress |
5 |
|
|
|
5 no. of parapets are damaged |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
112.025 - 112.121
|
96.000 |
30.3907370000, 78.7482780000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
112.300 - 112.339
|
39.000 |
30.3909070000, 78.7481930000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
112.800 - 112.824
|
24.000 |
30.3874270000, 78.5322590000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
113.300 - 113.336
|
36.000 |
30.3854430000, 78.7573890000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
113.375 - 113.405
|
30.000 |
30.3851560000, 78.7580730000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
113.775 - 113.835
|
60.000 |
30.3856610000, 78.7614230000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
113.850 - 113.874
|
24.000 |
30.3849850000, 78.7613250000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
114.075 - 114.141
|
66.000 |
30.3836250000, 78.7619350000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
114.150 - 114.261
|
111.000 |
30.3833280000, 78.7627330000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
114.225 - 114.270
|
45.000 |
30.3831520000, 78.7634010000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
114.350 - 114.413
|
63.000 |
30.3827980000, 78.7646530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
114.450 - 114.477
|
27.000 |
30.3827320000, 78.7656600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
114.500 - 114.542
|
42.000 |
30.3828460000, 78.7660310000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
114.775 - 114.778
|
3.000 |
30.3818640000, 78.7677980000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
114.925 - 114.955
|
30.000 |
30.3816400000, 78.7691680000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
115.025 - 115.040
|
15.000 |
30.3807330000, 78.7694120000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
115.225 - 115.261
|
36.000 |
30.3789884000, 78.7710480000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
115.400 - 115.454
|
54.000 |
30.3803500000, 78.7727570000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
115.600 - 115.621
|
21.000 |
30.3814470000, 78.7740410000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
115.925 - 115.934
|
9.000 |
30.3837460000, 78.7749380000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
116.000 - 116.009
|
9.000 |
30.3840540000, 78.7744680000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
116.100 - 116.136
|
36.000 |
30.3848020000, 78.7747960000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
116.225 - 116.231
|
6.000 |
30.3855840000, 78.7757510000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
116.300 - 116.312
|
12.000 |
30.3855930000, 78.7764580000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
116.450 - 116.468
|
18.000 |
30.3844040000, 78.7769210000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
116.600 - 116.603
|
3.000 |
27.1766701000, 78.7781200000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
116.675 - 116.681
|
6.000 |
30.3830280000, 78.7787140000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
116.900 - 116.912
|
12.000 |
30.3813200000, 78.7774330000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
117.100 - 117.112
|
12.000 |
30.3797620000, 78.7781530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
117.400 - 117.430
|
30.000 |
30.3790720000, 78.7808740000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
118.350 - 118.377
|
27.000 |
30.3825030000, 78.7870190000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
119.200 - 119.202
|
2.000 |
30.3804860000, 78.7910530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
119.250 - 119.265
|
15.000 |
30.3816480000, 78.7921930000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
119.450 - 119.456
|
6.000 |
30.3834210000, 78.7926210000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
119.750 - 119.762
|
12.000 |
30.3847960000, 78.7945550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
120.700 - 120.712
|
12.000 |
30.3911330000, 78.7970650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
120.975 - 120.976
|
1.000 |
30.3930980000, 78.7982990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
121.350 - 121.352
|
2.000 |
30.3923980000, 78.7993590000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
126.200 - 126.210
|
10.000 |
30.3861280000, 78.8213600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
126.275 - 126.285
|
10.000 |
30.3866130000, 78.8217430000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
126.400 - 126.424
|
24.000 |
30.3871280000, 78.8227060000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
126.500 - 126.516
|
16.000 |
30.3877160000, 78.8231750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
126.875 - 126.885
|
10.000 |
30.3894050000, 78.8260910000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
127.075 - 127.141
|
66.000 |
30.3899850000, 78.8279090000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
127.575 - 127.597
|
22.000 |
30.3900860000, 78.8310520000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
127.700 - 127.728
|
28.000 |
30.3903410000, 78.8320400000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
128.500 - 128.510
|
10.000 |
30.3898510000, 78.8412980000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
128.525 - 128.555
|
30.000 |
30.3911390000, 78.8387410000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
128.600 - 128.612
|
12.000 |
30.3907610000, 78.8395990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
128.675 - 128.711
|
36.000 |
30.3903570000, 78.8403230000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
128.850 - 128.878
|
28.000 |
30.3897120000, 78.8418070000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
129.100 - 129.106
|
6.000 |
30.3898420000, 78.8426380000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Parapet |
129.200 - 129.232
|
32.000 |
30.3904790000, 78.8430340000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
87.050 - 87.300
|
250.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
10 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
87.875 - 88.000
|
125.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
88.000 - 88.025
|
25.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
88.150 - 88.225
|
75.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
10 |
|
|
|
constructed under road safety work |
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
88.600 - 88.750
|
150.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
89.150 - 89.350
|
200.000 |
30.4988970000, 78.6282760000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
92.225 - 92.250
|
25.000 |
30.4597430000, 78.6360490000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
92.675 - 92.750
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
93.550 - 93.625
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
94.000 - 94.025
|
25.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
94.700 - 94.725
|
25.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
5 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
95.000 - 95.550
|
550.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
96.075 - 96.150
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
96.225 - 96.275
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
96.475 - 96.500
|
25.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
96.550 - 96.625
|
75.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
96.700 - 96.725
|
25.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
96.800 - 96.850
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
96.950 - 97.000
|
50.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
97.000 - 97.100
|
100.000 |
30.4597640000, 78.6359650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
105.125 - 105.150
|
25.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
105.550 - 105.575
|
25.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
105.900 - 106.000
|
100.000 |
29.1752000000, 78.5041000000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
106.150 - 106.200
|
50.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
106.275 - 106.325
|
50.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
106.375 - 106.425
|
50.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
106.850 - 106.925
|
75.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
109.000 - 109.075
|
75.000 |
30.4278400000, 78.6468240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
109.150 - 109.200
|
50.000 |
30.4278400000, 78.6468240000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
109.250 - 109.350
|
100.000 |
30.3937820000, 78.7309280000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
110.175 - 110.200
|
25.000 |
30.3906170000, 78.7379700000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
110.250 - 110.275
|
25.000 |
30.3906150000, 78.7379500000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
111.600 - 111.608
|
8.000 |
30.3891970000, 78.7462070000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
111.825 - 111.850
|
25.000 |
30.3906770000, 78.7479880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
112.025 - 112.031
|
6.000 |
30.3907370000, 78.7482780000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
112.300 - 112.309
|
9.000 |
30.3909070000, 78.7481930000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
112.400 - 112.445
|
45.000 |
30.3895470000, 78.7491500000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
112.600 - 112.624
|
24.000 |
30.3880310000, 78.7513850000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
112.690 - 112.756
|
66.000 |
30.3878990000, 78.7521370000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
112.800 - 112.818
|
18.000 |
30.3874270000, 78.5322590000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
112.875 - 112.893
|
18.000 |
30.3871220000, 78.7538530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
113.075 - 113.081
|
6.000 |
30.3862070000, 78.7556190000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
113.200 - 113.203
|
3.000 |
30.3861420000, 78.7568890000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
113.300 - 113.345
|
45.000 |
30.3854430000, 78.7573890000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
113.450 - 113.459
|
9.000 |
30.3856860000, 78.5844060000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
113.550 - 113.556
|
6.000 |
30.3855690000, 78.7592550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
113.775 - 113.787
|
12.000 |
30.3856610000, 78.7614230000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
114.075 - 114.084
|
9.000 |
30.3836250000, 78.7619350000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
114.150 - 114.153
|
3.000 |
30.3833280000, 78.7627330000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
115.400 - 115.412
|
12.000 |
30.3803500000, 78.7727570000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
115.600 - 115.609
|
9.000 |
30.3814470000, 78.7740410000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
115.800 - 115.806
|
6.000 |
30.3829260000, 78.7752650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
116.300 - 116.306
|
6.000 |
30.3855930000, 78.7764580000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
116.450 - 116.486
|
36.000 |
30.3844040000, 78.7769210000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
116.600 - 116.627
|
27.000 |
30.3835660000, 78.7781200000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
119.075 - 119.087
|
12.000 |
30.3804860000, 78.7910530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
123.300 - 123.315
|
15.000 |
30.3916880000, 78.8098730000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
123.375 - 123.396
|
21.000 |
30.3916940000, 78.8105640000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
123.900 - 123.921
|
21.000 |
30.3933270000, 78.8146920000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
124.100 - 124.106
|
6.000 |
30.3928870000, 78.8159320000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
124.300 - 124.312
|
12.000 |
30.3920650000, 78.8175880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
124.400 - 124.406
|
6.000 |
30.3921410000, 78.8187390000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
124.675 - 124.690
|
15.000 |
30.3903720000, 78.8187180000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
124.800 - 124.830
|
30.000 |
30.0389509000, 78.8180750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
125.700 - 125.706
|
6.000 |
30.3851030000, 78.8166430000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
125.825 - 125.831
|
6.000 |
30.3856610000, 78.8178840000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
126.125 - 126.173
|
48.000 |
30.3860870000, 78.8204510000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
128.125 - 128.173
|
48.000 |
30.3906250000, 78.8360350000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
128.525 - 128.552
|
27.000 |
30.3911390000, 78.8387410000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
128.600 - 128.624
|
24.000 |
30.3907610000, 78.8395990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Delimetor |
128.675 - 128.735
|
60.000 |
30.3903570000, 78.8403230000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[98]
Uttarkashi Ghansali Tilwara state highway
|
Slide Zone |
87.300 - 87.550
|
250.000 |
30.5006690000, 78.6264500000 |
Identified |
3 |
|
|
|
45W290 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
1.100 - 1.112
|
12.000 |
30.5818390000, 78.6578760000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
1.400 - 1.409
|
9.000 |
30.5823300000, 78.6605480000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
1.700 - 1.707
|
7.000 |
30.5834830000, 78.6628270000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
2.600 - 2.609
|
9.000 |
30.5882700000, 78.6694600000 |
Treatment in Progress |
7 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
5.475 - 5.483
|
8.000 |
30.5926060000, 78.6806530000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
6.738 - 6.762
|
24.000 |
30.5996430000, 78.6752750000 |
Estimation Done |
1 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
9.195 - 9.210
|
14.950 |
30.6017580000, 78.6716240000 |
Estimation Done |
1 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
9.740 - 9.754
|
13.600 |
30.6014570000, 78.6710310000 |
Estimation Done |
1 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
11.930 - 11.941
|
10.500 |
30.5943400000, 78.6585750000 |
Estimation Done |
1 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
12.975 - 12.978
|
3.000 |
30.6001620000, 78.6551990000 |
Estimation Done |
1 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Cause way |
13.150 - 13.157
|
7.000 |
30.6004420000, 78.6549210000 |
Estimation Done |
1 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
0.425
|
-- |
30.5811800000, 78.6521100000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
0.600
|
-- |
30.5817200000, 78.6536300000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
0.775
|
-- |
30.5813700000, 78.6551400000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
1.050
|
-- |
30.5813630000, 78.6571600000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
1.200
|
-- |
30.5818350000, 78.6584130000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
1.620
|
-- |
30.5829900000, 78.6624500000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
1.800
|
-- |
30.5842290000, 78.6638110000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
2.020
|
-- |
30.5851800000, 78.6654470000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
2.125
|
-- |
30.5858630000, 78.6663260000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
2.250
|
-- |
30.5863510000, 78.6671150000 |
Treatment in Progress |
10 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
3.050
|
-- |
30.5896500000, 78.6736500000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
3.100
|
-- |
30.5898530000, 78.6742200000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
3.150
|
-- |
30.5906700000, 78.6759300000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
3.575
|
-- |
30.5910700000, 78.6768400000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
3.800
|
-- |
30.5903100000, 78.6788220000 |
Sanctioned |
9 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
4.015
|
-- |
30.5908090000, 78.6805210000 |
Sanctioned |
5 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
4.150
|
-- |
30.5909600000, 78.6819400000 |
Treatment in Progress |
10 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
4.460
|
-- |
30.5923010000, 78.6839940000 |
Identified |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
4.550
|
-- |
30.5934000000, 78.6837200000 |
Sanctioned |
8 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
4.800
|
-- |
30.5951720000, 78.6830520000 |
Sanctioned |
8 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
4.985
|
-- |
30.5951370000, 78.6828910000 |
Sanctioned |
7 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
5.340
|
-- |
30.5927980000, 78.6817900000 |
Sanctioned |
4 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
5.600
|
-- |
30.5925530000, 78.6792790000 |
Estimation Done |
4 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
5.750
|
-- |
30.5929600000, 78.6780500000 |
Sanctioned |
5 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
5.990
|
-- |
30.5946500000, 78.6787600000 |
Estimation Done |
3 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
6.350
|
-- |
30.5975020000, 78.6785110000 |
Estimation Done |
2 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
6.575
|
-- |
30.5985790000, 78.6769210000 |
Sanctioned |
5 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
6.910
|
-- |
30.5986100000, 78.6753900000 |
Sanctioned |
7 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
7.115
|
-- |
30.5970580000, 78.6754760000 |
Sanctioned |
5 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
7.490
|
-- |
30.5956000000, 78.6736700000 |
Identified |
2 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
7.615
|
-- |
30.5958270000, 78.6724980000 |
Sanctioned |
8 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
7.720
|
-- |
30.5949790000, 78.6721050000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
8.295
|
-- |
30.5959300000, 78.6714900000 |
Sanctioned |
8 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
8.700
|
-- |
30.5978800000, 78.6733300000 |
Treatment in Progress |
10 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
8.900
|
-- |
30.5992900000, 78.6732600000 |
Identified |
7 |
|
|
|
|
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
9.075
|
-- |
30.6009890000, 78.6724490000 |
Estimation Done |
0 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
9.450
|
-- |
30.6032900000, 78.6713700000 |
Estimation Done |
0 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
9.600
|
-- |
30.6032300000, 78.6713100000 |
Treatment in Progress |
3 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
10.075
|
-- |
30.6003700000, 78.6715750000 |
Estimation Done |
1 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
10.225
|
-- |
30.5983340000, 78.6716490000 |
Identified |
10 |
|
|
|
|
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
10.410
|
-- |
30.5976900000, 78.6704400000 |
Sanctioned |
8 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
10.515
|
-- |
30.5971900000, 78.6695900000 |
Sanctioned |
8 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
10.645
|
-- |
30.5966440000, 78.6685270000 |
Sanctioned |
7 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
10.820
|
-- |
30.5957300000, 78.6671400000 |
Sanctioned |
7 |
|
|
|
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
11.140
|
-- |
30.5960590000, 78.6646740000 |
Sanctioned |
8 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
11.420
|
-- |
30.5949710000, 78.6621300000 |
Estimation Done |
0 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
11.600
|
-- |
30.5946300000, 78.6605070000 |
Sanctioned |
8 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
11.750
|
-- |
30.5938320000, 78.6595790000 |
Estimation Done |
0 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
12.050
|
-- |
30.5954800000, 78.6581700000 |
Treatment in Progress |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
12.150
|
-- |
30.5962300000, 78.6579400000 |
Sanctioned |
8 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
12.425
|
-- |
30.5965500000, 78.6556800000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
12.725
|
-- |
30.5981830000, 78.6547410000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
12.870
|
-- |
30.5991590000, 78.6557190000 |
Estimation Done |
0 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Scupper |
13.220
|
-- |
30.6020000000, 78.6538300000 |
Sanctioned |
10 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Parapet |
10.475 - 10.578
|
103.000 |
30.5976290000, 78.6705000000 |
Estimation Done |
0 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Parapet |
10.990 - 11.070
|
80.000 |
30.5955300000, 78.6658200000 |
Estimation Done |
0 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Parapet |
12.450 - 12.492
|
42.000 |
30.5966700000, 78.6552200000 |
Estimation Done |
0 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Puccadrain |
5.920 - 5.945
|
25.000 |
30.5941600000, 78.6782300000 |
Estimation Done |
3 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Puccadrain |
10.425 - 10.535
|
110.000 |
30.5976440000, 78.6705050000 |
Estimation Done |
3 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Puccadrain |
11.750 - 11.968
|
218.000 |
30.5938490000, 78.6595910000 |
Estimation Done |
3 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Puccadrain |
12.100 - 12.197
|
97.000 |
30.5956300000, 78.6580700000 |
Estimation Done |
3 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Puccadrain |
12.650 - 12.680
|
30.000 |
30.5980600000, 78.6544600000 |
Estimation Done |
3 |
|
|
0 |
45W111 |
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Slide Zone |
6.150 - 6.350
|
200.000 |
30.5974070000, 78.6785890000 |
Identified |
5 |
|
|
|
|
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Slide Zone |
7.675 - 7.770
|
95.000 |
30.5947520000, 78.6722300000 |
Identified |
8 |
|
|
|
|
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Slide Zone |
8.125 - 8.275
|
150.000 |
30.5947520000, 78.6718270000 |
Identified |
8 |
|
|
|
|
Jan 2024 |
[4082]
Thati Kot Ghandiyalsaur motor road
|
Slide Zone |
11.550 - 11.600
|
50.000 |
30.5945520000, 78.6602310000 |
Identified |
6 |
|
|
|
|
Jan 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
19.000 - 19.200
|
200.000 |
30.6182000000, 78.5832150000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
19.200 - 19.248
|
48.000 |
30.6177777800, 78.5861111100 |
Estimation Done |
48 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
19.248 - 19.400
|
152.000 |
30.6177778000, 78.5861111100 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
19.400 - 19.600
|
200.000 |
30.6175650000, 78.5875620000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
19.600 - 19.800
|
200.000 |
30.6152000000, 78.5854000000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
19.800 - 20.000
|
200.000 |
30.6519520000, 78.5453250000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
20.000 - 20.200
|
200.000 |
30.6175000000, 78.5883333300 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
20.200 - 20.252
|
52.000 |
30.6172222200, 78.5877777780 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
20.300 - 20.400
|
100.000 |
30.6152524000, 78.5820200000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
20.400 - 20.600
|
200.000 |
30.6119520000, 78.5828320000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
20.600 - 20.788
|
188.000 |
30.6110450000, 78.5819000000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
20.800 - 20.950
|
150.000 |
30.6113286000, 78.5818500000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
21.000 - 21.150
|
150.000 |
30.6110256000, 78.5815900000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
21.200 - 21.388
|
188.000 |
30.6104320000, 78.5810520000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
21.400 - 21.520
|
120.000 |
30.6100252000, 78.5802520000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
21.800 - 21.958
|
158.000 |
30.6100000000, 78.5800100000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
22.000 - 22.110
|
110.000 |
30.6125000000, 78.5916666700 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
22.200 - 22.367
|
167.000 |
30.6113888900, 78.5894327000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
22.600 - 22.780
|
180.000 |
30.6094444000, 78.9305556000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
22.800 - 22.956
|
156.000 |
30.6077778000, 78.5950000000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
23.200 - 23.388
|
188.000 |
30.6075252000, 78.5935200000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
23.400 - 23.550
|
150.000 |
30.6074351000, 78.5971520000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
23.600 - 23.750
|
150.000 |
30.6074348000, 78.5971520000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
23.800 - 23.908
|
108.000 |
30.6100000000, 78.6000782000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
23.908 - 24.000
|
92.000 |
30.6072000000, 78.6000782000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
24.000 - 24.160
|
160.000 |
30.6119444000, 78.6013888000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
24.200 - 24.388
|
188.000 |
30.6111110000, 78.6022220000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
24.400 - 24.585
|
185.000 |
30.6111252000, 78.6021500000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
24.600 - 24.710
|
110.000 |
30.6088889000, 78.6022220000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
24.800 - 24.958
|
158.000 |
30.6075000000, 78.6025000000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
25.120 - 25.200
|
80.000 |
30.6047222220, 78.6097222220 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
25.400 - 25.600
|
200.000 |
30.6046375555, 78.6096533300 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
25.800 - 25.976
|
176.000 |
30.6046333330, 78.6097322220 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
25.990 - 26.050
|
60.000 |
30.5986630000, 78.6142170000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
26.050 - 26.120
|
70.000 |
30.5988920000, 78.6148100000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
26.175 - 26.305
|
130.000 |
30.5994580000, 78.6155810000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
26.330 - 26.635
|
305.000 |
30.6000460000, 78.6170880000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
26.685 - 26.895
|
210.000 |
30.5967830000, 78.6168300000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
26.930 - 26.950
|
20.000 |
30.5957560000, 78.6159980000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
26.955 - 27.210
|
255.000 |
30.5957360000, 78.6162860000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
27.200 - 27.350
|
150.000 |
30.6046333300, 78.6096222222 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
27.250 - 27.520
|
270.000 |
30.5949970000, 78.6181320000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
27.575 - 27.790
|
215.000 |
30.5941250000, 78.6168510000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
27.805 - 27.845
|
40.000 |
30.5939130000, 78.6143620000 |
Estimation Done |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
27.848 - 27.868
|
20.000 |
30.5942120000, 78.6142080000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
27.870 - 27.898
|
28.000 |
30.5943310000, 78.6141020000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
27.900 - 27.925
|
25.000 |
30.5947450000, 78.6144520000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
27.985 - 28.050
|
65.000 |
30.5946270000, 78.6138300000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
28.075 - 28.105
|
30.000 |
30.5937680000, 78.6134610000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
28.125 - 28.175
|
50.000 |
30.5934560000, 78.6140800000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
28.300 - 28.350
|
50.000 |
30.5929350000, 78.6157620000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
28.525 - 28.595
|
70.000 |
30.5913600000, 78.6172190000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
28.625 - 28.875
|
250.000 |
30.5910080000, 78.6172250000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
28.925 - 28.960
|
35.000 |
30.5903970000, 78.6193210000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
29.005 - 29.125
|
120.000 |
30.5906920000, 78.6198550000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
29.175 - 29.475
|
300.000 |
30.5906100000, 78.6210970000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
29.630 - 29.674
|
44.000 |
30.5872960000, 78.6231390000 |
Estimation Done |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
29.700 - 29.750
|
50.000 |
30.5870160000, 78.6236730000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
29.775 - 29.800
|
25.000 |
30.5866420000, 78.6237940000 |
Estimation Done |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
29.850 - 29.875
|
25.000 |
30.5860860000, 78.6240610000 |
Estimation Done |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
29.975 - 30.405
|
430.000 |
30.5851430000, 78.6248230000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
30.450 - 30.625
|
175.000 |
30.5830850000, 78.6266640000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
30.655 - 31.200
|
545.000 |
30.5834930000, 78.6255390000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
31.200 - 31.225
|
25.000 |
30.5807280000, 78.6292600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
31.225 - 31.241
|
16.000 |
30.5806660000, 78.6296440000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
31.245 - 31.729
|
484.000 |
30.5806330000, 78.6297600000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
31.750 - 31.775
|
25.000 |
30.5795570000, 78.6345460000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
31.800 - 31.875
|
75.000 |
30.5797860000, 78.6350170000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
32.020 - 32.062
|
42.000 |
30.5796130000, 78.6374710000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
32.125 - 32.300
|
175.000 |
30.5793820000, 78.6376280000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
32.325 - 32.450
|
125.000 |
30.5794380000, 78.6360280000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
32.675 - 32.700
|
25.000 |
30.5777593000, 78.6376400000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
32.735 - 32.827
|
92.000 |
30.5773610000, 78.6381720000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
32.800 - 32.812
|
12.000 |
30.5780660000, 78.6397440000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
32.827 - 32.875
|
48.000 |
30.5778480000, 78.6392620000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
32.887 - 32.975
|
88.000 |
30.5780820000, 78.6400790000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
32.975 - 33.011
|
36.000 |
30.5782310000, 78.6405000000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
33.011 - 33.125
|
114.000 |
30.5787210000, 78.6407360000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
33.160 - 33.348
|
188.000 |
30.5790110000, 78.6416590000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
33.390 - 33.475
|
85.000 |
30.5796170000, 78.6438650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
33.475 - 33.500
|
25.000 |
30.5801900000, 78.6442560000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
33.600 - 33.825
|
225.000 |
30.5803400000, 78.6450410000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
33.840 - 33.950
|
110.000 |
30.5785490000, 78.6438730000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
34.000 - 34.175
|
175.000 |
30.5773200000, 78.6428780000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
34.285 - 34.350
|
65.000 |
30.5761120000, 78.6419380000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
34.375 - 34.475
|
100.000 |
30.5758893000, 78.6410250000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
34.500 - 34.550
|
50.000 |
30.5762030000, 78.6424110000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
34.575 - 34.625
|
50.000 |
30.5765260000, 78.6433360000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
34.650 - 34.700
|
50.000 |
30.5766920000, 78.6434940000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
34.975 - 35.025
|
50.000 |
30.5755590000, 78.6451750000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.050 - 35.075
|
25.000 |
30.5753710000, 78.6451130000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.250 - 35.300
|
50.000 |
30.5749020000, 78.6433120000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.300 - 35.325
|
25.000 |
30.5744200000, 78.6428290000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.325 - 35.375
|
50.000 |
30.5743440000, 78.6426480000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.375 - 35.475
|
100.000 |
30.5740460000, 78.6424500000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.475 - 35.500
|
25.000 |
30.5731740000, 78.6420754000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.500 - 35.550
|
50.000 |
30.5731400000, 78.6420630000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.550 - 35.575
|
25.000 |
30.5722910000, 78.6417710000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.575 - 35.600
|
25.000 |
30.5721560000, 78.6417470000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.600 - 35.628
|
28.000 |
30.5720110000, 78.6417260000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.628 - 35.726
|
98.000 |
30.5719620000, 78.6417170000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.775 - 35.783
|
8.000 |
30.5706140000, 78.6407430000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.783 - 35.803
|
20.000 |
30.5705270000, 78.6406370000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.875 - 35.899
|
24.000 |
30.5703170000, 78.6403980000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
35.925 - 36.000
|
75.000 |
30.5699280000, 78.6399910000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.000 - 36.016
|
16.000 |
30.5695710000, 78.6392190000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.110 - 36.234
|
124.000 |
30.5693320000, 78.6385840000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.233 - 36.253
|
20.000 |
30.5684330000, 78.6376430000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.253 - 36.333
|
80.000 |
30.5678470000, 78.6375750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.333 - 36.475
|
142.000 |
30.5671770000, 78.6372950000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.475 - 36.519
|
44.000 |
30.5665140000, 78.6370070000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.519 - 36.650
|
131.000 |
30.5661500000, 78.6369620000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.577 - 36.725
|
148.000 |
30.5606180000, 78.6423620000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.650 - 36.702
|
52.000 |
30.5665140000, 78.6370070000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.702 - 36.800
|
98.000 |
30.5661500000, 78.6369620000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.800 - 36.824
|
24.000 |
30.5648640000, 78.6372600000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.824 - 36.875
|
51.000 |
30.5648580000, 78.6375880000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.875 - 36.899
|
24.000 |
30.5651450000, 78.6385060000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
36.899 - 37.323
|
424.000 |
30.5648280000, 78.6388130000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
37.475 - 37.511
|
36.000 |
30.5605730000, 78.6417270000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
37.511 - 37.525
|
14.000 |
30.5602870000, 78.6418180000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
37.525 - 37.577
|
52.000 |
30.5602210000, 78.6420180000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
37.725 - 37.793
|
68.000 |
30.5613190000, 78.6432110000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
37.793 - 37.875
|
82.000 |
30.5614480000, 78.6439500000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
37.875 - 37.983
|
108.000 |
30.5611440000, 78.6440860000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
37.983 - 37.993
|
10.000 |
30.5606570000, 78.6448190000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
37.993 - 38.021
|
28.000 |
30.5605970000, 78.6451170000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
38.012 - 38.025
|
13.000 |
30.5605180000, 78.6453530000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
38.025 - 38.097
|
72.000 |
30.5604100000, 78.6455660000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
38.097 - 38.500
|
403.000 |
30.5602350000, 78.6462940000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
38.500 - 38.548
|
48.000 |
30.5586450000, 78.6492780000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
38.548 - 38.575
|
27.000 |
30.5586500000, 78.6497880000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
38.625 - 38.685
|
60.000 |
30.5589540000, 78.6506280000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
38.675 - 38.850
|
175.000 |
30.5584540000, 78.6511500000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
38.875 - 38.931
|
56.000 |
30.5565270000, 78.6517040000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
38.975 - 39.000
|
25.000 |
30.5568850000, 78.6507360000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.000 - 39.124
|
124.000 |
30.5567310000, 78.6507530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.150 - 39.176
|
26.000 |
30.5558140000, 78.6512770000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.275 - 39.295
|
20.000 |
30.5545430000, 78.6505420000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.300 - 39.305
|
5.000 |
30.5543660000, 78.6504340000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.305 - 39.353
|
48.000 |
30.5542500000, 78.6503990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.400 - 39.425
|
25.000 |
30.5537420000, 78.6507790000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.425 - 39.537
|
112.000 |
30.5535580000, 78.6506970000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.500 - 39.575
|
75.000 |
30.5525200000, 78.6506640000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.575 - 39.603
|
28.000 |
30.5518800000, 78.6506320000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.603 - 39.653
|
50.000 |
30.5516030000, 78.6504880000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.653 - 39.697
|
44.000 |
30.5514410000, 78.6504520000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.697 - 39.772
|
75.000 |
30.5509470000, 78.6501460000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.772 - 39.868
|
96.000 |
30.5503900000, 78.6494360000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.868 - 39.893
|
25.000 |
30.5496470000, 78.6493290000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
39.893 - 39.981
|
88.000 |
30.5496180000, 78.6496850000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.025 - 40.050
|
25.000 |
30.5489080000, 78.6499060000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.050 - 40.203
|
153.000 |
30.5488320000, 78.6497210000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.153 - 40.178
|
25.000 |
30.5476630000, 78.6497970000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.178 - 40.230
|
52.000 |
30.5471910000, 78.6497320000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.230 - 40.425
|
195.000 |
30.5468360000, 78.6497760000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.425 - 40.525
|
100.000 |
30.5455520000, 78.6492080000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.525 - 40.600
|
75.000 |
30.5446730000, 78.6493140000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.600 - 40.668
|
68.000 |
30.5440280000, 78.6493750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.668 - 40.768
|
100.000 |
30.5434370000, 78.6495350000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.768 - 40.852
|
84.000 |
30.5421500000, 78.6498060000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.852 - 40.902
|
50.000 |
30.5417510000, 78.6504510000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
40.902 - 41.052
|
150.000 |
30.5414110000, 78.6506860000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.075 - 41.225
|
150.000 |
30.5406710000, 78.6520590000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.227 - 41.299
|
72.000 |
30.5390300000, 78.6506830000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.302 - 41.350
|
48.000 |
30.5388930000, 78.6504420000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.350 - 41.480
|
130.000 |
30.5388930000, 78.6504420000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.480 - 41.596
|
116.000 |
30.5370450000, 78.6509200000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.600 - 41.642
|
42.000 |
30.5367430000, 78.6510370000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.644 - 41.700
|
56.000 |
30.5362950000, 78.6513500000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.700 - 41.728
|
28.000 |
30.5363380000, 78.6516470000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.755 - 41.783
|
28.000 |
30.5363950000, 78.6512030000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.850 - 41.874
|
24.000 |
30.5353180000, 78.6509970000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.875 - 41.900
|
25.000 |
30.5352390000, 78.6504340000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.900 - 41.920
|
20.000 |
30.5354080000, 78.6505450000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.925 - 41.945
|
20.000 |
30.5350550000, 78.6500270000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
41.950 - 42.010
|
60.000 |
30.5350550000, 78.6500270000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.010 - 42.030
|
20.000 |
30.5362780000, 78.6549642000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.030 - 42.070
|
40.000 |
30.5362780000, 78.6549642000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.075 - 42.119
|
44.000 |
30.5363330000, 78.6491210000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.120 - 42.150
|
30.000 |
30.5363330000, 78.6491210000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.150 - 42.196
|
46.000 |
30.5364220000, 78.6489420000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.197 - 42.224
|
27.000 |
30.5364220000, 78.6489420000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.250 - 42.260
|
10.000 |
30.5354750000, 78.6489370000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.275 - 42.310
|
35.000 |
30.5350630000, 78.6488950000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.310 - 42.350
|
40.000 |
30.5345710000, 78.6488380000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.353 - 42.415
|
62.000 |
30.5345710000, 78.6488380000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.415 - 42.423
|
8.000 |
30.5340050000, 78.6492370000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.424 - 42.448
|
24.000 |
30.5339270000, 78.6496150000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.449 - 42.475
|
26.000 |
30.5339270000, 78.6496150000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.475 - 42.713
|
238.000 |
30.5340050000, 78.6495820000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.725 - 42.810
|
85.000 |
30.5322200000, 78.6504680000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.825 - 42.910
|
85.000 |
30.5313350000, 78.6501740000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.910 - 42.950
|
40.000 |
30.5296840000, 78.6500140000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.950 - 42.970
|
20.000 |
30.5296840000, 78.6500140000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.970 - 42.975
|
5.000 |
30.5295200000, 78.6501360000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
42.986 - 42.998
|
12.000 |
30.5293740000, 78.6495820000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.000 - 43.015
|
15.000 |
30.5293740000, 78.6495820000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.050 - 43.250
|
200.000 |
30.5294450000, 78.6488900000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.254 - 43.274
|
20.000 |
30.5294150000, 78.6475540000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.275 - 43.289
|
14.000 |
30.5294150000, 78.6475540000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.289 - 43.325
|
36.000 |
30.5294280000, 78.6471430000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.325 - 43.374
|
49.000 |
30.5294280000, 78.6471430000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.374 - 43.400
|
26.000 |
30.5287180000, 78.6468420000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.400 - 43.670
|
270.000 |
30.5287430000, 78.6469270000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.670 - 43.698
|
28.000 |
30.5259950000, 78.6460240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.700 - 43.790
|
90.000 |
30.5259950000, 78.6460240000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.800 - 43.880
|
80.000 |
30.5254380000, 78.6459570000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.880 - 43.920
|
40.000 |
30.5236840000, 78.6469280000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
43.920 - 44.070
|
150.000 |
30.5236840000, 78.6469280000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
44.100 - 44.280
|
180.000 |
30.5230580000, 78.6467150000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
44.296 - 44.309
|
13.000 |
30.5218920000, 78.6456880000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
44.325 - 44.385
|
60.000 |
30.5216410000, 78.6453130000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
44.395 - 44.440
|
45.000 |
30.5215020000, 78.6449990000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
44.500 - 44.548
|
48.000 |
30.5204480000, 78.6444125000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
44.550 - 44.634
|
84.000 |
30.5213410000, 78.6443320000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
44.700 - 44.865
|
165.000 |
30.5192360000, 78.6449480000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
44.900 - 45.010
|
110.000 |
30.5177770000, 78.6436110000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
45.172 - 45.200
|
28.000 |
30.5183330000, 78.6408330000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
45.202 - 45.332
|
130.000 |
30.5183330000, 78.6408330000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
45.350 - 45.500
|
150.000 |
30.5175000000, 78.6397220000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
45.580 - 45.780
|
200.000 |
30.5158330000, 78.6413880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
45.640 - 45.650
|
10.000 |
30.5163880000, 78.6416660000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
45.650 - 45.666
|
16.000 |
30.5163880000, 78.6416670000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
45.695 - 45.723
|
28.000 |
30.5155550000, 78.6422220000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
45.725 - 45.845
|
120.000 |
30.5152770000, 78.6419440000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
46.845 - 46.899
|
54.000 |
30.5102770000, 78.6333330000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
46.905 - 46.960
|
55.000 |
30.5102770000, 78.6333330000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
46.960 - 46.998
|
38.000 |
30.5102778000, 78.6330550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
47.000 - 47.332
|
332.000 |
30.5102770000, 78.6322220000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
47.350 - 47.410
|
60.000 |
30.5113880000, 78.6291660000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
47.425 - 47.605
|
180.000 |
30.5108330000, 78.6286110000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
48.000 - 48.200
|
200.000 |
30.4988880000, 78.6277770000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
48.200 - 48.400
|
200.000 |
30.4987820000, 78.6274820000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
48.400 - 48.600
|
200.000 |
30.4986520000, 78.6273850000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
48.600 - 48.800
|
200.000 |
30.4984320000, 78.6272150000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
48.800 - 49.000
|
200.000 |
30.4984320000, 78.6272120000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
49.000 - 49.200
|
200.000 |
30.4984310000, 78.6172120000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
49.000
|
0.000 |
30.4988880000, 78.6277770000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
49.200 - 49.400
|
200.000 |
30.4983520000, 78.6173100000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
49.400 - 49.600
|
200.000 |
30.4982350000, 78.6269130000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
49.600 - 49.800
|
200.000 |
30.4983520000, 78.6243150000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Crash barrier |
49.800 - 50.000
|
200.000 |
30.4986200000, 78.6243120000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
20.252 - 20.258
|
6.000 |
30.6165200000, 78.5865650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
20.788 - 20.800
|
12.000 |
30.6114900000, 78.5810002000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
20.950 - 21.000
|
50.000 |
30.6113282000, 78.5818430000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
21.150 - 21.200
|
50.000 |
30.6108252000, 78.5812820000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
21.520 - 21.600
|
80.000 |
30.6100510000, 78.5801520000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
21.588 - 21.600
|
12.000 |
30.6103610000, 78.5812530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
21.958 - 22.000
|
42.000 |
30.6103250000, 78.5812500000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
22.110 - 22.200
|
90.000 |
30.6015250000, 78.5915287000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
22.110 - 22.200
|
90.000 |
30.6015250000, 78.5915827000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
22.367 - 22.400
|
33.000 |
30.6113888890, 78.5908333000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
22.590 - 22.600
|
10.000 |
30.6094444000, 78.9305556000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
22.980 - 23.000
|
20.000 |
30.6094444400, 78.9305556000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
23.190 - 23.200
|
10.000 |
30.6076562000, 78.5928200000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
23.388 - 23.400
|
12.000 |
30.6075252000, 78.5935200000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
23.550 - 23.600
|
50.000 |
30.6075252000, 78.5935200000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
23.750 - 23.800
|
50.000 |
30.6074348000, 78.5971520000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
24.160 - 24.200
|
40.000 |
30.6119444000, 78.6013888800 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
24.388 - 24.400
|
12.000 |
30.6111111000, 78.6022222000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
24.585 - 24.600
|
15.000 |
30.6111252000, 78.6021530000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
24.710 - 24.800
|
90.000 |
30.6088889000, 78.6022222000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
24.958 - 25.000
|
42.000 |
30.6075000000, 78.6025000000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
25.000 - 25.120
|
120.000 |
30.6050000000, 78.6108333300 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
25.976 - 26.000
|
24.000 |
30.6075552000, 78.6020520000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
26.150 - 26.162
|
12.000 |
30.5992150000, 78.6153450000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
26.300 - 26.325
|
25.000 |
30.6002050000, 78.6169880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
26.640 - 26.685
|
45.000 |
30.5971920000, 78.6168080000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
26.900 - 26.930
|
30.000 |
30.5960140000, 78.6160800000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
27.218 - 27.248
|
30.000 |
30.5944760000, 78.6188410000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
27.525 - 27.575
|
50.000 |
30.5946310000, 78.6170320000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
27.925 - 27.985
|
60.000 |
30.5949420000, 78.6143770000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
28.100 - 28.120
|
20.000 |
30.5935460000, 78.6138020000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
28.175 - 28.275
|
100.000 |
30.5930700000, 78.6146930000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
28.500 - 28.525
|
25.000 |
30.5939320000, 78.6134960000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
28.600 - 28.628
|
28.000 |
30.5910130000, 78.6172910000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
28.875 - 28.915
|
40.000 |
30.5903940000, 78.6189750000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
28.960 - 28.990
|
30.000 |
30.5908870000, 78.6194810000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
29.125 - 29.148
|
23.000 |
30.5907100000, 78.6208240000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
29.592 - 29.625
|
33.000 |
30.5872630000, 78.6227300000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
29.675 - 29.700
|
25.000 |
30.5871320000, 78.6236720000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
29.750 - 29.775
|
25.000 |
30.5867970000, 78.6238090000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
29.805 - 29.845
|
40.000 |
30.5867720000, 78.6238830000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
29.880 - 29.970
|
90.000 |
30.5857820000, 78.6242850000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
30.410 - 30.450
|
40.000 |
30.5825620000, 78.6273450000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
30.625 - 30.655
|
30.000 |
30.5834930000, 78.6255390000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
31.775 - 31.800
|
25.000 |
30.5796060000, 78.6347280000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
31.880 - 31.970
|
90.000 |
30.5799290000, 78.6357930000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
32.300 - 32.320
|
20.000 |
30.5794610000, 78.6360570000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
32.700 - 32.735
|
35.000 |
30.5773740000, 78.6378110000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
33.125 - 33.155
|
30.000 |
30.5789800000, 78.6412390000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
33.350 - 33.385
|
35.000 |
30.5794420000, 78.6436720000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
33.500 - 33.535
|
35.000 |
30.5803130000, 78.6445980000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
33.575 - 33.600
|
25.000 |
30.5804960000, 78.6451970000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
33.825 - 33.840
|
15.000 |
30.5787070000, 78.6440540000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
33.950 - 33.963
|
13.000 |
30.5775850000, 78.6433830000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
34.275 - 34.290
|
15.000 |
30.5762210000, 78.6420980000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
34.475 - 34.500
|
25.000 |
30.5758710000, 78.6419510000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
34.925 - 34.975
|
50.000 |
30.5762780000, 78.6462390000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
35.075 - 35.250
|
175.000 |
30.5753490000, 78.6440100000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
35.725 - 35.750
|
25.000 |
30.5706960000, 78.6410010000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
35.803 - 35.875
|
72.000 |
30.5704840000, 78.6405740000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
35.899 - 35.925
|
26.000 |
30.5702620000, 78.6402820000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
36.016 - 36.125
|
109.000 |
30.5694300000, 78.6391090000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
42.225 - 42.249
|
24.000 |
30.5354960000, 78.6489300000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
42.261 - 42.275
|
14.000 |
30.5350630000, 78.6488950000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
42.350 - 42.352
|
2.000 |
30.5345710000, 78.6488380000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
42.810 - 42.823
|
13.000 |
30.5313350000, 78.6501740000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
43.018 - 43.050
|
32.000 |
30.5294450000, 78.6488900000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
43.790 - 43.800
|
10.000 |
30.5254380000, 78.6459570000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
44.070 - 44.100
|
30.000 |
30.5230580000, 78.6467150000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
44.280 - 44.295
|
15.000 |
30.5218920000, 78.6456880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
44.309 - 44.325
|
16.000 |
30.5216410000, 78.6453130000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
44.385 - 44.395
|
10.000 |
30.5215020000, 78.6449990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
44.440 - 44.448
|
8.000 |
30.5213410000, 78.6444332000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
44.634 - 44.650
|
16.000 |
30.5192890000, 78.6448730000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
44.660 - 44.675
|
15.000 |
30.5195540000, 78.6448030000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
44.680 - 44.698
|
18.000 |
30.5192360000, 78.6449480000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
44.865 - 44.900
|
35.000 |
30.5180550000, 78.6438880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
45.116 - 45.149
|
33.000 |
30.5183330000, 78.6412880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
45.335 - 45.348
|
13.000 |
30.5175000000, 78.6387220000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
45.430 - 45.580
|
150.000 |
30.5169440000, 78.6413880000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
45.668 - 45.693
|
25.000 |
30.5158330000, 78.6422220000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
47.335 - 47.350
|
15.000 |
30.5113889000, 78.6294440000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
47.410 - 47.425
|
15.000 |
30.5111110000, 78.6286111000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Parapet |
49.237 - 49.275
|
38.000 |
30.4988880000, 78.6277770000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Delimetor |
35.050 - 35.075
|
25.000 |
30.5753710000, 78.6451130000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Delimetor |
35.375 - 35.400
|
25.000 |
30.5740460000, 78.6424500000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Slide Zone |
21.000 - 21.050
|
50.000 |
30.6103170000, 78.5922420000 |
Identified |
9 |
|
|
|
Budget is not Sanctioned |
Jan 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Slide Zone |
35.000 - 35.070
|
70.000 |
30.5766000000, 78.6422670000 |
Identified |
3 |
|
|
|
Budget is not sanctioned . |
Jan 2024 |
[39]
Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway
|
Slide Zone |
46.000 - 46.050
|
50.000 |
30.5134170000, 78.6413420000 |
Identified |
6 |
|
|
|
Budget is not sanctioned. |
Jan 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.000
|
0.000 |
30.3702100000, 78.5739380000 |
Identified |
10 |
|
|
|
required crash barrier |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.035 - 0.200
|
165.000 |
30.3705320000, 78.5738730000 |
Identified |
10 |
|
|
|
required carshh barrier |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.200 - 0.395
|
195.000 |
30.3703750000, 78.5747880000 |
Identified |
10 |
|
|
|
required |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.420 - 0.457
|
37.000 |
30.3713130000, 78.5774060000 |
Identified |
10 |
|
|
|
required |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.500 - 0.520
|
20.400 |
30.3716150000, 78.5764580000 |
Estimation Done |
0 |
|
|
|
not required |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.540 - 0.568
|
28.000 |
30.3712830000, 78.5779860000 |
Estimation Done |
0 |
|
|
|
not required |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.600 - 0.768
|
168.000 |
30.3715330000, 78.5785880000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.768 - 0.800
|
32.000 |
30.3716950000, 78.5801420000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.800 - 0.960
|
160.000 |
30.3719580000, 78.5803253000 |
Estimation Done |
0 |
|
|
|
Installed under road safety work |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.800 - 0.872
|
72.000 |
30.3718230000, 78.5800780000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.872 - 0.920
|
48.000 |
30.3716500000, 78.5810520000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.920 - 0.950
|
30.000 |
30.3719560000, 78.5815300000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.950 - 0.990
|
40.000 |
30.3719920000, 78.5826470000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
0.990 - 1.000
|
10.000 |
30.3724920000, 78.5824150000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
1.000 - 1.028
|
28.000 |
30.3724820000, 78.5826520000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
1.028 - 1.173
|
145.000 |
30.3725550000, 78.5831180000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
1.252 - 1.272
|
20.000 |
30.3728270000, 78.5847530000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
1.272 - 1.400
|
128.000 |
30.3702690000, 78.5453220000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
1.400 - 1.560
|
160.000 |
30.3730820000, 78.5855060000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
1.600 - 1.700
|
100.000 |
30.3708270000, 78.5879080000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
1.820 - 1.970
|
150.000 |
30.3691920000, 78.5878520000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
2.200 - 2.320
|
120.000 |
30.3725430000, 78.5912840000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
2.400 - 2.610
|
210.000 |
30.3740680000, 78.5900510000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
2.800 - 2.848
|
48.000 |
30.3770200000, 78.5886230000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
2.848 - 3.000
|
152.000 |
30.3774200000, 78.5899230000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
3.025 - 3.075
|
50.000 |
30.3786100000, 78.5912970000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
3.200 - 3.380
|
180.000 |
30.3786510000, 78.5925140000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
3.550 - 3.600
|
50.000 |
30.3789871000, 78.5924340000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
3.644 - 3.700
|
56.000 |
30.3829540000, 78.5938900000 |
Estimation Done |
0 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
3.800 - 3.912
|
112.000 |
30.3829540000, 78.5938900000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
4.050 - 4.100
|
50.000 |
30.3845600000, 78.5955480000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
4.400 - 4.552
|
152.000 |
30.3861000000, 78.5962790000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
4.552 - 4.600
|
48.000 |
30.3857710000, 78.5949050000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
4.650 - 4.702
|
52.000 |
30.3855340000, 78.5941820000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
4.702 - 4.732
|
30.000 |
30.3855560000, 78.5935290000 |
Identified |
10 |
|
|
|
req.4 |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
4.732 - 4.760
|
28.000 |
30.3855700000, 78.5935210000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
4.760 - 4.800
|
40.000 |
30.3860250000, 78.5931140000 |
Identified |
10 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
4.800 - 4.900
|
100.000 |
30.3864340000, 78.5927560000 |
Identified |
10 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.000 - 5.020
|
20.000 |
30.3874250000, 78.5916470000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.050 - 5.200
|
150.000 |
30.3878010000, 78.5916070000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.200 - 5.336
|
136.000 |
30.3886500000, 78.5924670000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.336 - 5.400
|
64.000 |
30.3888540000, 78.5926730000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.400 - 5.600
|
200.000 |
30.3897620000, 78.5936940000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.600 - 5.640
|
40.000 |
30.3913310000, 78.5948000000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.640 - 5.684
|
44.000 |
30.3917620000, 78.5949790000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.684 - 5.744
|
60.000 |
30.3919110000, 78.5950680000 |
Identified |
10 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.744 - 5.780
|
36.000 |
30.3925460000, 78.5947620000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
5.800 - 6.000
|
200.000 |
30.3924910000, 78.5948940000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
6.000 - 6.076
|
76.000 |
30.3945770000, 78.5948600000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
6.076 - 6.200
|
124.000 |
30.3950600000, 78.5951250000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
6.240 - 6.400
|
160.000 |
30.3956310000, 78.5983470000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
6.400 - 6.600
|
200.000 |
30.3956310000, 78.5983470000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
6.600 - 6.620
|
20.000 |
30.3960730000, 78.5995280000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
6.640 - 6.800
|
160.000 |
30.3963560000, 78.6011780000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
6.800 - 6.850
|
50.000 |
30.3964290000, 78.6013510000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
6.850 - 6.910
|
60.000 |
30.3968400000, 78.6018160000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
6.910 - 6.920
|
10.000 |
30.3970800000, 78.6020260000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
7.000 - 7.180
|
180.000 |
30.3969420000, 78.6029120000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
7.230 - 7.270
|
40.000 |
30.3968550000, 78.6041950000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
7.270 - 7.400
|
130.000 |
30.3969330000, 78.6041150000 |
Identified |
10 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
7.500 - 7.520
|
20.000 |
30.3985110000, 78.6037570000 |
Identified |
10 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
7.960 - 8.000
|
40.000 |
30.4014130000, 78.6056540000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
8.000 - 8.200
|
200.000 |
30.4015970000, 78.6067350000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
8.200 - 8.370
|
170.000 |
30.4014070000, 78.6079740000 |
Identified |
10 |
|
|
|
req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
8.400 - 8.600
|
200.000 |
30.4020950000, 78.6065290000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
8.600 - 8.704
|
104.000 |
30.4033210000, 78.6054490000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
8.696 - 8.746
|
50.000 |
30.4035830000, 78.6065950000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
8.800 - 8.918
|
118.000 |
30.4037820000, 78.6080270000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
8.948 - 9.000
|
52.000 |
30.4042210000, 78.6085630000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.023 - 9.139
|
116.000 |
30.4043250000, 78.6097070000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.232 - 9.318
|
86.000 |
30.4046830000, 78.6114850000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.324 - 9.370
|
46.000 |
30.4050070000, 78.6124010000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.370 - 9.382
|
12.000 |
30.4053300000, 78.6124140000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.400 - 9.470
|
70.000 |
30.4054480000, 78.6123920000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.470 - 9.600
|
130.000 |
30.4061100000, 78.6128510000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.600 - 9.640
|
40.000 |
30.4070090000, 78.6137180000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.675 - 9.819
|
144.000 |
30.4074190000, 78.6140660000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.861 - 9.913
|
52.000 |
30.4077260000, 78.6156520000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
9.959 - 10.111
|
152.000 |
30.4083710000, 78.6162480000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
10.147 - 10.205
|
58.000 |
30.4098980000, 78.6160320000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
10.205 - 10.245
|
40.000 |
30.4103370000, 78.6161580000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
10.286 - 10.334
|
48.000 |
30.4110300000, 78.6162630000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
10.350 - 10.388
|
38.000 |
30.4118160000, 78.6160720000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
10.400 - 10.544
|
144.000 |
30.4124600000, 78.4124600000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
10.544 - 10.600
|
56.000 |
30.4137820000, 78.6167890000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
10.600 - 10.800
|
200.000 |
30.4140810000, 78.6171570000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
10.800 - 11.000
|
200.000 |
30.4140170000, 78.6189810000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
11.000 - 11.200
|
200.000 |
30.4138750000, 78.6204990000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
11.200 - 11.400
|
200.000 |
30.4142790000, 78.6224730000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
11.400 - 11.480
|
80.000 |
30.4146370000, 78.6240520000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
11.480 - 11.520
|
40.000 |
30.4146020000, 78.6249610000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
11.520 - 11.596
|
76.000 |
30.4146310000, 78.6253360000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
11.700 - 11.756
|
56.000 |
30.4148230000, 78.6269390000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
11.800 - 12.080
|
280.000 |
30.4145980000, 78.6299000000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
12.000 - 12.023
|
23.000 |
30.4145980000, 78.6299000000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
12.350 - 12.400
|
50.000 |
30.4156630000, 78.6326400000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
12.428 - 12.458
|
30.000 |
30.4157550000, 78.6340800000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
12.600 - 12.670
|
70.000 |
30.4155560000, 78.6356640000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.000 - 13.164
|
164.000 |
30.4171910000, 78.6371900000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.164 - 13.200
|
36.000 |
30.4177390000, 78.6386880000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.200 - 13.232
|
32.000 |
30.4177490000, 78.6386330000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.232 - 13.254
|
22.000 |
30.4177390000, 78.6386880000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.330 - 13.426
|
96.000 |
30.4182040000, 78.6401460000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.426 - 13.448
|
22.000 |
30.4177670000, 78.6410130000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.448 - 13.488
|
40.000 |
30.4176500000, 78.6410860000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.488 - 13.673
|
185.000 |
30.4174070000, 78.6411930000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.750 - 13.810
|
60.000 |
30.4169170000, 78.6430180000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.800 - 13.822
|
22.000 |
30.4169050000, 78.6429930000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.822 - 13.870
|
48.000 |
30.4169510000, 78.6429710000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
13.870 - 13.899
|
29.000 |
30.4169520000, 78.6429620000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.000 - 14.012
|
12.000 |
30.4196720000, 78.6406430000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.012 - 14.094
|
82.000 |
30.4202670000, 78.6409180000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.200 - 14.240
|
40.000 |
30.4210010000, 78.6411420000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.440 - 14.468
|
28.000 |
30.4216790000, 78.6429260000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.468 - 14.528
|
60.000 |
30.4217320000, 78.6429360000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.528 - 14.584
|
56.000 |
30.4222920000, 78.6429380000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.584 - 14.600
|
16.000 |
30.4226860000, 78.6429420000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.600 - 14.660
|
60.000 |
30.4230230000, 78.6429810000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.660 - 14.708
|
48.000 |
30.4233830000, 78.6431190000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.708 - 14.800
|
92.000 |
30.4236270000, 78.6430870000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.800 - 14.940
|
140.000 |
30.4247020000, 78.6426770000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.940 - 14.960
|
20.000 |
30.4256810000, 78.6422740000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
14.960 - 15.000
|
40.000 |
30.4255180000, 78.6422820000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.000 - 15.020
|
20.000 |
30.4264800000, 78.6420570000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.020 - 15.200
|
180.000 |
30.4265400000, 78.6420740000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.200 - 15.244
|
44.000 |
30.4273898000, 78.6437990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.244 - 15.256
|
12.000 |
30.4268440000, 78.6437380000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.256 - 15.324
|
68.000 |
30.4266900000, 78.6437650000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.324 - 15.359
|
35.000 |
30.4266630000, 78.6437280000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.359 - 15.401
|
42.000 |
30.4266030000, 78.6437930000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.400 - 15.420
|
20.000 |
30.4257960000, 78.6441310000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.420 - 15.800
|
380.000 |
30.4256260000, 78.6442170000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.800 - 15.812
|
12.000 |
30.4123568000, 78.6455840000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
15.886 - 15.998
|
112.000 |
30.4430360000, 78.6900400000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.000 - 16.022
|
22.000 |
30.4430360000, 78.6900400000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.022 - 16.050
|
28.000 |
30.4429160000, 78.6900400000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.050 - 16.076
|
26.000 |
30.4242200000, 78.6481200000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.084 - 16.100
|
16.000 |
30.4246420000, 78.6488410000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.100 - 16.144
|
44.000 |
30.4247580000, 78.6487790000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.144 - 16.148
|
4.000 |
30.4249900000, 78.6486300000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.148 - 16.164
|
16.000 |
30.4249900000, 78.6486300000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.164 - 16.272
|
108.000 |
30.4252590000, 78.6485230000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.292 - 16.313
|
21.000 |
30.4258130000, 78.6491300000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.313 - 16.365
|
52.000 |
30.4259160000, 78.6494060000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.365 - 16.381
|
16.000 |
30.4259160000, 78.6494060000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.381 - 16.401
|
20.000 |
30.4262630000, 78.6496990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.400 - 16.565
|
165.000 |
30.4262630000, 78.6496990000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.416 - 16.425
|
9.200 |
30.4263730000, 78.6502090000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.522 - 16.600
|
78.000 |
30.4266190000, 78.6508990000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.600 - 16.616
|
16.000 |
30.4269740000, 78.6506560000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.616 - 16.628
|
12.000 |
30.4267287000, 78.6504200000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.628 - 16.652
|
24.000 |
30.4272870000, 78.6504200000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.652 - 16.668
|
16.000 |
30.4274490000, 78.6504560000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.668 - 16.684
|
16.000 |
30.4275480000, 78.6504820000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.684 - 16.702
|
18.000 |
30.4276430000, 78.6505540000 |
Identified |
10 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.700 - 16.800
|
100.000 |
30.4277900000, 78.6507020000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.742 - 16.794
|
52.000 |
30.4277890000, 78.6527300000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.800 - 16.812
|
12.000 |
30.4280160000, 78.6520890000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
16.872 - 16.924
|
52.000 |
30.4277890000, 78.6527300000 |
Treatment in Progress |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
17.022 - 17.046
|
24.000 |
30.4287910000, 78.6531420000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
17.078 - 17.108
|
30.000 |
30.4290440000, 78.6533460000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
17.134 - 17.198
|
64.000 |
30.4288980000, 78.6538570000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
17.200 - 17.224
|
24.000 |
30.4286750000, 78.6543200000 |
Treatment in Progress |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
17.224 - 17.248
|
24.000 |
30.4285340000, 78.6545200000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
17.272 - 17.304
|
32.000 |
30.4283220000, 78.6551300000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
17.304 - 17.318
|
14.000 |
30.4282470000, 78.6554020000 |
Identified |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Crash barrier |
17.318 - 17.378
|
60.000 |
30.4282070000, 78.6555490000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
0.400 - 0.415
|
15.000 |
30.3711470000, 78.5766960000 |
Estimation Done |
0 |
|
|
|
not required |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
0.520 - 0.540
|
20.000 |
30.3712940000, 78.5779430000 |
Estimation Done |
0 |
|
|
|
not required |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
0.568 - 0.600
|
32.000 |
30.3716860000, 78.5784050000 |
Estimation Done |
0 |
|
|
|
not required |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
1.175 - 1.235
|
60.000 |
30.3728580000, 78.5833980000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
1.600 - 1.700
|
100.000 |
30.3708270000, 78.5879080000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
2.260 - 2.300
|
40.000 |
30.3731500000, 78.5908980000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
2.620 - 2.640
|
20.000 |
30.3756820000, 78.5892800000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
3.070 - 3.195
|
125.000 |
30.3786100000, 78.5912970000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
3.400 - 3.550
|
150.000 |
30.3798710000, 78.5924340000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
3.600 - 3.744
|
144.000 |
30.3813070000, 78.5935010000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
3.912 - 4.000
|
88.000 |
30.3829540000, 78.5938900000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
4.600 - 4.650
|
50.000 |
30.3855490000, 78.5944910000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
4.900 - 5.000
|
100.000 |
30.3869470000, 78.5921050000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
5.020 - 5.050
|
30.000 |
30.3874660000, 78.5916830000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
6.620 - 6.640
|
20.000 |
30.3962630000, 78.6007165000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
6.920 - 7.000
|
80.000 |
30.3968220000, 78.6027180000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
7.200 - 7.230
|
30.000 |
30.3963250000, 78.6045340000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
7.540 - 7.600
|
60.000 |
30.3985020000, 78.6037590000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
7.600 - 7.800
|
200.000 |
30.3995710000, 78.6041430000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
8.300 - 8.315
|
15.000 |
30.4016690000, 78.6081200000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
8.918 - 8.948
|
30.000 |
30.4037820000, 78.6080270000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
9.000 - 9.016
|
16.000 |
30.4042280000, 78.6093310000 |
Estimation Done |
0 |
|
|
|
under safety work |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
9.139 - 9.200
|
61.000 |
30.4045440000, 78.6108080000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
9.200 - 9.232
|
32.000 |
30.4049590000, 78.6112610000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
10.111 - 10.147
|
36.000 |
30.4096170000, 78.6157770000 |
Identified |
10 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
11.600 - 11.680
|
80.000 |
30.4147110000, 78.6260710000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
11.756 - 11.786
|
30.000 |
30.4148120000, 78.6274550000 |
Estimation Done |
0 |
|
|
|
under safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
14.240 - 14.400
|
160.000 |
30.4210250000, 78.6419330000 |
Identified |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
14.400 - 14.440
|
40.000 |
30.4216170000, 78.6431360000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
15.812 - 15.866
|
54.000 |
30.4235680000, 78.6455840000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
16.076 - 16.084
|
8.000 |
30.4244920000, 78.6486550000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
16.812 - 16.872
|
60.000 |
30.4279720000, 78.6521220000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
16.924 - 17.000
|
76.000 |
30.4282180000, 78.6529460000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
17.000 - 17.022
|
22.000 |
30.4285480000, 78.6531110000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
17.066 - 17.078
|
12.000 |
30.4290600000, 78.6533040000 |
Estimation Done |
0 |
|
|
|
|
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
17.108 - 17.134
|
26.000 |
30.4289810000, 78.6536040000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
17.248 - 17.272
|
24.000 |
30.4284450000, 78.6547990000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Parapet |
17.378 - 17.400
|
22.000 |
30.4279940000, 78.6561730000 |
Estimation Done |
0 |
|
|
|
safety |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Delimetor |
0.768 - 0.800
|
32.000 |
30.3716950000, 78.5801420000 |
Estimation Done |
0 |
|
|
|
not required |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Delimetor |
0.920 - 0.950
|
30.000 |
30.3719560000, 78.5815300000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Delimetor |
1.040 - 1.100
|
60.000 |
30.3724800000, 78.5834860000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Delimetor |
2.200 - 2.260
|
60.000 |
30.3725430000, 78.5912840000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[47]
Jakhdhar Ghansali state highway
|
Delimetor |
2.400 - 2.460
|
60.000 |
30.3740980000, 78.5900510000 |
Estimation Done |
0 |
|
|
|
not req. |
Nov 2024 |
[170]
Ghansali Ghuttu motor road
|
Slide Zone |
17.000 - 17.095
|
95.000 |
30.4973030000, 78.7170890000 |
Identified |
2 |
|
|
|
Budget is not sanctioned. |
Jan 2024 |
[171]
Ghansali Koti Akhodi Hulanakhal Moolgarh motor road
|
Slide Zone |
4.500 - 4.570
|
70.000 |
30.4356110000, 78.6779280000 |
Identified |
7 |
|
|
|
Budget is not sanctioned. |
Jan 2024 |
[4076]
Vinakkhal Bhigun Tingarh Jakhana motor road
|
Slide Zone |
6.000 - 6.060
|
60.000 |
30.5955560000, 78.6968140000 |
Identified |
8 |
|
|
|
Budget in not sanctioned. |
Jan 2024 |
[4076]
Vinakkhal Bhigun Tingarh Jakhana motor road
|
Slide Zone |
7.000 - 7.070
|
70.000 |
30.5944440000, 78.6931670000 |
Identified |
8 |
|
|
|
Budget is not sanctioned. |
Jan 2024 |
[4084]
Hedi Bend to Sem Kafolgaon Motor Road
|
Slide Zone |
3.000 - 3.070
|
70.000 |
30.5267330000, 78.6554360000 |
Identified |
10 |
|
|
|
|
Jan 2024 |
[4090]
Vinakkhal Bheti Kaldi motor road
|
Slide Zone |
1.000 - 1.070
|
70.000 |
30.5654720000, 78.6605720000 |
Identified |
8 |
|
|
|
Budget is not sanctioned. |
Jan 2024 |
[7380]
Km 13 Bend of Lata Sitakot Bhattgaon (Gaungarh) motor road to Naukund -GIC Bhattgaon Lodus motor road : .
|
Slide Zone |
4.800 - 4.880
|
80.000 |
30.5322220000, 78.6248190000 |
Identified |
7 |
|
|
|
Road is totally washed out due to land slide on valley side. |
Jan 2024 |