Road Segment Feature Chainage Length Cordinates Status Priority Install Date Repair Date Repair events Remark Updated On
[12] Jyolikot Almora Karanprayag national highway culvert 80.100 - 80.102 2.000 29.6346450000, 79.6257650000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 80.250 - 80.252 1.500 29.6405270000, 79.6243210000 Estimation Done 8 RCC culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 80.430 - 80.431 1.000 29.6358340000, 79.6236190000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 80.450 - 80.451 1.000 29.6360090000, 79.6232390000 Estimation Done 8 Arch culvert May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 80.530 - 80.531 1.000 29.6367620000, 79.6235210000 Estimation Done 8 arch culvert May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 80.550 - 80.552 2.000 29.6391930000, 79.6130940000 Estimation Done 8 RCC culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 80.850 - 80.852 2.000 29.6347280000, 79.6247230000 Estimation Done 8 arch culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 81.010 - 81.012 2.000 29.6400570000, 79.6243350000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 81.800 - 81.802 2.000 29.6402230000, 79.6205200000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 81.880 - 81.882 2.000 29.6397780000, 79.6189700000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 82.800 - 82.802 2.000 29.6318720000, 79.6120280000 Estimation Done 8 RCC box Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 83.440 - 83.442 2.000 29.6352350000, 79.6083250000 Estimation Done 8 RCC Box culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 83.470 - 83.472 2.000 29.6347480000, 79.6082400000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 83.840 - 83.842 1.500 29.6344030000, 79.6054630000 Estimation Done 8 RCC culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 84.080 - 84.082 2.000 29.6338770000, 79.6044870000 Estimation Done 8 RCC Box culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 84.700 - 84.701 1.000 29.6311020000, 79.5118160000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 84.890 - 84.892 2.000 29.6303630000, 79.5983020000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 85.150 - 85.152 2.000 29.6305760000, 79.5958500000 Estimation Done 0 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 86.100 - 86.102 1.500 29.6357180000, 79.5974190000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 86.180 - 86.182 1.500 29.6316920000, 79.5970870000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 86.250 - 86.252 2.000 29.6371470000, 79.5972300000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 86.340 - 86.342 2.000 29.6376980000, 79.5972860000 Estimation Done 8 RCC culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 87.450 - 87.452 2.000 29.6434640000, 79.5964930000 Identified 8 RCC box Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 87.821 - 87.823 2.000 29.6442290000, 79.5957050000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 88.050 - 88.051 1.000 29.6460010000, 79.5939900000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 88.610 0.000 29.6402720000, 79.5906390000 Estimation Done 8 hume pipe open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 88.720 - 88.721 1.000 29.6435920000, 79.5903680000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 88.985 - 88.986 1.000 29.6425070000, 79.5881040000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 89.150 - 89.151 1.000 29.6433320000, 79.5870750000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 89.340 - 89.341 1.000 29.6424460000, 79.5867990000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 89.710 - 89.712 2.000 29.6399350000, 79.5856890000 Estimation Done 8 arch culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 89.800 - 89.801 1.000 29.6403150000, 79.5847770000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 89.865 - 89.866 1.000 29.6401410000, 79.5841570000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 90.000 - 90.001 1.000 29.6398330000, 79.5834440000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 90.300 - 90.301 1.000 29.6381220000, 79.5826410000 Estimation Done 8 RCC Culvert open May 2024
[12] Jyolikot Almora Karanprayag national highway culvert 90.550 - 90.551 1.000 29.6370210000, 79.5813670000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 90.725 - 90.726 1.000 29.6375760000, 79.5797090000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 91.080 - 91.081 1.000 29.6388570000, 79.5766250000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 91.300 - 91.301 1.000 29.6390080000, 79.5742900000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 91.480 - 91.481 1.000 29.6392440000, 79.5734350000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 91.540 - 91.541 1.000 29.6397940000, 79.5733050000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 91.595 - 91.596 1.000 29.6401340000, 79.5730440000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 91.740 - 91.741 1.000 29.6410460000, 79.5718230000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 92.710 - 92.711 1.000 29.6464240000, 79.5641940000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 92.950 - 92.951 1.000 29.6464640000, 79.5627230000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 93.170 - 93.171 1.000 29.6466500000, 79.5613550000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 93.430 - 93.431 1.000 29.6467080000, 79.5598140000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 93.650 - 93.651 1.000 29.6470500000, 79.5581550000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 93.840 - 93.841 1.000 29.6471310000, 79.5565170000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 93.940 - 93.941 1.000 29.6476950000, 79.5562180000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 94.125 - 94.126 1.000 29.6484830000, 79.5551200000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 94.300 - 94.301 1.000 29.6491320000, 79.5541600000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 94.430 - 94.431 1.000 29.6496670000, 79.5528250000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 94.700 - 94.701 1.000 29.6509130000, 79.5524260000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 94.900 - 94.901 1.000 29.6519100000, 79.5507790000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 95.100 - 95.104 4.000 29.6533060000, 79.5497370000 Estimation Done 8 Box Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 95.150 - 95.151 1.000 29.6539500000, 79.5488500000 Estimation Done 8 RCC Culvert Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 96.350 - 96.351 1.000 29.6587620000, 79.5407570000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 96.425 - 96.426 1.000 29.6586970000, 79.5401570000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 96.450 - 96.451 1.000 29.6586520000, 79.5398650000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 96.640 - 96.644 4.000 29.6598680000, 79.5387430000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 97.130 - 97.131 1.000 29.6605800000, 79.5395830000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 97.335 - 97.336 1.000 29.6619200000, 79.5388860000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 97.410 0.000 29.6624530000, 79.5389080000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 97.610 - 97.611 1.000 29.6629740000, 79.5381620000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 97.780 - 97.781 1.000 29.6638900000, 79.5369430000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 97.830 - 97.831 1.000 29.6645850000, 79.5367770000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 97.900 - 97.904 4.000 29.6656350000, 79.5350730000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 97.995 - 97.996 1.000 29.6638890000, 79.5369450000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 98.100 - 98.104 4.000 29.6677710000, 79.5341520000 Estimation Done 8 box Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 98.300 - 98.301 1.000 29.6277468000, 79.4354464000 Identified 0 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 98.500 - 98.501 1.000 29.6697710000, 79.5326860000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 98.850 - 98.854 4.000 29.6696440000, 79.5321760000 Estimation Done 8 box Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 99.380 0.000 29.6742150000, 79.5276690000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 99.420 - 99.421 1.000 29.6729480000, 79.5270880000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 99.535 0.000 29.6731970000, 79.5263570000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 99.630 - 99.632 2.000 29.6734920000, 79.5254750000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 100.105 - 100.106 1.000 29.6751210000, 79.5224160000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 100.400 - 100.401 1.000 29.6762260000, 79.5201880000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 100.950 - 100.951 1.000 29.6786950000, 79.5176830000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 101.080 - 101.082 2.000 29.6780980000, 79.5166730000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 101.150 - 101.152 2.000 29.6783910000, 79.5158380000 Estimation Done 8 arch Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 101.870 - 101.872 1.500 29.6805330000, 79.5104020000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 102.500 - 102.502 2.000 29.6816600000, 79.5050720000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 103.150 - 103.152 1.500 29.6776350000, 79.5008770000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 103.430 - 103.432 1.500 29.6758380000, 79.4987950000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 103.550 - 103.551 1.000 29.6748730000, 79.4972420000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 104.740 - 104.742 2.000 29.6713410000, 79.4938740000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway culvert 104.950 - 104.952 2.000 29.6703810000, 79.4929090000 Estimation Done 8 RCC Culvert open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Cause way 103.215 - 103.239 24.000 29.6770690000, 79.5003540000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Cause way 104.978 - 104.990 12.000 29.6704740000, 79.4924750000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Cautionary board 80.510 0.000 29.6352700000, 79.6253900000 Estimation Done 8 Good condition Jun 2024
[12] Jyolikot Almora Karanprayag national highway Crash barrier 80.180 - 80.260 80.000 29.6347970000, 79.6247460000 Estimation Done 8 Good condition Jun 2024
[12] Jyolikot Almora Karanprayag national highway Informatory board 80.500 0.000 29.6352220000, 79.6253790000 Estimation Done 8 Good condition Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 80.140 0.000 29.6401980000, 79.6242060000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 80.570 0.000 29.6417080000, 79.6218320000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 80.580 0.000 29.6371530000, 79.6239260000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 80.610 0.000 29.6376560000, 79.6241750000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 80.770 0.000 29.6387530000, 79.6241390000 Estimation Done 5 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 80.815 0.000 29.6392320000, 79.6239860000 Estimation Done 5 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 81.725 0.000 29.6402210000, 79.6205190000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 82.024 0.000 29.6397727000, 79.6180320000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 82.110 0.000 29.6393360000, 79.6173770000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 82.150 0.000 29.6392900000, 79.6169230000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 82.240 0.000 29.6396100000, 79.6161340000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 82.300 0.000 29.6398490000, 79.6156130000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 82.330 0.000 29.6398440000, 79.6153650000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 82.450 0.000 29.6390030000, 79.6146440000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 82.500 0.000 29.6390200000, 79.6136780000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 83.080 0.000 29.6379830000, 79.6105070000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 83.300 0.000 29.6363530000, 79.6090280000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 83.750 0.000 29.6350530000, 79.6058900000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 84.180 0.000 29.6335180000, 79.6034820000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 84.210 0.000 29.6334520000, 79.6031170000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 84.810 0.000 29.6306980000, 79.5992620000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 84.990 0.000 29.6304970000, 79.5973930000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 85.110 0.000 29.6303820000, 79.5964080000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 85.210 0.000 29.6309320000, 79.5954430000 Identified 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 85.260 0.000 29.6314900000, 79.5955030000 Identified 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 85.320 0.000 29.6321830000, 79.5959870000 Identified 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 85.440 0.000 29.6329470000, 79.5963950000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 85.620 0.000 29.6337680000, 79.5972050000 Estimation Done 8 oprn May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 85.635 0.000 29.6338400000, 79.5973220000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 85.810 0.000 29.6347670000, 79.5979900000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 86.230 0.000 29.6368530000, 79.5972970000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 86.430 0.000 29.6387890000, 79.5967410000 Identified 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 86.570 0.000 29.6393170000, 79.5981010000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 86.630 0.000 29.6396820000, 79.5983140000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 86.810 0.000 29.6402840000, 79.5993810000 Identified 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 86.850 0.000 29.6407020000, 79.5993670000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 86.910 0.000 29.6414000000, 79.5997520000 Identified 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 86.940 0.000 29.6416030000, 79.5996450000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 87.050 0.000 29.6425230000, 79.5993910000 Identified 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 87.210 0.000 29.6425620000, 79.5979180000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 87.350 0.000 29.6437920000, 79.5972890000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 87.950 0.000 29.6424580000, 79.5992320000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 88.310 0.000 29.6442510000, 79.5918520000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 88.500 0.000 29.6425320000, 79.5910740000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 89.580 0.000 29.6411490000, 79.5857280000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 90.040 0.000 29.6393210000, 79.5832450000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 90.160 0.000 29.6384230000, 79.5835620000 Estimation Done 8 open May 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 90.400 0.000 29.6374900000, 79.5825510000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 90.422 0.000 29.6371400000, 79.5823180000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 90.900 0.000 29.6386050000, 79.5784320000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 91.650 0.000 29.6407490000, 79.5721740000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 91.860 0.000 29.6422940000, 79.5713530000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 92.010 0.000 29.6431750000, 79.5708580000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 92.450 0.000 29.6455380000, 79.5672630000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 92.650 0.000 29.6455570000, 79.5658650000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 93.815 0.000 29.6471930000, 79.5568930000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 94.210 0.000 29.6488610000, 79.5545030000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 94.790 0.000 29.6516430000, 79.5509290000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 95.580 0.000 29.6564570000, 79.5469420000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 95.720 0.000 29.6564490000, 79.5469340000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 95.810 0.000 29.6560620000, 79.5447050000 Estimation Done 8 Open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 96.580 0.000 29.6594250000, 79.5391030000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 97.600 0.000 29.6629730000, 79.5381650000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 97.980 0.000 29.6639400000, 79.5343510000 Estimation Done 1 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 98.060 0.000 29.6674040000, 79.5343250000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 98.780 0.000 29.6701630000, 79.5320890000 Estimation Done 0 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 99.050 0.000 29.6711870000, 79.5296500000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 99.230 0.000 29.6719160000, 79.5284020000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 99.290 0.000 29.6721150000, 79.5285690000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 99.870 0.000 29.6735960000, 79.5233400000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 100.040 0.000 29.6750840000, 79.5224260000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 100.155 0.000 29.6754390000, 79.5221890000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 100.260 0.000 29.6759880000, 79.5214380000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 100.580 0.000 29.6774190000, 79.5197120000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 100.910 0.000 29.6785500000, 79.5182080000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 101.050 0.000 29.6784800000, 79.5167950000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 101.115 0.000 29.6783760000, 79.5163240000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 101.480 0.000 29.6796030000, 79.5134450000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 102.670 0.000 29.6810020000, 79.5029670000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 103.290 0.000 29.6770100000, 79.4997450000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 104.280 0.000 29.6722170000, 79.4921030000 Estimation Done 6 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Scupper 104.640 0.000 29.6717050000, 79.4935680000 Estimation Done 6 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Parapet 80.250 - 80.255 5.000 29.6356740000, 79.6244830000 Estimation Done 7 Good condition Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 80.000 - 80.450 450.000 29.6342640000, 79.6266250000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 81.500 - 82.000 500.000 29.6419130000, 79.6218010000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 82.390 - 82.450 60.000 29.6393170000, 79.7962180100 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 88.900 - 89.020 120.000 29.6386050000, 79.5784320000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 92.600 - 92.700 100.000 29.6455440000, 79.5659410000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 95.250 - 96.000 750.000 29.6535120000, 79.5494560000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 96.000 - 96.425 425.000 29.6562620000, 79.5432430000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 100.585 - 101.000 415.000 29.6774190000, 79.5197120000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 101.000 - 102.000 1000.000 29.6788270000, 79.5172240000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 102.000 - 103.100 1100.000 29.6810150000, 79.5089550000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 103.000 - 104.000 1000.000 29.6789630000, 79.5005670000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 104.000 - 104.570 570.000 29.6736570000, 79.4945880000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 106.600 - 106.694 94.000 29.6649570000, 79.4820580000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Puccadrain 107.450 - 108.000 550.000 29.6654620000, 79.4742050000 Estimation Done 8 open Jun 2024
[12] Jyolikot Almora Karanprayag national highway Delimetor 80.150 - 80.156 6.000 29.6346450000, 79.6257650000 Estimation Done 8 Good condition Jun 2024
[18] Almora Panar national highway culvert 0.480 - 0.481 1.000 29.6171963900, 79.6725830600 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 0.680 - 0.681 1.000 29.6159577800, 79.6710783300 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 0.740 - 0.741 1.000 29.6157486100, 79.6706472200 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.030 - 1.031 1.000 29.6145469400, 79.6719547200 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.130 - 1.131 1.000 29.6143086100, 79.6726269400 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.200 - 1.201 1.000 29.6203205600, 79.6733333300 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.210 - 1.211 1.000 29.6144016700, 79.6734447200 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.290 - 1.291 1.000 29.6143855600, 79.6742797200 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.400 - 1.401 1.000 29.6189150000, 79.6729322200 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.430 - 1.431 1.000 29.6185925000, 79.6727883300 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.700 - 1.701 1.000 29.6121180600, 79.6757938900 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.820 - 1.821 1.000 29.6121591700, 79.6769208300 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.880 - 1.881 1.000 29.6115322200, 79.6770247200 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 1.930 - 1.931 1.000 29.6111619400, 79.6773841700 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 2.060 - 2.061 1.000 29.6106069400, 79.6781991700 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 2.170 - 2.171 1.000 29.6103047200, 79.6791813900 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 2.280 - 2.281 1.000 29.6108022200, 79.6800519400 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 2.410 - 2.411 1.000 29.6112947200, 79.6816077800 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 2.480 - 2.481 1.000 29.6112130600, 79.6818416700 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 2.510 - 2.511 1.000 29.6111827800, 79.6818775000 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 2.580 - 2.581 1.000 29.6105452800, 79.6825813900 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 2.640 - 2.641 1.000 29.6101047200, 79.6827208300 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 2.980 - 2.981 1.000 29.6104452800, 79.6851538900 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 3.000 - 3.001 1.000 29.6105461100, 79.6852802800 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 3.100 - 3.101 1.000 29.6108894400, 79.6862633300 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 3.180 - 3.181 1.000 29.6113925000, 79.6867786100 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 3.280 - 3.281 1.000 29.6120933300, 79.6874061100 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 3.350 - 3.351 1.000 29.6125727800, 79.6877900000 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 3.520 - 3.521 1.000 29.6136627800, 79.6886627800 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 3.710 - 3.711 1.000 29.6145494400, 79.6902088900 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 3.820 - 3.821 1.000 29.6147416700, 79.6910463900 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 3.950 - 3.951 1.000 29.6154919400, 79.6916580600 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 4.160 - 4.161 1.000 29.6152583300, 79.6936130600 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 4.330 - 4.331 1.000 29.6155166700, 79.6953336100 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 4.570 - 4.571 1.000 29.6146175000, 79.6967038900 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 4.670 - 4.671 1.000 29.6149919400, 79.6970094400 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 4.770 - 4.771 1.000 29.6158777800, 79.6969669400 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 4.870 - 4.871 1.000 29.6000000000, 79.6968597200 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 4.930 - 4.931 1.000 29.6003513900, 79.6973583300 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 34.040 - 34.041 1.000 29.5940727800, 79.8384819400 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 34.200 - 34.201 1.000 29.5953611100, 79.8383694400 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 34.420 - 34.421 1.000 29.5952816700, 79.8386197200 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 34.560 - 34.561 1.000 29.5940666700, 79.8391750000 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 34.910 - 34.911 1.000 29.5923238900, 79.8418927800 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 35.090 - 35.091 1.000 29.5918625000, 79.8436325000 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 35.210 - 35.211 1.000 29.5913652800, 79.8447450000 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 35.470 - 35.471 1.000 29.5904736100, 79.8470083300 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 35.660 - 35.661 1.000 29.5888258300, 79.8473797200 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 35.740 - 35.741 1.000 29.5881169400, 79.8476033300 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway culvert 35.820 - 35.821 1.000 29.5875455600, 79.8472713900 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway Cause way 55.250 - 55.270 20.000 29.5350222200, 79.9484166700 Estimation Done 8 open Jun 2024
[18] Almora Panar national highway Cause way 67.500 - 67.513 13.200 29.5102361100, 79.2523555600 Estimation Done 9 open Jun 2024
[18] Almora Panar national highway Slide Zone 73.100 - 73.175 75.000 29.5111111100, 80.0402777800 Identified 1 Jan 2024