[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
culvert |
6.322 - 6.326
|
4.000 |
30.4762140000, 77.7851560000 |
Estimation Done |
9 |
|
|
|
Rasoolpur Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
culvert |
8.620 - 8.622
|
1.500 |
30.4885140000, 77.8040050000 |
Estimation Done |
9 |
|
|
|
Bright Angle Junction, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
culvert |
10.585 - 10.615
|
30.000 |
30.5008930000, 77.8172280000 |
Estimation Done |
9 |
|
|
|
Jalaliya Local Nala, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
culvert |
11.075 - 11.078
|
3.000 |
30.5037060000, 77.8210750000 |
Estimation Done |
8 |
|
|
|
Jalaliya local Nala, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
culvert |
12.515 - 12.518
|
3.000 |
30.5051030000, 77.8345440000 |
Estimation Done |
9 |
|
|
|
Badwala Irrigation Canal, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
culvert |
13.885 - 13.888
|
3.000 |
30.5159170000, 77.8352520000 |
Estimation Done |
9 |
|
|
|
Haipur Local Nala, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
culvert |
25.500 - 25.506
|
6.000 |
30.5291000000, 77.8854000000 |
Estimation Done |
9 |
|
|
|
Good condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
culvert |
28.250 - 28.256
|
6.000 |
30.5405000000, 77.9015000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
culvert |
32.040 - 32.046
|
6.000 |
30.5263111100, 77.9117638900 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cause way |
24.600 - 24.615
|
15.000 |
30.5268638900, 77.8729583300 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cause way |
25.150 - 25.190
|
40.000 |
30.5268111100, 77.8829805600 |
Estimation Done |
9 |
|
|
|
Good condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cause way |
25.430 - 25.437
|
7.000 |
30.5284055600, 77.8842777800 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cause way |
26.320 - 26.327
|
7.000 |
30.5322055600, 77.8866944400 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cause way |
34.700 - 34.720
|
20.000 |
30.5209000000, 77.9384000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cause way |
36.300 - 36.345
|
45.000 |
30.5206000000, 77.9478000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cause way |
36.900 - 36.915
|
15.000 |
30.5215000000, 77.9533000000 |
Estimation Done |
8 |
|
|
|
Good condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
0.264
|
0.000 |
30.4413720000, 77.7379810000 |
Estimation Done |
8 |
|
|
|
Road widening Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
0.304
|
0.000 |
30.4415920000, 77.7382630000 |
Estimation Done |
8 |
|
|
|
Divider Ahead Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
2.734
|
0.000 |
30.4570750000, 77.7555150000 |
Treatment in Progress |
5 |
|
|
|
School Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
3.304
|
0.000 |
30.4607450000, 77.7596590000 |
Estimation Done |
9 |
|
|
|
T- Junction Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
3.394
|
0.000 |
30.4613220000, 77.7603090000 |
Estimation Done |
8 |
|
|
|
Road widening Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
3.404
|
0.000 |
30.4613300000, 77.7603220000 |
Estimation Done |
8 |
|
|
|
Divider Ahead Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
5.867
|
0.000 |
30.4738130000, 77.7809090000 |
Estimation Done |
8 |
|
|
|
Road widening Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.458
|
0.000 |
30.4873820000, 77.8027700000 |
Estimation Done |
8 |
|
|
|
Speed Limit Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.468
|
0.000 |
30.4875070000, 77.8028620000 |
Estimation Done |
9 |
|
|
|
School Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.488
|
0.000 |
30.4876190000, 77.8030160000 |
Estimation Done |
9 |
|
|
|
No Over Turning Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.548
|
0.000 |
30.4880270000, 77.8034680000 |
Estimation Done |
9 |
|
|
|
S-Bend Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.568
|
0.000 |
30.4881170000, 77.8035720000 |
Estimation Done |
9 |
|
|
|
Rumble Strip Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.578
|
0.000 |
30.4882050000, 77.8036830000 |
Estimation Done |
9 |
|
|
|
Cross Road Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.598
|
0.000 |
30.4883210000, 77.8038020000 |
Estimation Done |
9 |
|
|
|
Zebra Crossing Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.599
|
0.000 |
30.4882810000, 77.8039210000 |
Estimation Done |
9 |
|
|
|
School Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.608
|
0.000 |
30.4884650000, 77.8039010000 |
Estimation Done |
8 |
|
|
|
Stop Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.638
|
0.000 |
30.4887370000, 77.8040350000 |
Estimation Done |
9 |
|
|
|
Stop Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.658
|
0.000 |
30.4887670000, 77.8041270000 |
Estimation Done |
8 |
|
|
|
Zebra Crossing Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.668
|
0.000 |
30.4888860000, 77.8041980000 |
Estimation Done |
9 |
|
|
|
Cross Road Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.688
|
0.000 |
30.4889920000, 77.8043310000 |
Estimation Done |
9 |
|
|
|
Rumble Strip Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.698
|
0.000 |
30.4890220000, 77.8043970000 |
Estimation Done |
9 |
|
|
|
S-Bend Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.718
|
0.000 |
30.4890950000, 77.8045010000 |
Estimation Done |
9 |
|
|
|
No Over taking, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
8.738
|
0.000 |
30.4891760000, 77.8046760000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.338
|
0.000 |
30.4924670000, 77.8096420000 |
Estimation Done |
9 |
|
|
|
Rumble Strip Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.358
|
0.000 |
30.4926080000, 77.8098770000 |
Estimation Done |
9 |
|
|
|
T-Junction Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.468
|
0.000 |
30.4931980000, 77.8108630000 |
Estimation Done |
9 |
|
|
|
Stop Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.498
|
0.000 |
30.4933920000, 77.8111490000 |
Estimation Done |
9 |
|
|
|
School Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.588
|
0.000 |
30.4938560000, 77.8117250000 |
Estimation Done |
8 |
|
|
|
Population Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.590
|
0.000 |
30.4938220000, 77.8118030000 |
Estimation Done |
9 |
|
|
|
School Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.618
|
0.000 |
30.4940850000, 77.8119600000 |
Estimation Done |
8 |
|
|
|
Speed Limit Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.638
|
0.000 |
30.4942290000, 77.8120970000 |
Estimation Done |
8 |
|
|
|
No over Taking Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.650
|
0.000 |
30.4943950000, 77.8122050000 |
Estimation Done |
10 |
|
|
|
S-Bend Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.678
|
0.000 |
30.4948290000, 77.8123850000 |
Estimation Done |
9 |
|
|
|
Rumble strip Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.728
|
0.000 |
30.4949180000, 77.8123620000 |
Estimation Done |
10 |
|
|
|
Y- Junction Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.768
|
0.000 |
30.4948610000, 77.8123990000 |
Estimation Done |
8 |
|
|
|
Zebra Crossing Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.782
|
0.000 |
30.4952350000, 77.8125220000 |
Estimation Done |
9 |
|
|
|
Stop Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.825
|
0.000 |
30.4954820000, 77.8129890000 |
Estimation Done |
10 |
|
|
|
Stop Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.845
|
0.000 |
30.4954850000, 77.8131290000 |
Estimation Done |
10 |
|
|
|
Zebra Crossing Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.865
|
0.000 |
30.4955150000, 77.8133640000 |
Estimation Done |
9 |
|
|
|
Rumble Strip Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.875
|
0.000 |
30.4955620000, 77.8134470000 |
Estimation Done |
8 |
|
|
|
S-Bend Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.885
|
0.000 |
30.4955920000, 77.8136090000 |
Estimation Done |
8 |
|
|
|
Y-Junction Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.905
|
0.000 |
30.4956490000, 77.8137390000 |
Estimation Done |
8 |
|
|
|
No Over Taking Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.925
|
0.000 |
30.4957540000, 77.8139110000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
9.955
|
0.000 |
30.4958830000, 77.8141910000 |
Estimation Done |
8 |
|
|
|
Population Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
10.555
|
0.000 |
30.5007070000, 77.8170480000 |
Estimation Done |
9 |
|
|
|
Right Turn Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.325
|
0.000 |
30.5049310000, 77.8333350000 |
Estimation Done |
8 |
|
|
|
Speed Limit Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.335
|
0.000 |
30.5049440000, 77.8334020000 |
Estimation Done |
9 |
|
|
|
No over Taking Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.345
|
0.000 |
30.5049750000, 77.8335240000 |
Estimation Done |
8 |
|
|
|
Turn Right Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.435
|
0.000 |
30.5047610000, 77.8344750000 |
Estimation Done |
8 |
|
|
|
No over Taking Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.445
|
0.000 |
30.5046730000, 77.8345690000 |
Estimation Done |
10 |
|
|
|
H.P. Bend Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.455
|
0.000 |
30.5046110000, 77.8345130000 |
Estimation Done |
8 |
|
|
|
Turn Left Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.465
|
0.000 |
30.5045770000, 77.8346910000 |
Estimation Done |
8 |
|
|
|
School Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.475
|
0.000 |
30.5044750000, 77.8348040000 |
Estimation Done |
10 |
|
|
|
Zebra Crossing Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.485
|
0.000 |
30.5044390000, 77.8348310000 |
Estimation Done |
8 |
|
|
|
Stop Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.545
|
0.000 |
30.5045740000, 77.8351710000 |
Estimation Done |
7 |
|
|
|
Stop Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.555
|
0.000 |
30.5046830000, 77.8350330000 |
Estimation Done |
10 |
|
|
|
Zebra Crossing Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.565
|
0.000 |
30.5047550000, 77.8349220000 |
Estimation Done |
8 |
|
|
|
School Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.575
|
0.000 |
30.5047980000, 77.8348010000 |
Estimation Done |
9 |
|
|
|
H.P. Bend Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.585
|
0.000 |
30.5047120000, 77.8347720000 |
Estimation Done |
8 |
|
|
|
Turn Right Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
12.895
|
0.000 |
30.5076070000, 77.8351640000 |
Treatment in Progress |
5 |
|
|
|
Turn Left Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
13.045
|
0.000 |
30.5084680000, 77.8344780000 |
Estimation Done |
9 |
|
|
|
No Over taking Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
14.845
|
0.000 |
30.5178790000, 77.8414620000 |
Treatment in Progress |
5 |
|
|
|
Turn Left Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
15.245
|
0.000 |
30.5181290000, 77.8456670000 |
Treatment in Progress |
5 |
|
|
|
Turn left board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
15.345
|
0.000 |
30.5186270000, 77.8462580000 |
Treatment in Progress |
5 |
|
|
|
Turn Right Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
16.145
|
0.000 |
30.5257380000, 77.8482630000 |
Estimation Done |
8 |
|
|
|
N-Turn Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
16.335
|
0.000 |
30.5258590000, 77.8507760000 |
Estimation Done |
9 |
|
|
|
N- Turn Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
16.345
|
0.000 |
30.5257690000, 77.8504890000 |
Estimation Done |
9 |
|
|
|
Rumble strip Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
17.650
|
0.000 |
30.5273000000, 77.8527000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
17.800
|
0.000 |
30.5269000000, 77.8531000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
23.200
|
0.000 |
30.5244000000, 77.8710000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
23.450
|
0.000 |
30.5265000000, 77.8727000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
27.100
|
0.000 |
30.5346000000, 77.8893000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
27.400
|
0.000 |
30.5359000000, 77.8910000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
37.200
|
0.000 |
30.5199000000, 77.9533000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Cautionary board |
37.350
|
0.000 |
30.5203000000, 77.9552000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
17.500 - 17.564
|
64.000 |
30.5251500000, 77.8537100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
17.670 - 17.714
|
44.000 |
30.5241200000, 77.8547400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
17.890 - 17.982
|
92.000 |
30.5230200000, 77.8571600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
18.180 - 18.392
|
212.000 |
30.5216800000, 77.8596800000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
18.500 - 18.700
|
200.000 |
30.5201800000, 77.8631400000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
18.720 - 19.320
|
600.000 |
30.5202700000, 77.8633500000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
19.400 - 19.624
|
224.000 |
30.5244400000, 77.8610900000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
19.620 - 19.940
|
320.000 |
30.5263500000, 77.8589700000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
20.200 - 20.592
|
392.000 |
30.5278300000, 77.8575500000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
20.800 - 21.050
|
250.000 |
30.5257300000, 77.8614800000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
21.200 - 21.764
|
564.000 |
30.5277700000, 77.8602200000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
22.100 - 22.400
|
300.000 |
30.5260900000, 77.8648600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
22.525 - 23.225
|
700.000 |
30.5237200000, 77.8653500000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
23.400 - 24.200
|
800.000 |
30.5255100000, 77.8550500000 |
Estimation Done |
9 |
|
|
|
Good condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
24.440 - 25.040
|
600.000 |
30.5237400000, 77.8612100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
26.000 - 27.520
|
1520.000 |
30.5363400000, 77.8956500000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
27.780 - 27.980
|
200.000 |
30.5375900000, 77.8984500000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
28.250 - 28.358
|
108.000 |
30.5406300000, 77.9014400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
28.580 - 28.660
|
80.000 |
30.5406000000, 77.9053000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
30.800 - 31.324
|
524.000 |
30.5263000000, 77.1116000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
31.200 - 31.400
|
200.000 |
30.5234000000, 77.9157000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
31.400 - 31.500
|
100.000 |
30.5228000000, 77.9161000000 |
Estimation Done |
10 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
31.900 - 32.148
|
248.000 |
30.5181000000, 77.9173000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
32.250 - 32.410
|
160.000 |
30.5179000000, 77.9204000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
32.550 - 32.650
|
100.000 |
30.5175000000, 77.9253000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
33.000 - 33.156
|
156.000 |
30.5173000000, 77.9257000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
33.300 - 33.464
|
164.000 |
30.5180000000, 77.9285000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
33.430 - 33.478
|
48.000 |
30.5183000000, 77.9302000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
33.830 - 34.118
|
288.000 |
30.5178000000, 77.9339000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
34.500 - 34.552
|
52.000 |
30.5202000000, 77.9359000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
34.900 - 35.180
|
280.000 |
30.5201000000, 77.9393000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
35.450 - 35.750
|
300.000 |
30.5181000000, 77.9423000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
36.300 - 36.560
|
260.000 |
30.5211000000, 77.9485000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
37.500 - 37.840
|
340.000 |
30.5190000000, 77.9567000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
38.140 - 38.400
|
260.000 |
30.5177000000, 77.9603000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
38.330 - 39.160
|
830.000 |
30.5141000000, 77.9690000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
39.500 - 39.822
|
322.000 |
30.5136000000, 77.9701000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Crash barrier |
40.000 - 40.880
|
880.000 |
30.5161000000, 77.9729000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
0.305
|
0.000 |
30.4415830000, 77.7382590000 |
Estimation Done |
8 |
|
|
|
Over Head Board Name & Distance Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
0.454
|
0.000 |
30.4424850000, 77.7394290000 |
Estimation Done |
9 |
|
|
|
Name Herbatpur RHS, Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
1.104
|
0.000 |
30.4464160000, 77.7443890000 |
Estimation Done |
9 |
|
|
|
Place Name RHS, Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
1.824
|
0.000 |
30.4508570000, 77.7496190000 |
Estimation Done |
9 |
|
|
|
Petrol Pump Board RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
1.844
|
0.000 |
30.4509920000, 77.7499340000 |
Estimation Done |
9 |
|
|
|
Speed limit Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
2.034
|
0.000 |
30.4522590000, 77.7512350000 |
Estimation Done |
9 |
|
|
|
दुर्घटना सम्भावित क्षेत्र, धीरे चलें बोर्ड LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
2.064
|
0.000 |
30.4524830000, 77.7515430000 |
Estimation Done |
9 |
|
|
|
Place Name Board LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
2.074
|
0.000 |
30.4532130000, 77.7523270000 |
Estimation Done |
9 |
|
|
|
Place Name Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
2.084
|
0.000 |
30.4532480000, 77.7524390000 |
Estimation Done |
9 |
|
|
|
तीव्र मोड, धीरे चलें बोर्ड LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
2.184
|
0.000 |
30.4532560000, 77.7530050000 |
Estimation Done |
9 |
|
|
|
Hospital Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
3.234
|
0.000 |
30.4599439000, 77.7587280000 |
Estimation Done |
9 |
|
|
|
Pedistrial Crossing, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
3.284
|
0.000 |
30.4606470000, 77.7597330000 |
Estimation Done |
9 |
|
|
|
Place Name Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
4.373
|
0.000 |
30.4670360000, 77.7678520000 |
Estimation Done |
9 |
|
|
|
Unipole Place Name, Distance Board, Geeta Bhawan Chowk |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
4.684
|
0.000 |
30.4686230000, 77.7705990000 |
Estimation Done |
9 |
|
|
|
Unipole Place Name Distance Board, Phadi Gali Chowk. |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
5.050
|
0.000 |
30.4704380000, 77.7737670000 |
Estimation Done |
9 |
|
|
|
Unipole Place Name Distance Board, Hospital Chowk. |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
5.508
|
0.000 |
30.4723910000, 77.7781140000 |
Estimation Done |
9 |
|
|
|
Unipole Place Name Distance Board, Dakpathar Chowk. RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
5.917
|
0.000 |
30.4744260000, 77.7816890000 |
Estimation Done |
9 |
|
|
|
Unipole Place Name Distance Board, Rasulpur LHS. |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
6.022
|
0.000 |
30.4750240000, 77.7829720000 |
Estimation Done |
8 |
|
|
|
Hospital Board LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
6.040
|
0.000 |
30.4752350000, 77.7833910000 |
Estimation Done |
9 |
|
|
|
Place Name Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
6.883
|
0.000 |
30.4787720000, 77.7901830000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
7.278
|
0.000 |
30.4806020000, 77.7934850000 |
Estimation Done |
9 |
|
|
|
Unipole Place Name Distance Board, Telpura Chowk. |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
8.358
|
0.000 |
30.4867180000, 77.8021820000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
8.448
|
0.000 |
30.4873430000, 77.8027310000 |
Estimation Done |
9 |
|
|
|
दुर्घटना सम्भावित क्षेत्र, धीरे चलें बोर्ड LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
8.628
|
0.000 |
30.4886150000, 77.8039050000 |
Estimation Done |
9 |
|
|
|
Unipole Place Name & Distance Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
8.678
|
0.000 |
30.4889440000, 77.8042320000 |
Estimation Done |
9 |
|
|
|
दुर्घटना सम्भावित क्षेत्र, धीरे चलें बोर्ड RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
8.698
|
0.000 |
30.4890750000, 77.8042750000 |
Estimation Done |
9 |
|
|
|
Place Name Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
9.128
|
0.000 |
30.4913500000, 77.8079440000 |
Estimation Done |
8 |
|
|
|
Place Name Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
9.158
|
0.000 |
30.4915410000, 77.8080720000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
9.318
|
0.000 |
30.4923850000, 77.8094830000 |
Estimation Done |
9 |
|
|
|
Place Name Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
9.378
|
0.000 |
30.4927800000, 77.8100400000 |
Estimation Done |
8 |
|
|
|
Unipole Place Name & Distance Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
9.488
|
0.000 |
30.4933030000, 77.8119240000 |
Estimation Done |
8 |
|
|
|
Place Name Board, RHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
9.588
|
0.000 |
30.4940850000, 77.8119600000 |
Estimation Done |
9 |
|
|
|
Place Name Board, LHS |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
9.628
|
0.000 |
30.4962160000, 77.8146670000 |
Estimation Done |
9 |
|
|
|
Place Name |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
9.708
|
0.000 |
30.4955270000, 77.8133570000 |
Estimation Done |
9 |
|
|
|
Danger Zone Area, Slow going Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
10.005
|
0.000 |
30.4961250000, 77.8146380000 |
Estimation Done |
9 |
|
|
|
Place Name |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
10.085
|
0.000 |
30.4967710000, 77.8151810000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
10.595
|
0.000 |
30.5010630000, 77.8172420000 |
Estimation Done |
9 |
|
|
|
Place Name Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
10.795
|
0.000 |
30.5021780000, 77.8186960000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
11.995
|
0.000 |
30.5048940000, 77.8298660000 |
Estimation Done |
9 |
|
|
|
Place Name Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
12.125
|
0.000 |
30.5046260000, 77.8311710000 |
Estimation Done |
9 |
|
|
|
Unpole Place name & Distance Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
12.315
|
0.000 |
30.5048120000, 77.8332430000 |
Estimation Done |
8 |
|
|
|
Place Name Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
12.375
|
0.000 |
30.5050010000, 77.8339230000 |
Estimation Done |
8 |
|
|
|
Eng. Service Toll No. Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
12.675
|
0.000 |
30.5056050000, 77.8346630000 |
Estimation Done |
8 |
|
|
|
Unipole Place Name distance Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
12.925
|
0.000 |
30.5073970000, 77.8350560000 |
Estimation Done |
9 |
|
|
|
दुर्घटना सम्भावित क्षेत्र, धीरे चलें बोर्ड |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
12.930
|
0.000 |
30.5075570000, 77.8351090000 |
Estimation Done |
9 |
|
|
|
Place Name Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
13.075
|
0.000 |
30.5084220000, 77.8346080000 |
Estimation Done |
9 |
|
|
|
दुर्घटना सम्भावित क्षेत्र, धीरे चलें बोर्ड |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
14.375
|
0.000 |
30.5171340000, 77.8364070000 |
Estimation Done |
9 |
|
|
|
Unipole Place Name & Distance Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
15.475
|
0.000 |
30.5198860000, 77.8464600000 |
Estimation Done |
9 |
|
|
|
Name Distance Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
16.375
|
0.000 |
30.5258310000, 77.8507180000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
16.380
|
0.000 |
30.5218110000, 77.8505740000 |
Estimation Done |
9 |
|
|
|
दुर्घटना सम्भावित क्षेत्र, धीरे चलें बोर्ड |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Informatory board |
32.100
|
0.000 |
30.5247000000, 77.9142000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
0.924
|
0.000 |
30.4453830000, 77.7428950000 |
Estimation Done |
9 |
|
|
|
1x900 mm Hume pipe, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
2.184
|
0.000 |
30.4530750000, 77.7524380000 |
Estimation Done |
9 |
|
|
|
1 mtr Span, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
2.724
|
0.000 |
30.4570820000, 77.7553810000 |
Estimation Done |
8 |
|
|
|
Irrigation Canal Babugarh, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
8.948
|
0.000 |
30.4905090000, 77.8063620000 |
Estimation Done |
9 |
|
|
|
Irrigation Calan Jeevangarh, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
9.398
|
0.000 |
30.4927750000, 77.8103090000 |
Estimation Done |
9 |
|
|
|
Irrigation Canal Panwar Market 450 mm, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
9.782
|
0.000 |
30.4952470000, 77.8125050000 |
Estimation Done |
9 |
|
|
|
Ambari Junction, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
10.895
|
0.000 |
30.5025840000, 77.8196760000 |
Estimation Done |
9 |
|
|
|
2x900 mm Hump pipe, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
11.015
|
0.000 |
30.5032680000, 77.8206860000 |
Estimation Done |
9 |
|
|
|
1x900 mm hume pipe, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
11.125
|
0.000 |
30.5040470000, 77.8213870000 |
Estimation Done |
9 |
|
|
|
1x450 Hume pipe Irrigation, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
11.205
|
0.000 |
30.5045620000, 77.8218960000 |
Estimation Done |
9 |
|
|
|
1x900 mm Hume pipe, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
11.425
|
0.000 |
30.5052580000, 77.8240740000 |
Estimation Done |
9 |
|
|
|
1x600 mm hume pipe Irrigation, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
11.985
|
0.000 |
30.5049040000, 77.8298650000 |
Estimation Done |
9 |
|
|
|
1x900 mm Hume pipe, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
12.225
|
0.000 |
30.5047540000, 77.8322960000 |
Estimation Done |
9 |
|
|
|
1x900 mm hume pipe, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
12.457
|
0.000 |
30.5046110000, 77.8345130000 |
Estimation Done |
9 |
|
|
|
1 m Span, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
12.585
|
0.000 |
30.5047620000, 77.8347180000 |
Estimation Done |
9 |
|
|
|
1 m Span, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
12.815
|
0.000 |
30.5067820000, 77.8348780000 |
Treatment in Progress |
3 |
|
|
|
1 mtr Span, Damaged |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
14.245
|
0.000 |
30.5164360000, 77.8357540000 |
Estimation Done |
9 |
|
|
|
Irriagation Canal, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
15.145
|
0.000 |
30.5181080000, 77.8447470000 |
Estimation Done |
9 |
|
|
|
1x900 mm hume pipe, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
15.945
|
0.000 |
30.5247030000, 77.8479240000 |
Estimation Done |
9 |
|
|
|
1x600 mm Hume pipe Irrigation, Good Condition |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
16.850
|
0.000 |
30.5287000000, 77.8507700000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
17.050
|
0.000 |
30.5282200000, 77.8521200000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
17.400
|
0.000 |
30.5258400000, 77.8526100000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
17.714
|
0.000 |
30.5240300000, 77.8551300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
18.360
|
0.000 |
30.5207100000, 77.8606300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
18.580
|
0.000 |
30.5203600000, 77.8622000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
18.620
|
0.000 |
30.5202000000, 77.8632900000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
19.574
|
0.000 |
30.5261000000, 77.8592700000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
19.615
|
0.000 |
30.5263500000, 77.8589700000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
19.940
|
0.000 |
30.5283700000, 77.8572800000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
20.020
|
0.000 |
30.5285700000, 77.8576100000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
21.000
|
0.000 |
30.5275300000, 77.8609600000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
23.800
|
0.000 |
30.5245900000, 77.8740100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
24.300
|
0.000 |
30.5247900000, 77.8773500000 |
Estimation Done |
10 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
24.770
|
0.000 |
30.5236800000, 77.8807600000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
25.010
|
0.000 |
30.5256900000, 77.8814300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
27.520
|
0.000 |
30.5362800000, 77.8962200000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
29.160
|
0.000 |
30.5370000000, 77.9088000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
29.310
|
0.000 |
30.5359000000, 77.9079000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
29.430
|
0.000 |
30.5348000000, 77.9076000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
34.650
|
0.000 |
30.5179000000, 77.9305000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
36.275
|
0.000 |
30.5207000000, 77.9496000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
36.625
|
0.000 |
30.5215000000, 77.9593000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
37.210
|
0.000 |
30.5192000000, 77.9565000000 |
Estimation Done |
10 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
37.400
|
0.000 |
30.5185000000, 77.9570000000 |
Estimation Done |
0 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
37.700
|
0.000 |
30.5191000000, 77.9598000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
38.100
|
0.000 |
30.5164000000, 77.9740000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
38.215
|
0.000 |
30.5181000000, 77.9645000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
38.440
|
0.000 |
30.5170000000, 77.9649000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
38.750
|
0.000 |
30.5170000000, 77.9656000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
39.050
|
0.000 |
30.5146000000, 77.9675000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
39.160
|
0.000 |
30.5140000000, 77.9678000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
39.820
|
0.000 |
30.5123000000, 77.9671000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Scupper |
40.180
|
0.000 |
30.5123000000, 77.9742000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
0.694 - 1.164
|
470.000 |
30.4436550000, 77.7409760000 |
Estimation Done |
8 |
|
|
|
PCC M-15 |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
2.204 - 2.324
|
120.000 |
30.4532790000, 77.7526620000 |
Estimation Done |
9 |
|
|
|
Lehmon Bridge Approach Start |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
2.204 - 2.324
|
120.000 |
30.4532790000, 77.7526620000 |
Estimation Done |
9 |
|
|
|
Lehmon Bridge Approach Start |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
6.468 - 6.488
|
20.000 |
30.4739090000, 77.7810460000 |
Estimation Done |
9 |
|
|
|
Rasoolpur Nala |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
7.738 - 8.588
|
850.000 |
30.4819060000, 77.7959760000 |
Estimation Done |
9 |
|
|
|
Line Jeevangarh |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
8.628 - 8.668
|
40.000 |
30.4886390000, 77.8039010000 |
Estimation Done |
9 |
|
|
|
Toward Jeevangarh |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
8.808 - 8.898
|
90.000 |
30.4894660000, 77.8052000000 |
Estimation Done |
9 |
|
|
|
Jeevangarh |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
9.168 - 9.368
|
200.000 |
30.4913350000, 77.8079280000 |
Estimation Done |
9 |
|
|
|
Toward Ambari |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
9.678 - 9.728
|
50.000 |
30.4944180000, 77.8122980000 |
Estimation Done |
9 |
|
|
|
Ambari |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
9.845 - 9.950
|
105.000 |
30.4955270000, 77.8131680000 |
Estimation Done |
9 |
|
|
|
Ambari |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
9.845 - 9.950
|
105.000 |
30.4955270000, 77.8131680000 |
Estimation Done |
9 |
|
|
|
Ambari |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
10.195 - 10.295
|
100.000 |
30.4975760000, 77.8158250000 |
Estimation Done |
9 |
|
|
|
Jalaliya |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
10.435 - 10.580
|
145.000 |
30.4997690000, 77.8168190000 |
Estimation Done |
9 |
|
|
|
Jlaliya |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
10.435 - 10.580
|
145.000 |
30.4997690000, 77.8168190000 |
Estimation Done |
9 |
|
|
|
Jlaliya |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
11.205 - 11.215
|
10.000 |
30.5045690000, 77.8219060000 |
Estimation Done |
9 |
|
|
|
Jlaliya |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
11.255 - 11.270
|
15.000 |
30.5048540000, 77.8224090000 |
Estimation Done |
9 |
|
|
|
Jlaliya |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
11.555 - 11.665
|
110.000 |
30.5054060000, 77.8254280000 |
Estimation Done |
9 |
|
|
|
Jlaliya |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
12.645 - 12.780
|
135.000 |
30.5050080000, 77.8339680000 |
Estimation Done |
9 |
|
|
|
Baadwala Shiv Temple |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
12.895 - 13.045
|
150.000 |
30.5074550000, 77.8350520000 |
Estimation Done |
9 |
|
|
|
Baadwalal |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
12.895 - 13.045
|
150.000 |
30.5074550000, 77.8350520000 |
Estimation Done |
8 |
|
|
|
Baadwalal |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
13.645 - 13.795
|
150.000 |
30.5128980000, 77.8315400000 |
Estimation Done |
9 |
|
|
|
After Yamuna Bridge |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
13.645 - 13.795
|
150.000 |
30.5128980000, 77.8315400000 |
Estimation Done |
9 |
|
|
|
After Yamuna Bridge |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
14.545 - 15.145
|
600.000 |
30.5177640000, 77.8385890000 |
Estimation Done |
9 |
|
|
|
Hairpur |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
15.245 - 15.265
|
20.000 |
30.5181290000, 77.8456670000 |
Estimation Done |
9 |
|
|
|
Kalsi |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
16.010 - 16.270
|
260.000 |
30.5173575000, 77.8370722200 |
Estimation Done |
9 |
|
|
|
Good condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
16.310 - 17.120
|
810.000 |
30.5273600000, 77.8526800000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
17.500 - 17.800
|
300.000 |
30.5251400000, 77.8537300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
17.564 - 17.680
|
116.000 |
30.5241200000, 77.8547400000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
18.620 - 18.680
|
60.000 |
30.5202700000, 77.8633300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
19.614 - 19.709
|
95.000 |
30.5422800000, 77.8573600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
20.595 - 20.730
|
135.000 |
30.5264800000, 77.8608800000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
21.250 - 21.450
|
200.000 |
30.5275300000, 77.8609600000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
21.450 - 21.575
|
125.000 |
30.5279900000, 77.8592400000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
22.400 - 22.525
|
125.000 |
30.5236800000, 77.8640200000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
25.010 - 25.144
|
134.000 |
30.5262900000, 77.8825800000 |
Estimation Done |
10 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
25.300 - 25.600
|
300.000 |
30.5273100000, 77.8840600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
27.400 - 27.732
|
332.000 |
30.5363400000, 77.8956500000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
28.030 - 28.060
|
30.000 |
30.5394800000, 77.9001900000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
28.360 - 28.410
|
50.000 |
30.5408000000, 77.9028000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
29.030 - 30.030
|
1000.000 |
30.5379000000, 77.9093000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
31.750 - 31.825
|
75.000 |
30.5188000000, 77.9166000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
32.410 - 32.510
|
100.000 |
30.5183000000, 77.9224000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
32.650 - 32.750
|
100.000 |
30.5175000000, 77.9253000000 |
Estimation Done |
10 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
33.200 - 33.290
|
90.000 |
30.5171000000, 77.9269000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
33.500 - 33.790
|
290.000 |
30.5181000000, 77.9305000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
34.600 - 34.900
|
300.000 |
30.5198000000, 77.9368000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
36.600 - 36.900
|
300.000 |
30.5208000000, 77.9510000000 |
Estimation Done |
10 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
37.850 - 37.990
|
140.000 |
30.5184000000, 77.9591000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
38.000 - 38.115
|
115.000 |
30.5185000000, 77.9602000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Parapet |
39.900 - 40.000
|
100.000 |
30.5158000000, 77.9713000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
0.000 - 0.155
|
154.500 |
30.4398140000, 77.7356240000 |
Estimation Done |
9 |
|
|
|
Herbatpur Market |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
0.000 - 2.155
|
2154.500 |
30.4398140000, 77.7356240000 |
Estimation Done |
9 |
|
|
|
Harbertpur Market |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
3.519 - 3.929
|
410.000 |
30.4619450000, 77.7611170000 |
Estimation Done |
9 |
|
|
|
Babugarh chungi |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
3.929 - 5.519
|
1589.500 |
30.4646660000, 77.7642490000 |
Estimation Done |
9 |
|
|
|
Mandi Chowk |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
3.929 - 5.710
|
1781.350 |
30.4646660000, 77.7642490000 |
Estimation Done |
9 |
|
|
|
Mandi Chowk |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
5.837 - 6.328
|
490.700 |
30.4760860000, 77.7852290000 |
Estimation Done |
8 |
|
|
|
Joint Another Drain |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
6.328 - 8.608
|
2280.000 |
30.4760860000, 77.7852290000 |
Estimation Done |
9 |
|
|
|
End at Bright Angle Junction |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
8.628 - 10.585
|
1957.400 |
30.4885410000, 77.8040820000 |
Estimation Done |
9 |
|
|
|
End at Junction Local Nala |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
8.948 - 9.108
|
160.000 |
30.4887030000, 77.8041270000 |
Estimation Done |
9 |
|
|
|
End at Jeevangarh Govt. School |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
12.695 - 12.945
|
250.000 |
30.5056050000, 77.8346630000 |
Estimation Done |
9 |
|
|
|
Baadwala Market drain |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
16.010 - 16.510
|
500.000 |
30.5280777800, 77.8519805600 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
18.000 - 21.400
|
3400.000 |
30.5269000000, 77.8532000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
24.650 - 26.920
|
2270.000 |
30.5268000000, 77.8732000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
27.050 - 28.560
|
1510.000 |
30.5292000000, 77.8860000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
28.600 - 29.890
|
1290.000 |
30.5369000000, 77.8936000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
29.930 - 30.410
|
480.000 |
30.5403000000, 77.9050000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Puccadrain |
30.500 - 32.200
|
1700.000 |
30.5403000000, 77.9050000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
0.240 - 0.370
|
130.000 |
30.4401570000, 77.7361140000 |
Estimation Done |
9 |
|
|
|
at Centre on delineator |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
1.204 - 1.209
|
5.000 |
30.4470340000, 77.7451810000 |
Estimation Done |
9 |
|
|
|
Around Peepal Tree |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
2.214 - 2.334
|
120.000 |
30.4538270000, 77.7530840000 |
Estimation Done |
9 |
|
|
|
Approach Lehmon Bridge |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
2.214 - 2.334
|
120.000 |
30.4538270000, 77.7530840000 |
Estimation Done |
9 |
|
|
|
Approach Lehmon Bridge |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
3.519 - 3.929
|
410.000 |
30.4619960000, 77.7612220000 |
Estimation Done |
9 |
|
|
|
At Centre on Divider |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
5.572 - 5.710
|
138.400 |
30.4726890000, 77.7785060000 |
Estimation Done |
9 |
|
|
|
at centre on divider |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
8.588 - 8.628
|
40.000 |
30.4882850000, 77.8036890000 |
Estimation Done |
9 |
|
|
|
Bright Angle Junction |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
8.588 - 8.628
|
40.000 |
30.4882850000, 77.8036890000 |
Estimation Done |
9 |
|
|
|
Bright Angle Junction |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
9.158 - 9.717
|
558.700 |
30.4942960000, 77.8122740000 |
Estimation Done |
9 |
|
|
|
Ambari Junction |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
9.658 - 10.217
|
558.700 |
30.4942960000, 77.8122740000 |
Estimation Done |
9 |
|
|
|
Ambari Junction |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
11.585 - 11.665
|
80.000 |
30.5054060000, 77.8254280000 |
Estimation Done |
9 |
|
|
|
Jalaliya Irrigation Canal |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
12.370 - 12.450
|
80.000 |
30.5050080000, 77.8339680000 |
Estimation Done |
9 |
|
|
|
Shiv Temple Baadwala |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
12.370 - 12.450
|
80.000 |
30.5050080000, 77.8339680000 |
Estimation Done |
9 |
|
|
|
Shiv Temple Baadwala |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
12.895 - 13.145
|
250.000 |
30.5074550000, 77.8350520000 |
Estimation Done |
9 |
|
|
|
Baadwala |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
12.895 - 13.145
|
250.000 |
30.5074550000, 77.8350520000 |
Estimation Done |
9 |
|
|
|
Baadwala |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
13.645 - 13.795
|
150.000 |
30.5128980000, 77.8315400000 |
Estimation Done |
9 |
|
|
|
After Yamuna Bridge |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
13.648 - 13.798
|
150.000 |
30.5128980000, 77.8315400000 |
Estimation Done |
9 |
|
|
|
After Yamuna Bridge |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
16.010 - 16.270
|
260.000 |
30.5280000000, 77.8519000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
16.145 - 16.245
|
100.000 |
30.5258920000, 77.8492810000 |
Estimation Done |
9 |
|
|
|
DFO office Kalsi |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
16.145 - 16.245
|
100.000 |
30.5258920000, 77.8492810000 |
Estimation Done |
9 |
|
|
|
DFO office Kalsi |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
24.000 - 31.000
|
7000.000 |
30.5240000000, 77.8750000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Delimetor |
32.200 - 32.450
|
250.000 |
30.5248000000, 77.9145000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Dec 2024 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Black spot |
2.144 - 2.174
|
30.000 |
30.4530750000, 77.7524380000 |
Treated |
5 |
|
|
|
Lehman Junction |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Black spot |
8.598 - 8.638
|
40.000 |
30.4886780000, 77.8040380000 |
Treated |
6 |
|
|
|
Bright Angle Junction |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Black spot |
9.792 - 9.835
|
43.000 |
30.4954640000, 77.8125960000 |
Treated |
9 |
|
|
|
Ambari Junction |
Jan 2025 |
[9]
Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway
|
Black spot |
12.485 - 12.535
|
50.000 |
30.5044070000, 77.8350290000 |
Treated |
9 |
|
|
|
Baadwala H.P. Bend Junction |
Jan 2025 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
15.200 - 15.216
|
16.000 |
29.6373330000, 77.9850000000 |
Estimation Done |
9 |
|
|
|
RCC Box Culvert 2X2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
15.400 - 15.417
|
17.000 |
29.6375830000, 77.9871670000 |
Estimation Done |
8 |
|
|
|
RCC Box Culvert 4X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
15.600 - 15.615
|
15.000 |
29.6381940000, 77.9907780000 |
Estimation Done |
9 |
|
|
|
RCC Box Culvert 6X3 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
16.400 - 16.416
|
16.000 |
29.6385280000, 77.9971670000 |
Estimation Done |
8 |
|
|
|
RCC Box Culvert 3X3 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
16.650 - 16.666
|
16.000 |
29.6395830000, 77.9989170000 |
Estimation Done |
9 |
|
|
|
Hume Pipe 450 mm |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
17.700 - 17.716
|
16.000 |
29.6462500000, 78.0068060000 |
Estimation Done |
7 |
|
|
|
RCC Box Culvert 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
17.880 - 17.896
|
16.000 |
29.6485560000, 78.0072780000 |
Estimation Done |
9 |
|
|
|
RCC Box Culvert 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
17.990 - 18.006
|
16.000 |
29.6485560000, 78.0070830000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
18.870 - 18.886
|
16.000 |
29.6553890000, 78.0024440000 |
Estimation Done |
8 |
|
|
|
Hume Pipe 100 mm P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
18.920 - 18.936
|
16.000 |
29.6557220000, 78.0021110000 |
Estimation Done |
9 |
|
|
|
Hume Pipe 1200 mm P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
19.690 - 19.706
|
16.000 |
29.6613060000, 77.9986670000 |
Estimation Done |
10 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
20.230 - 20.246
|
16.000 |
29.6653890000, 77.9957500000 |
Estimation Done |
9 |
|
|
|
Brick 5X3 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
20.740 - 20.756
|
16.000 |
29.6694440000, 77.9936670000 |
Estimation Done |
9 |
|
|
|
Brick 4X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
21.170 - 21.186
|
16.000 |
29.6733060000, 77.9925280000 |
Estimation Done |
9 |
|
|
|
Brick 3X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
21.740 - 21.756
|
16.000 |
29.6781110000, 77.9909720000 |
Estimation Done |
8 |
|
|
|
Brick 1X5.0X1.50 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
21.910 - 21.926
|
16.000 |
29.6793610000, 77.9898890000 |
Estimation Done |
9 |
|
|
|
Brick 1.50X1.50 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
22.240 - 22.256
|
16.000 |
29.6821670000, 77.9891940000 |
Estimation Done |
9 |
|
|
|
Brick 2x2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
22.780 - 22.796
|
16.000 |
29.6869440000, 77.9895280000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
26.115 - 26.131
|
16.000 |
29.7127780000, 78.0000000000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
26.420 - 26.436
|
16.000 |
29.7150000000, 78.0016670000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
26.790 - 26.806
|
16.000 |
29.7175000000, 78.0041670000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
27.040 - 27.056
|
16.000 |
29.7197220000, 78.0047220000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
29.060 - 29.076
|
16.000 |
29.7363890000, 78.0119440000 |
Estimation Done |
8 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
29.170 - 29.186
|
16.000 |
29.7372220000, 78.0125000000 |
Estimation Done |
8 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
30.340 - 30.352
|
12.000 |
29.7466670000, 78.0175000000 |
Estimation Done |
8 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
31.820 - 31.832
|
12.000 |
29.7547220000, 78.0286110000 |
Estimation Done |
7 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
32.130 - 32.152
|
22.000 |
29.7558330000, 78.0400000000 |
Estimation Done |
10 |
|
|
|
RCC Box Culvert 5X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
32.970 - 32.986
|
16.000 |
29.7566670000, 78.0400000000 |
Treatment in Progress |
3 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
35.350 - 35.366
|
16.000 |
29.7608330000, 78.0594440000 |
Estimation Done |
8 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
36.160 - 36.176
|
16.000 |
29.7602780000, 78.0675000000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
36.650 - 36.666
|
16.000 |
29.7594440000, 78.0725000000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
42.100 - 42.116
|
16.000 |
29.7758330000, 78.1155560000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
44.200 - 44.216
|
16.000 |
29.7925000000, 78.1291670000 |
Estimation Done |
9 |
|
|
|
Brick 2X2 P2 |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
45.330 - 45.345
|
15.000 |
29.8013890000, 78.1356390000 |
Estimation Done |
9 |
|
|
|
Hume Pipe 1000 mm P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
46.330 - 46.346
|
16.000 |
29.8093330000, 78.1361670000 |
Estimation Done |
10 |
|
|
|
Box Culvert 2x2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
47.190 - 47.206
|
16.000 |
29.8163610000, 78.1322780000 |
Estimation Done |
9 |
|
|
|
Box Culvert 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
47.350 - 47.366
|
16.000 |
29.8177220000, 78.1315000000 |
Treatment in Progress |
9 |
|
|
|
Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
47.570 - 47.586
|
16.000 |
29.8193330000, 78.1305560000 |
Estimation Done |
9 |
|
|
|
Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
47.940 - 47.956
|
16.000 |
29.8222780000, 78.1289170000 |
Estimation Done |
9 |
|
|
|
Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
48.430 - 48.446
|
16.000 |
29.8259170000, 78.1261670000 |
Treatment in Progress |
3 |
|
|
|
Brick Masonry 1.5x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
49.920 - 49.936
|
16.000 |
29.8358330000, 78.1132220000 |
Estimation Done |
9 |
|
|
|
Brick Masonry 1.50x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
50.160 - 50.176
|
16.000 |
29.8379170000, 78.1149440000 |
Estimation Done |
9 |
|
|
|
Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
50.680 - 50.692
|
12.000 |
29.8420560000, 78.1127780000 |
Treatment in Progress |
3 |
|
|
|
Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
51.200 - 51.208
|
7.500 |
29.8551390000, 78.1148060000 |
Treatment in Progress |
3 |
|
|
|
Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
53.000 - 53.017
|
17.000 |
29.8555560000, 78.1183610000 |
Estimation Done |
9 |
|
|
|
Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
53.170 - 53.186
|
16.000 |
29.8630560000, 78.1187220000 |
Estimation Done |
9 |
|
|
|
Brick masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
53.520 - 53.536
|
16.000 |
29.8659720000, 78.1199440000 |
Estimation Done |
10 |
|
|
|
Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
54.610 - 54.622
|
12.000 |
29.8742500000, 78.1256940000 |
Estimation Done |
8 |
|
|
|
Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
55.080 - 55.090
|
10.000 |
29.8780280000, 78.1281390000 |
Estimation Done |
6 |
|
|
|
Village Jiapota Brick Masonry 2x2 P2 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
55.610 - 55.618
|
8.000 |
29.8819170000, 78.1310560000 |
Estimation Done |
9 |
|
|
|
Brick Masonry 1x1 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
55.810 - 55.824
|
14.000 |
29.8833610000, 78.1321390000 |
Estimation Done |
8 |
|
|
|
Brick Masonry |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
59.190 - 59.206
|
16.000 |
29.9111390000, 78.1341390000 |
Estimation Done |
10 |
|
|
|
Brick Masonry 1x1 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
culvert |
59.720 - 59.733
|
13.000 |
29.9149440000, 78.1356110000 |
Estimation Done |
9 |
|
|
|
Brick Masonry 1.5x1 |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
15.160
|
0.000 |
29.6372500000, 77.9846940000 |
Estimation Done |
9 |
|
|
|
Cantilever over head board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
16.100
|
0.000 |
29.6377780000, 77.9947780000 |
Estimation Done |
9 |
|
|
|
Turn Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
16.250
|
0.000 |
29.6379170000, 77.9960280000 |
Estimation Done |
0 |
|
|
|
Chevron Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
16.390
|
0.000 |
29.6385280000, 77.9969440000 |
Estimation Done |
9 |
|
|
|
Turn Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
16.860
|
0.000 |
29.6410280000, 78.0009720000 |
Estimation Done |
9 |
|
|
|
Chevron Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
18.540
|
0.000 |
29.6528610000, 78.0040830000 |
Estimation Done |
9 |
|
|
|
Chevron Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
19.870
|
0.000 |
29.6626390000, 77.9980830000 |
Estimation Done |
9 |
|
|
|
Chevron Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
20.400
|
0.000 |
29.6665830000, 77.9114720000 |
Estimation Done |
9 |
|
|
|
Chevron Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
21.590
|
0.000 |
29.6768330000, 77.9915000000 |
Estimation Done |
9 |
|
|
|
Breaker Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
21.740
|
0.000 |
29.6781670000, 77.9909440000 |
Estimation Done |
9 |
|
|
|
Turn Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
22.030
|
0.000 |
29.6803060000, 77.9893060000 |
Estimation Done |
9 |
|
|
|
Turn Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
22.350
|
0.000 |
29.6831670000, 77.9889440000 |
Estimation Done |
9 |
|
|
|
Chevron Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
22.510
|
0.000 |
29.6846390000, 77.9887780000 |
Estimation Done |
9 |
|
|
|
Turn Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
22.610
|
0.000 |
29.6854720000, 77.9889170000 |
Estimation Done |
9 |
|
|
|
Chevron Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
23.240
|
0.000 |
29.6908890000, 77.0910000000 |
Estimation Done |
8 |
|
|
|
Chevron Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
23.500
|
0.000 |
29.6929170000, 77.9908060000 |
Estimation Done |
9 |
|
|
|
Chevron Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
24.050
|
0.000 |
29.6939720000, 77.9937780000 |
Estimation Done |
9 |
|
|
|
Turn Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
24.700
|
0.000 |
29.7025000000, 77.9966670000 |
Estimation Done |
8 |
|
|
|
Speed Breaker Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
24.810
|
0.000 |
29.7033330000, 77.9963890000 |
Estimation Done |
7 |
|
|
|
Speed Breaker Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
25.060
|
0.000 |
29.7041670000, 78.0130560000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
26.930
|
0.000 |
29.7188890000, 78.0047220000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
27.270
|
0.000 |
29.7216670000, 78.0050000000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
28.470
|
0.000 |
29.7319440000, 78.0097220000 |
Estimation Done |
9 |
|
|
|
Horn Please Shine Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
28.860
|
0.000 |
29.7350000000, 78.0108330000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
58.300
|
0.000 |
29.9042220000, 78.1339170000 |
Estimation Done |
9 |
|
|
|
Go Slow Borad, Jagjeetpur |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
58.660
|
0.000 |
29.9067220000, 78.1342500000 |
Estimation Done |
7 |
|
|
|
Over Head Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
60.130
|
0.000 |
29.9180830000, 78.1384440000 |
Estimation Done |
8 |
|
|
|
Go Slow Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
60.450
|
0.000 |
29.9204720000, 78.1386110000 |
Estimation Done |
8 |
|
|
|
All Information Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
60.990
|
0.000 |
29.9246940000, 78.1365830000 |
Estimation Done |
9 |
|
|
|
Over Head Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Cautionary board |
61.480
|
0.000 |
29.9258330000, 78.1321390000 |
Estimation Done |
8 |
|
|
|
Over Head Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
16.250 - 16.310
|
60.000 |
29.6379170000, 77.9960280000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
17.990 - 18.042
|
52.000 |
29.6485830000, 78.0071940000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
19.090 - 19.138
|
48.000 |
29.6567500000, 78.0010280000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
20.700 - 20.740
|
40.000 |
29.6691390000, 77.9937780000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
20.700 - 20.740
|
40.000 |
29.6691400000, 77.9937880000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
22.560 - 22.608
|
48.000 |
29.6850560000, 77.9888060000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
23.500 - 23.840
|
340.000 |
29.6929170000, 77.8740000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
23.800 - 23.848
|
48.000 |
29.6955560000, 77.9921670000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
24.000 - 24.084
|
84.000 |
29.6963060000, 77.9931940000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
24.100 - 24.272
|
172.000 |
29.6963060000, 77.9931940000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
25.150 - 25.190
|
40.000 |
29.7047220000, 77.9961110000 |
Estimation Done |
9 |
|
|
|
Good Condtion |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
26.380 - 26.440
|
60.000 |
29.7147220000, 78.0016670000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
26.380 - 26.424
|
44.000 |
29.7147220000, 78.0016670000 |
Estimation Done |
8 |
|
|
|
Good condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
26.770 - 26.822
|
52.000 |
29.7175000000, 78.0038890000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
26.770 - 26.842
|
72.000 |
29.7175000000, 78.0038890000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
26.890 - 26.902
|
12.000 |
29.7183330000, 78.0044440000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
27.040 - 27.088
|
48.000 |
29.7197220000, 78.0047220000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
27.040 - 27.104
|
64.000 |
29.7197220000, 78.0047220000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
28.830 - 28.866
|
36.000 |
29.7347220000, 78.0105560000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
28.930 - 28.958
|
28.000 |
29.7352780000, 78.0113890000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
33.530 - 33.694
|
164.000 |
29.7352780000, 78.0113890000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
33.530 - 33.682
|
152.000 |
29.7352780000, 78.0113890000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
33.830 - 34.000
|
170.000 |
29.7552780000, 78.0480560000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
34.020 - 34.312
|
292.000 |
29.7541670000, 78.0500000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
35.280 - 35.328
|
48.000 |
29.7608330000, 78.0588890000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
35.280 - 35.334
|
54.000 |
29.7608330000, 78.0588890000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
35.360 - 35.412
|
52.000 |
29.7608330000, 78.0594440000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
37.860 - 37.944
|
84.000 |
29.7244440000, 78.0847220000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
37.860 - 38.144
|
284.000 |
29.7244440000, 78.0847220000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
38.130 - 38.252
|
122.000 |
29.7575000000, 78.0875000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
41.650 - 41.702
|
52.000 |
29.7727780000, 78.1116670000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
43.560 - 43.744
|
184.000 |
29.7863890000, 78.1227780000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
46.300 - 46.340
|
40.000 |
29.1424170000, 78.1362780000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
46.300 - 46.340
|
40.000 |
29.1424170000, 78.1362780000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
47.120 - 47.168
|
48.000 |
29.8157780000, 78.1325830000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
47.120 - 47.168
|
48.000 |
29.8157780000, 78.1325830000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Crash barrier |
48.190 - 48.398
|
208.000 |
29.1643610000, 78.1208890000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
17.170
|
0.000 |
29.6428610000, 78.0028610000 |
Estimation Done |
9 |
|
|
|
Village board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
17.440
|
0.000 |
29.6446390000, 78.0049170000 |
Estimation Done |
8 |
|
|
|
Village board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
17.500
|
0.000 |
29.6450280000, 78.0053060000 |
Estimation Done |
9 |
|
|
|
Speed Limit board 2 No. |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
18.400
|
0.000 |
29.6518330000, 78.0047500000 |
Estimation Done |
9 |
|
|
|
Petrol Pump Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
19.840
|
0.000 |
29.6627500000, 77.9983060000 |
Estimation Done |
8 |
|
|
|
Hospital & Public School Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
23.480
|
0.000 |
29.6929170000, 77.9908060000 |
Estimation Done |
9 |
|
|
|
Village Name Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
24.320
|
0.000 |
29.6994440000, 77.9955560000 |
Estimation Done |
9 |
|
|
|
Village Name Board 2 No. |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
24.700
|
0.000 |
29.7025000000, 77.9133330000 |
Estimation Done |
10 |
|
|
|
Hospital Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
25.000
|
0.000 |
29.7033330000, 77.9963890000 |
Estimation Done |
8 |
|
|
|
Hospital & Police All Information Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
26.790
|
0.000 |
29.7183330000, 78.0044440000 |
Estimation Done |
8 |
|
|
|
Petrol Pump Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
27.810
|
0.000 |
29.7255560000, 78.0063890000 |
Estimation Done |
9 |
|
|
|
Petrol Pump Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
28.080
|
0.000 |
29.7286110000, 78.0075000000 |
Estimation Done |
9 |
|
|
|
Petrol Pump Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
28.350
|
0.000 |
29.7308330000, 78.0086110000 |
Estimation Done |
9 |
|
|
|
School Shine Board 2 No. |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
28.520
|
0.000 |
29.7319440000, 78.0097220000 |
Estimation Done |
8 |
|
|
|
Hospital Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
28.590
|
0.000 |
29.7494440000, 78.0097220000 |
Estimation Done |
7 |
|
|
|
Village Board Dabki Kala |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
28.950
|
0.000 |
29.7355560000, 78.0116670000 |
Estimation Done |
7 |
|
|
|
Village Board Dabki Kala |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
29.400
|
0.000 |
29.7563890000, 78.1005560000 |
Estimation Done |
9 |
|
|
|
Over Head Signe Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
30.000
|
0.000 |
29.7441670000, 78.0155560000 |
Estimation Done |
8 |
|
|
|
Village Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
30.150
|
0.000 |
29.7455560000, 78.0163890000 |
Estimation Done |
8 |
|
|
|
School & Laksar village Board 2 No. |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
32.650
|
0.000 |
29.7566670000, 79.0363890000 |
Estimation Done |
8 |
|
|
|
Petrol Pump Board 2 Nos. |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
34.000
|
0.000 |
29.7541670000, 78.0500000000 |
Estimation Done |
9 |
|
|
|
Pipli Village Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
34.380
|
0.000 |
29.7555560000, 78.0525000000 |
Estimation Done |
9 |
|
|
|
Akbarpur Village Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
34.570
|
0.000 |
29.7572220000, 78.0530560000 |
Estimation Done |
9 |
|
|
|
School Sign Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
34.590
|
0.000 |
29.7591670000, 78.0555560000 |
Estimation Done |
9 |
|
|
|
School Signe Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
34.680
|
0.000 |
29.7583330000, 78.0536110000 |
Estimation Done |
9 |
|
|
|
School Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
34.760
|
0.000 |
29.7583330000, 78.0541670000 |
Estimation Done |
9 |
|
|
|
Petrol Pump Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
34.840
|
0.000 |
29.7588890000, 78.0547220000 |
Estimation Done |
9 |
|
|
|
School Signe Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
36.310
|
0.000 |
29.7602780000, 78.0691670000 |
Estimation Done |
9 |
|
|
|
Petrol Pump Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
37.550
|
0.000 |
29.7561110000, 78.1019440000 |
Estimation Done |
9 |
|
|
|
Village Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
40.330
|
0.000 |
29.7625000000, 78.1066670000 |
Estimation Done |
9 |
|
|
|
All Information Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
43.480
|
0.000 |
29.7858330000, 78.1225000000 |
Estimation Done |
9 |
|
|
|
Village Board Sherpur |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
43.720
|
0.000 |
29.7875000000, 78.1238890000 |
Estimation Done |
9 |
|
|
|
School Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
43.810
|
0.000 |
29.7880560000, 78.1247220000 |
Estimation Done |
9 |
|
|
|
School Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
44.140
|
0.000 |
29.7922220000, 78.1291670000 |
Estimation Done |
9 |
|
|
|
Junction T Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
44.850
|
0.000 |
29.7977780000, 78.1330560000 |
Estimation Done |
9 |
|
|
|
School Board 2 No. |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
45.000
|
0.000 |
29.7986110000, 78.1338890000 |
Estimation Done |
9 |
|
|
|
All Information Board |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
45.490
|
0.000 |
29.8026390000, 78.1366110000 |
Estimation Done |
8 |
|
|
|
Over Head cantilever Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
45.810
|
0.000 |
29.8051670000, 78.1383060000 |
Estimation Done |
9 |
|
|
|
School Signe Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
45.880
|
0.000 |
29.8056390000, 78.1381390000 |
Estimation Done |
9 |
|
|
|
Rumble Strip Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
46.070
|
0.000 |
29.8120560000, 78.1347220000 |
Estimation Done |
9 |
|
|
|
Speed Limit Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
48.150
|
0.000 |
29.8241110000, 78.1278060000 |
Estimation Done |
8 |
|
|
|
Left Turn/Right Turn 2 No.Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
48.470
|
0.000 |
29.8264170000, 78.1257810000 |
Estimation Done |
9 |
|
|
|
Petrol Pump Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
48.740
|
0.000 |
29.8281110000, 78.1240000000 |
Estimation Done |
9 |
|
|
|
Hospital Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
48.900
|
0.000 |
29.8285560000, 78.1229440000 |
Estimation Done |
8 |
|
|
|
Breaker Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
50.790
|
0.000 |
29.8429720000, 78.1122220000 |
Estimation Done |
8 |
|
|
|
Dhanpura Village Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
51.130
|
0.000 |
29.8459720000, 78.1120830000 |
Estimation Done |
10 |
|
|
|
Right Turn Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
51.860
|
0.000 |
29.8334440000, 78.1133060000 |
Estimation Done |
9 |
|
|
|
Petrol Pump + Right Turn Board 2 No. |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
52.090
|
0.000 |
29.8543330000, 78.1141110000 |
Estimation Done |
9 |
|
|
|
T- Point Over Head Signe Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
52.520
|
0.000 |
29.8575280000, 78.1166360000 |
Estimation Done |
9 |
|
|
|
T-Point Junction Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
52.940
|
0.000 |
29.8611110000, 78.1180560000 |
Estimation Done |
8 |
|
|
|
Petrol Pump |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
54.130
|
0.000 |
29.8704170000, 78.1237220000 |
Estimation Done |
9 |
|
|
|
School Shine Board 2 No. |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
54.700
|
0.000 |
29.8755560000, 78.1266670000 |
Estimation Done |
9 |
|
|
|
Hospital Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
55.000
|
0.000 |
29.8778060000, 78.1278060000 |
Estimation Done |
8 |
|
|
|
Junction Village Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
55.470
|
0.000 |
29.8810280000, 78.1299720000 |
Estimation Done |
9 |
|
|
|
Speed Breaker, Junction Board 2 No. |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
55.550
|
0.000 |
29.8814720000, 78.1305560000 |
Estimation Done |
8 |
|
|
|
Speed Breaker Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
55.710
|
0.000 |
29.8828060000, 78.1316940000 |
Estimation Done |
9 |
|
|
|
Village Panjanhedi Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
56.000
|
0.000 |
29.8844170000, 78.1337500000 |
Estimation Done |
9 |
|
|
|
Left Turn Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
56.120
|
0.000 |
29.8853060000, 78.1345280000 |
Estimation Done |
9 |
|
|
|
Noorpur Village Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Informatory board |
56.230
|
0.000 |
29.8864720000, 78.1347220000 |
Estimation Done |
0 |
|
|
|
School Board |
Oct 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Puccadrain |
51.200 - 52.200
|
1000.000 |
29.8551390000, 78.1148060000 |
Estimation Done |
8 |
|
|
|
Pucca Drain 1000 M Length |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Puccadrain |
59.850 - 60.030
|
180.000 |
29.9157780000, 78.1366670000 |
Estimation Done |
9 |
|
|
|
Pucca Drain 150 M Brick Masonry |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Puccadrain |
60.750 - 61.010
|
260.000 |
29.9209720000, 78.1375830000 |
Estimation Done |
9 |
|
|
|
Pucca Drain 260 M Brick Masonry |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Puccadrain |
61.200 - 61.400
|
200.000 |
29.9253330000, 78.1347220000 |
Estimation Done |
9 |
|
|
|
Pucca Drain 200 M Brick Masonry |
Sep 2024 |
[15]
Purkazi Laksar Haridwar national highway
|
Puccadrain |
61.200 - 61.400
|
200.000 |
29.9253330000, 78.1347220000 |
Estimation Done |
9 |
|
|
|
Pucca Drain 200 M Brick Masonry |
Sep 2024 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
196.290 - 196.292
|
2.000 |
30.4153800000, 78.2598200000 |
Estimation Done |
8 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
198.000 - 198.002
|
2.000 |
30.4164900000, 78.2728800000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
198.100 - 198.102
|
2.000 |
30.4165000000, 78.2738600000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
198.507 - 198.509
|
2.000 |
30.4144500000, 78.2781300000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
198.540 - 198.542
|
2.000 |
30.4149300000, 78.2774200000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
199.360 - 199.362
|
2.000 |
30.4139800000, 78.2933200000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
199.850 - 199.852
|
2.000 |
30.4100400000, 78.2849000000 |
Estimation Done |
8 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
201.000 - 201.002
|
2.000 |
30.4066200000, 78.2920000000 |
Estimation Done |
8 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
202.250 - 202.252
|
2.000 |
30.4114200000, 78.2957700000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
202.950 - 202.952
|
2.000 |
30.4151600000, 78.2969500000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
205.900 - 205.902
|
2.000 |
30.4174500000, 78.3211300000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
212.000 - 212.002
|
2.000 |
30.4000300000, 78.3550900000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
culvert |
212.420 - 212.422
|
2.000 |
30.4004400000, 78.3576300000 |
Estimation Done |
9 |
|
|
|
2 Span Culvert |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Cause way |
189.650 - 189.662
|
12.000 |
30.4361700000, 78.2237400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Cautionary board |
176.000
|
0.000 |
30.4519300000, 78.1311400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Cautionary board |
176.220
|
0.000 |
30.4506900000, 78.1325900000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Cautionary board |
176.450
|
0.000 |
30.4504500000, 78.1345800000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Cautionary board |
179.500
|
0.000 |
30.4507400000, 78.1574600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Cautionary board |
185.100
|
0.000 |
30.4415200000, 78.1883800000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Cautionary board |
186.550
|
0.000 |
30.4451000000, 78.2036200000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
176.125 - 177.250
|
1125.000 |
30.4519300000, 78.1391400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
178.250 - 178.475
|
225.000 |
30.4520600000, 78.1552600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
179.150 - 179.175
|
25.000 |
30.4495000000, 78.1559300000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
179.850 - 179.875
|
25.000 |
30.4500200000, 78.1583600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
180.250 - 180.270
|
20.000 |
30.4459000000, 78.1616200000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
180.750 - 180.766
|
16.000 |
30.4434400000, 78.1692100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
182.300 - 182.324
|
24.000 |
30.4439400000, 78.1804200000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
184.500 - 184.518
|
18.000 |
30.4465400000, 78.1922700000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
185.050 - 185.060
|
10.000 |
30.4434300000, 78.1958100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
185.475 - 185.493
|
18.000 |
30.4457500000, 78.2001600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
186.325 - 186.341
|
16.000 |
30.4451000000, 78.2001600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
186.925 - 186.945
|
20.000 |
30.4433600000, 78.2042900000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
187.475 - 187.499
|
24.000 |
30.4420000000, 78.2100400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
188.200 - 188.220
|
20.000 |
30.4425300000, 78.2183700000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
188.350 - 188.374
|
24.000 |
30.4413700000, 78.2146100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
192.330 - 192.350
|
20.000 |
30.4286800000, 78.2313100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
193.440 - 193.915
|
475.000 |
30.4183900000, 78.2624400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
198.740 - 199.240
|
500.000 |
30.4133700000, 78.2842800000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Crash barrier |
200.100 - 201.275
|
1175.000 |
30.4184400000, 78.3354300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
176.125
|
0.000 |
30.4510900000, 78.1391400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
176.275
|
0.000 |
30.4510700000, 78.1303800000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
176.500
|
0.000 |
30.4521600000, 78.1395800000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
176.575
|
0.000 |
30.4495600000, 78.1437400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
178.580
|
0.000 |
30.4497100000, 78.1439100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
179.000
|
0.000 |
30.4527400000, 78.1470400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
179.325
|
0.000 |
30.4534700000, 78.1482000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
179.540
|
0.000 |
30.4520600000, 78.1535400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
180.000
|
0.000 |
30.2655648000, 78.0332925000 |
Identified |
0 |
|
|
|
|
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
180.075
|
0.000 |
30.4509300000, 78.1550400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
180.100
|
0.000 |
30.4517800000, 78.1536400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
180.750
|
0.000 |
30.4437900000, 78.1717400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
182.200
|
0.000 |
30.4045000000, 78.1862100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
186.325
|
0.000 |
30.4451000000, 78.2001600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
186.550
|
0.000 |
30.4445600000, 78.2036200000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
189.200
|
0.000 |
30.4386800000, 78.2223400000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
192.330
|
0.000 |
30.4286800000, 78.2313100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
192.660
|
0.000 |
30.4290300000, 78.2348200000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
193.440
|
0.000 |
30.4283900000, 78.2404700000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
211.150
|
0.000 |
30.4054600000, 78.3510400000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
212.420
|
0.000 |
30.4004400000, 78.3576300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
213.380
|
0.000 |
30.3990300000, 78.3630100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
224.690
|
0.000 |
30.3426500000, 78.4017600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
225.600
|
0.000 |
30.3377100000, 78.4032900000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
229.305
|
0.000 |
30.3550700000, 78.4191300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
229.540
|
0.000 |
30.3562600000, 78.4207100000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
230.920
|
0.000 |
30.3583000000, 78.4291300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
231.840
|
0.000 |
30.3331000000, 78.4281300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
231.940
|
0.000 |
30.3640800000, 78.4296300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
232.580
|
0.000 |
30.3667300000, 78.4290500000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
232.810
|
0.000 |
30.3672400000, 78.4275200000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Informatory board |
232.950
|
0.000 |
30.3682400000, 78.4266600000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
177.275
|
0.000 |
30.4533800000, 78.4778000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
177.325
|
0.000 |
30.4534700000, 78.1482000000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
177.575
|
0.000 |
30.4541500000, 78.1493800000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
178.100
|
0.000 |
30.4511100000, 78.1545000000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
178.750
|
0.000 |
30.4495000000, 78.1559300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
179.150
|
0.000 |
30.4495000000, 78.1559300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
179.400
|
0.000 |
30.4515300000, 78.1553800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Hume Pipe |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
180.250
|
0.000 |
30.4459000000, 78.1616200000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
180.750
|
0.000 |
30.4437900000, 78.1717400000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
180.900
|
0.000 |
30.4452200000, 78.1729600000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
180.950
|
0.000 |
30.4452600000, 78.1726000000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
180.980
|
0.000 |
30.4456400000, 78.1761500000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
181.200
|
0.000 |
30.4455400000, 78.1774600000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
181.350
|
0.000 |
30.4462000000, 78.1782200000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
181.950
|
0.000 |
30.4495000000, 78.1796800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
182.300
|
0.000 |
30.4439400000, 78.1804200000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
182.500
|
0.000 |
30.4443600000, 78.1808000000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
182.550
|
0.000 |
30.4446900000, 78.1840600000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
182.650
|
0.000 |
30.4445000000, 78.1862100000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
183.890
|
0.000 |
30.4442000000, 78.1866800000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
183.940
|
0.000 |
30.4430900000, 78.1873900000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
184.100
|
0.000 |
30.4415200000, 78.1883800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
184.275
|
0.000 |
30.4457500000, 78.1893900000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
184.500
|
0.000 |
30.4463400000, 78.1925400000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
184.975
|
0.000 |
30.4427200000, 78.1944700000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
185.050
|
0.000 |
30.4434300000, 78.1958100000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
185.475
|
0.000 |
30.4457500000, 78.1956300000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
186.125
|
0.000 |
30.4458400000, 78.1988800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
186.325
|
0.000 |
30.4451000000, 78.2001600000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
186.925
|
0.000 |
30.4433600000, 78.2042900000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
187.475
|
0.000 |
30.4420000000, 78.2100400000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
188.200
|
0.000 |
30.4425300000, 78.2138700000 |
Estimation Done |
9 |
|
|
|
Good condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
188.350
|
0.000 |
30.4413700000, 78.2146100000 |
Estimation Done |
8 |
|
|
|
Good condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
188.400
|
0.000 |
30.4411600000, 78.2105700000 |
Estimation Done |
8 |
|
|
|
Good condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
188.725
|
0.000 |
30.4305700000, 78.2184800000 |
Estimation Done |
9 |
|
|
|
Good condition |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
189.050
|
0.000 |
30.4382400000, 78.2209200000 |
Estimation Done |
8 |
|
|
|
Good condition, Hume pipe |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
189.220
|
0.000 |
30.4386800000, 78.2223400000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
189.900
|
0.000 |
30.4350800000, 78.2261100000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
190.025
|
0.000 |
30.4360500000, 78.2286200000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
190.500
|
0.000 |
30.4440900000, 78.2288100000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
190.650
|
0.000 |
30.4331300000, 78.2275800000 |
Estimation Done |
9 |
|
|
|
Good condition, Hume pipe |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
192.350
|
0.000 |
30.4286200000, 78.2322400000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
193.440
|
0.000 |
30.4283900000, 78.2404700000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
193.570
|
0.000 |
30.4280800000, 78.2425800000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
194.155
|
0.000 |
30.4267200000, 78.4443300000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
194.850
|
0.000 |
30.4212800000, 78.2510800000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
195.200
|
0.000 |
30.4202700000, 78.2532700000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
195.340
|
0.000 |
30.4196100000, 78.2547400000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
195.600
|
0.000 |
30.4196600000, 78.2573100000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
195.970
|
0.000 |
30.4182000000, 78.2584200000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
197.500
|
0.000 |
30.4137300000, 78.2701100000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
197.550
|
0.000 |
30.4139500000, 78.2710100000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
198.740
|
0.000 |
30.4133700000, 78.2780800000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
199.150
|
0.000 |
30.4136700000, 78.2811700000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
199.300
|
0.000 |
30.4142300000, 78.2926000000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
199.560
|
0.000 |
30.4122000000, 78.2840800000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
200.100
|
0.000 |
30.4184400000, 78.2859700000 |
Estimation Done |
9 |
|
|
|
Good condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
201.100
|
0.000 |
30.4066800000, 78.2940800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
201.380
|
0.000 |
30.4075100000, 78.2950700000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
202.060
|
0.000 |
30.4094400000, 78.2964900000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
202.320
|
0.000 |
30.4125300000, 78.2969300000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
203.150
|
0.000 |
30.4175000000, 78.2973000000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
203.310
|
0.000 |
30.4186400000, 78.2977900000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
204.260
|
0.000 |
30.4199500000, 78.3054600000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
204.300
|
0.000 |
30.4203700000, 78.3077400000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
204.720
|
0.000 |
30.4203600000, 78.3106900000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
205.350
|
0.000 |
30.4188200000, 78.3154000000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
206.600
|
0.000 |
30.4166500000, 78.3233800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
207.760
|
0.000 |
30.4198400000, 78.3319800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
208.120
|
0.000 |
30.4183700000, 78.3354300000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
209.300
|
0.000 |
30.4173400000, 78.3421400000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
211.080
|
0.000 |
30.4058800000, 78.3499900000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
211.150
|
0.000 |
30.4054600000, 78.3510400000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
212.380
|
0.000 |
30.3996000000, 78.3561900000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
212.410
|
0.000 |
30.4002700000, 78.3570600000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
212.740
|
0.000 |
30.3996200000, 78.3582700000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
212.950
|
0.000 |
30.4007800000, 78.3601800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
213.380
|
0.000 |
30.3990300000, 78.3630100000 |
Estimation Done |
6 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
213.460
|
0.000 |
30.3992000000, 78.3638300000 |
Estimation Done |
7 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
213.840
|
0.000 |
30.3951000000, 78.3660900000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
214.350
|
0.000 |
30.3908100000, 78.3676000000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
214.530
|
0.000 |
30.3889500000, 78.3676700000 |
Estimation Done |
10 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
214.600
|
0.000 |
30.3880400000, 78.3668500000 |
Estimation Done |
6 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
214.775
|
0.000 |
30.3872900000, 78.3670300000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
214.795
|
0.000 |
30.3867800000, 78.3666000000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
214.825
|
0.000 |
30.3859500000, 78.3660100000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
215.270
|
0.000 |
30.3842900000, 78.3659000000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
215.380
|
0.000 |
30.3837500000, 78.3663000000 |
Estimation Done |
7 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
215.440
|
0.000 |
30.3820500000, 78.3663000000 |
Estimation Done |
10 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
215.490
|
0.000 |
30.3831900000, 78.3664000000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
215.520
|
0.000 |
30.3810300000, 78.3655000000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
216.450
|
0.000 |
30.3784700000, 78.3693100000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
217.275
|
0.000 |
30.3732200000, 78.3735300000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
217.300
|
0.000 |
30.3724100000, 78.3735600000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
217.575
|
0.000 |
30.3709700000, 78.3731700000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
217.595
|
0.000 |
30.3695300000, 78.3714100000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
217.610
|
0.000 |
30.3693100000, 78.3708000000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Mar 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
218.500
|
0.000 |
30.3671900000, 78.3699200000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
218.525
|
0.000 |
30.3666800000, 78.3710700000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
220.900
|
0.000 |
30.3595500000, 78.3870800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
221.100
|
0.000 |
30.3573500000, 78.3868100000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
221.140
|
0.000 |
30.3564700000, 78.3864700000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
221.170
|
0.000 |
30.3587100000, 78.3864600000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
223.593
|
0.000 |
30.3427200000, 78.3967500000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
224.300
|
0.000 |
30.3420200000, 78.4009600000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
224.550
|
0.000 |
30.3428600000, 78.4014900000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
224.690
|
0.000 |
30.3426500000, 78.4017600000 |
Estimation Done |
7 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
225.500
|
0.000 |
30.3383600000, 78.4031600000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
225.600
|
0.000 |
30.3377100000, 78.4032900000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
226.000
|
0.000 |
30.3396600000, 78.4048200000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
226.250
|
0.000 |
30.3407400000, 78.4061900000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
226.850
|
0.000 |
30.3427400000, 78.4105300000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
227.010
|
0.000 |
30.3433100000, 78.4117800000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
227.460
|
0.000 |
30.3449300000, 78.4098500000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
227.960
|
0.000 |
30.3454400000, 78.4134100000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
228.020
|
0.000 |
30.3493800000, 78.4152400000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
228.127
|
0.000 |
30.3467800000, 78.4140800000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
228.260
|
0.000 |
30.3475100000, 78.4145700000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
228.275
|
0.000 |
30.3481500000, 78.4147800000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
228.690
|
0.000 |
30.3506600000, 78.4161000000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
228.950
|
0.000 |
30.3524500000, 78.4171400000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
229.210
|
0.000 |
30.3544000000, 78.4187300000 |
Estimation Done |
7 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
229.305
|
0.000 |
30.3550700000, 78.4191300000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
229.540
|
0.000 |
30.3562600000, 78.4207100000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
229.625
|
0.000 |
30.3504300000, 78.4213000000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
229.635
|
0.000 |
30.3567300000, 78.4215400000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
229.816
|
0.000 |
30.3563800000, 78.4225200000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
229.850
|
0.000 |
30.3562900000, 78.4231200000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
229.950
|
0.000 |
30.3665000000, 78.4239200000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
230.100
|
0.000 |
30.3568500000, 78.4250600000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
230.200
|
0.000 |
30.3567400000, 78.4257000000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
230.250
|
0.000 |
30.3566600000, 78.4266000000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
230.550
|
0.000 |
30.3567600000, 78.4289700000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
230.700
|
0.000 |
30.3571200000, 78.4301500000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
230.920
|
0.000 |
30.3583000000, 78.4291300000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
230.940
|
0.000 |
30.3583100000, 78.4296500000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
231.200
|
0.000 |
30.3593000000, 78.4267200000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
231.840
|
0.000 |
30.3331000000, 78.4281300000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
231.940
|
0.000 |
30.3640800000, 78.4267200000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
232.580
|
0.000 |
30.3667300000, 78.4290500000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
232.710
|
0.000 |
30.3670200000, 78.4285400000 |
Estimation Done |
7 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
232.810
|
0.000 |
30.3672400000, 78.4275200000 |
Estimation Done |
9 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[19]
Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway
|
Scupper |
232.950
|
0.000 |
30.3682400000, 78.4266600000 |
Estimation Done |
8 |
|
|
|
Good Condition, Scupper |
Apr 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.010
|
0.000 |
30.2627321000, 77.9821243000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.030
|
0.000 |
30.2627344000, 77.9822039000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.100
|
0.000 |
30.2631311000, 77.9818949000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.150
|
0.000 |
30.2643273000, 77.9836531000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.350
|
0.000 |
30.2656867000, 77.9836473000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.650
|
0.000 |
30.2675183000, 77.9847783300 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.660
|
0.000 |
30.2675300000, 77.9848783300 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.670
|
0.000 |
30.2676213000, 77.9849459000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.800
|
0.000 |
30.2684952000, 77.9854778000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.850
|
0.000 |
30.2688444000, 77.9854397000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.860
|
0.000 |
30.2689206000, 77.9860038000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.870
|
0.000 |
30.2689710000, 77.9861180000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
37.950
|
0.000 |
30.2695951000, 77.9864278000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.100
|
0.000 |
30.2706363000, 77.9867077000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.200
|
0.000 |
30.2707360000, 77.9868544000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.500
|
0.000 |
30.2746375000, 77.9886886000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.530
|
0.000 |
30.2743033000, 77.9887300000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.540
|
0.000 |
30.2749737000, 77.9887982000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.570
|
0.000 |
30.2752116600, 77.9887383000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.600
|
0.000 |
30.2753236000, 77.9894588000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.900
|
0.000 |
30.2773212000, 77.9892453000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.905
|
0.000 |
30.2774866600, 77.9893649990 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
38.910
|
0.000 |
30.2779757000, 77.9899355000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
39.000
|
0.000 |
30.2786304000, 77.9903246000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
39.350
|
0.000 |
30.2801795000, 77.9917923000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
39.450
|
0.000 |
30.2811326000, 77.9916347000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
39.460
|
0.000 |
30.2811733300, 77.9916550000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
39.600
|
0.000 |
30.2816876000, 77.9921280000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
39.650
|
0.000 |
30.2812286000, 77.9916047000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
39.780
|
0.000 |
30.2838364000, 77.9932974000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Cautionary board |
40.000
|
0.000 |
30.2860449990, 77.9955816660 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
37.040
|
0.000 |
30.2626083330, 77.9818933000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
37.080
|
0.000 |
30.2627356000, 77.9823978000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
37.100
|
0.000 |
30.2631311000, 77.9818949000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
37.500
|
0.000 |
30.2666170000, 77.9842503000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
37.850
|
0.000 |
30.2688440000, 77.9854397000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
38.560
|
0.000 |
30.2748133300, 77.9887750000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
38.800
|
0.000 |
30.2772066000, 77.9894275000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
39.150
|
0.000 |
30.2794365000, 77.9911174000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
39.600
|
0.000 |
30.2827120000, 77.9925105000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
39.700
|
0.000 |
30.2828512000, 77.9924563000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
39.710
|
0.000 |
30.2832109000, 77.9927453000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
39.730
|
0.000 |
30.2832266600, 77.9934133000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
39.990
|
0.000 |
30.2861677000, 77.9958840000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
40.050
|
0.000 |
30.2866699000, 77.9957516000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
40.250
|
0.000 |
30.2882795000, 77.9966113000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Informatory board |
40.400
|
0.000 |
30.2886134000, 77.9968080000 |
Estimation Done |
8 |
|
|
|
Good Condition |
Feb 2025 |
[3]
Chutmalpur Dehradun national highway
|
Puccadrain |
37.150 - 39.060
|
1910.000 |
30.2627337000, 77.9821269000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[3]
Chutmalpur Dehradun national highway
|
Puccadrain |
39.600 - 40.450
|
850.000 |
30.2782260000, 77.9898594000 |
Estimation Done |
9 |
|
|
|
Good Condition |
Mar 2025 |
[2]
Ambala Paunta Shahib Dehradun Rishikesh (Haridwar) national highway
|
Black spot |
119.300 - 119.312
|
12.000 |
30.4341158000, 77.7498425000 |
Treatment in Progress |
1 |
|
|
|
estimate send to CE-RO, MORT&H, Dehradun. Road Code 5709. |
Jan 2024 |
[2]
Ambala Paunta Shahib Dehradun Rishikesh (Haridwar) national highway
|
Black spot |
124.220 - 124.320
|
100.000 |
30.4066372000, 77.7931619000 |
Treatment in Progress |
1 |
|
|
|
estimate send to CE-RO, MORT&H, Dehradun. Road Code 5709. |
Jan 2024 |
[2]
Ambala Paunta Shahib Dehradun Rishikesh (Haridwar) national highway
|
Black spot |
124.325 - 124.425
|
100.000 |
30.4066368000, 77.7931698000 |
Treatment in Progress |
1 |
|
|
|
estimate send to CE-RO, MORT&H, Dehradun. Road code 5709. |
Jan 2024 |