Puccadrain Report For All Divisions
Division Road Segment Chainage Length Cordinates Status Priority Install Date Repair Date Repair events Remark Updated On
NH Dhumakot [11] starting from its junction with NH -74 near kashipur connecting Ramnager Dhumakot Thalisain Tripalisain Pabo and Terminating at NH 119 near Bubakhal National Highway 90.100 - 90.255 155.000 29.7242580000, 79.0655680000 Estimation Done 1 Jan 2024
NH Dhumakot [11] starting from its junction with NH -74 near kashipur connecting Ramnager Dhumakot Thalisain Tripalisain Pabo and Terminating at NH 119 near Bubakhal National Highway 94.750 - 95.020 270.000 29.7504130000, 79.0433200000 Estimation Done 1 Jan 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 55.630 - 56.000 370.000 29.5613760000, 79.6064930000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 57.420 - 57.470 50.000 29.5662440000, 79.6122020000 Identified 8 good condition (25nos) Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 57.670 - 57.720 50.000 29.5677170000, 79.6134110000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 57.920 - 57.970 50.000 29.5672020000, 79.6152280000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 58.580 - 58.680 100.000 29.5673190000, 79.6183470000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 60.400 - 60.520 120.000 29.5638250000, 79.6190250000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 60.500 - 60.550 50.000 29.5661950000, 79.6086000000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 60.700 - 60.701 1.300 29.5671110000, 79.6216410000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 62.200 - 63.000 800.000 29.5699800000, 79.6298350000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 66.050 - 66.051 1.000 29.5937580000, 79.6365330000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 67.000 - 67.950 950.000 29.5940290000, 79.6438240000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 68.000 - 68.001 1.000 29.5984340000, 79.6537800000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 69.000 - 69.001 1.000 29.6028430000, 79.6597640000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 70.000 - 70.100 100.000 29.6088150000, 79.6610350000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 71.200 - 72.000 800.000 29.6112590000, 79.6544220000 Estimation Done 8 good condition Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 72.050 - 72.450 400.000 29.6114770000, 79.6485520000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 73.000 - 73.001 1.000 29.6095050000, 79.6415610000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 77.070 - 77.071 1.000 29.6223830000, 79.6380290000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 78.000 - 78.001 1.000 29.6240160000, 79.6320800000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 79.000 - 79.001 1.000 29.6275710000, 79.6261130000 Estimation Done 8 open Sep 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 80.000 - 80.450 450.000 29.6342640000, 79.6266250000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 81.500 - 82.000 500.000 29.6419130000, 79.6218010000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 82.390 - 82.450 60.000 29.6393170000, 79.7962180100 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 88.900 - 89.020 120.000 29.6386050000, 79.5784320000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 92.600 - 92.700 100.000 29.6455440000, 79.5659410000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 95.250 - 96.000 750.000 29.6535120000, 79.5494560000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 96.000 - 96.425 425.000 29.6562620000, 79.5432430000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 100.585 - 101.000 415.000 29.6774190000, 79.5197120000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 101.000 - 102.000 1000.000 29.6788270000, 79.5172240000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 102.000 - 103.100 1100.000 29.6810150000, 79.5089550000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 103.000 - 104.000 1000.000 29.6789630000, 79.5005670000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 104.000 - 104.570 570.000 29.6736570000, 79.4945880000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 106.600 - 106.694 94.000 29.6649570000, 79.4820580000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 107.450 - 108.000 550.000 29.6654620000, 79.4742050000 Estimation Done 8 open Jun 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 108.000 - 108.210 210.000 29.6646980000, 79.4762230000 Estimation Done 8 open Jul 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 110.480 - 110.680 200.000 29.6660830000, 79.4645280000 Estimation Done 8 open Jul 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 112.700 - 112.975 275.000 29.6767700000, 79.4645280000 Estimation Done 8 open Jul 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 125.710 - 126.000 290.000 29.7161270000, 79.4367510000 Estimation Done 8 open Jul 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 126.000 - 126.075 75.000 29.7190590000, 79.4356140000 Estimation Done 8 open Jul 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 126.620 - 126.724 104.000 29.7224310000, 79.4364960000 Estimation Done 8 open Jul 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 126.860 - 126.924 64.000 29.7245210000, 79.4368470000 Estimation Done 8 open Jul 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 132.000 - 132.340 340.000 29.7433770000, 79.4371490000 Estimation Done 8 open Jul 2024
NH Ranikhet [12] Jyolikot Almora Karanprayag national highway 133.570 - 134.000 430.000 29.7525000000, 79.4306060000 Estimation Done 8 open Jul 2024
NH Dehradun [15] Purkazi Laksar Haridwar national highway 51.200 - 52.200 1000.000 29.8551390000, 78.1148060000 Estimation Done 8 Pucca Drain 1000 M Length Sep 2024
NH Dehradun [15] Purkazi Laksar Haridwar national highway 59.850 - 60.030 180.000 29.9157780000, 78.1366670000 Estimation Done 9 Pucca Drain 150 M Brick Masonry Sep 2024
NH Dehradun [15] Purkazi Laksar Haridwar national highway 60.750 - 61.010 260.000 29.9209720000, 78.1375830000 Estimation Done 9 Pucca Drain 260 M Brick Masonry Sep 2024
NH Dehradun [15] Purkazi Laksar Haridwar national highway 61.200 - 61.400 200.000 29.9253330000, 78.1347220000 Estimation Done 9 Pucca Drain 200 M Brick Masonry Sep 2024
NH Dehradun [15] Purkazi Laksar Haridwar national highway 61.200 - 61.400 200.000 29.9253330000, 78.1347220000 Estimation Done 9 Pucca Drain 200 M Brick Masonry Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 93.400 - 93.550 150.000 29.8486725000, 79.9742502800 Estimation Done 5 K. C. Drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 93.920 - 94.400 480.000 29.8483130600, 79.9651522200 Estimation Done 5 200 mtr damaged Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 94.500 - 94.910 410.000 29.8464558300, 79.9619611100 Estimation Done 5 140 mrt damage Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 103.010 - 103.120 110.000 29.8398000000, 79.9169630600 Estimation Done 5 K. C. Deain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 108.005 - 108.205 200.000 29.8256722200, 79.8797750000 Estimation Done 5 K.C. Drain 100 mtr damage Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 109.450 - 109.650 200.000 29.8227933300, 79.8710619400 Estimation Done 5 K.C. Drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 110.018 - 110.050 32.000 29.8233610000, 79.8675560000 Estimation Done 5 K C Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 129.034 - 129.127 93.000 29.8366350000, 79.7889080000 Estimation Done 5 K C Drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 129.095 - 129.149 54.000 29.8360320000, 79.7887840000 Estimation Done 5 K C Drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 129.152 - 129.196 44.000 29.8356850000, 79.7883800000 Estimation Done 5 K C Drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 129.198 - 129.883 685.000 29.8354410000, 79.7881550000 Estimation Done 5 K C Drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 129.890 - 129.925 35.000 29.8364440000, 79.7835650000 Estimation Done 6 K C Drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 130.000 - 130.172 172.000 29.8359440000, 79.7836110000 Estimation Done 7 K C Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 130.173 - 130.313 140.000 29.8351940000, 79.7849170000 Estimation Done 6 K C Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 130.712 - 130.835 123.000 29.8346940000, 79.7832500000 Estimation Done 9 U type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 130.876 - 131.000 124.000 29.8358610000, 79.7822220000 Estimation Done 9 U Type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 131.000 - 131.731 731.000 29.8364720000, 79.7809720000 Estimation Done 9 U Type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 132.006 - 132.352 346.000 29.8386940000, 79.7727220000 Estimation Done 9 U Type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 132.552 - 133.000 448.000 29.8353890000, 79.7718330000 Estimation Done 9 U Type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 133.000 - 133.128 128.000 29.8314720000, 79.7712500000 Estimation Done 9 U Type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 133.130 - 133.530 400.000 29.8305280000, 79.7705830000 Estimation Done 9 U Type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 134.000 - 134.145 145.000 29.8243330000, 79.7684720000 Estimation Done 6 K C Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 135.000 - 135.607 607.000 29.8217780000, 79.7728610000 Estimation Done 5 U type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 135.608 - 135.761 153.000 29.8168330000, 79.7744440000 Estimation Done 5 U Type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 135.950 - 136.000 50.000 29.8141120000, 79.7748000000 Estimation Done 6 U Type Drain Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 136.000 - 136.100 100.000 29.8131670000, 79.7747270000 Estimation Done 5 Good Condition Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 136.250 - 137.000 750.000 29.8100170000, 79.7732090000 Sanctioned 4 Good Condition Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 146.550 - 146.850 300.000 29.1861680000, 79.7852120000 Estimation Done 5 Good Condition Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 149.645 - 149.885 240.000 29.7757510000, 79.7720270000 Treatment in Progress 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 149.974 - 150.154 180.000 29.7743990000, 79.7724610000 Treatment in Progress 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 150.395 - 150.435 40.000 29.7750610000, 79.7689190000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 150.477 - 150.517 40.000 29.7751870000, 79.7680950000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 150.520 - 150.530 10.000 29.7748350000, 79.7681300000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 151.919 - 151.949 30.000 29.7677260000, 79.7742320000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 151.951 - 151.981 30.000 29.7678450000, 79.7745470000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 152.101 - 152.131 30.000 29.7678430000, 79.7755290000 Treatment in Progress 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 152.133 - 152.143 10.000 29.7680680000, 79.7757380000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 153.792 - 153.812 20.000 29.7622970000, 79.7748430000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 153.814 - 153.834 20.000 29.7622890000, 79.7745570000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 154.798 - 154.818 20.000 29.7578220000, 79.7737230000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 154.820 - 154.840 20.000 29.7576500000, 79.7737850000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 155.067 - 155.087 20.000 29.7563990000, 79.7750990000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 155.089 - 155.109 20.000 29.7562560000, 79.7751500000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 161.626 - 161.641 15.000 29.7483830000, 79.7459300000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 161.980 - 162.190 210.000 29.7485690000, 79.7430690000 Estimation Done 5 U Drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 162.226 - 162.426 200.000 29.7505100000, 79.7436750000 Treatment in Progress 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 162.439 - 162.459 20.000 29.7501020000, 79.7420470000 Treatment in Progress 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 162.539 - 162.569 30.000 29.7493370000, 79.7414740000 Treatment in Progress 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 162.573 - 162.617 44.000 29.7490340000, 79.7413560000 Estimation Done 5 KC drain Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 169.880 - 170.030 150.000 29.7370100000, 79.7104370000 Estimation Done 7 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 170.000 - 170.080 80.000 29.7367830000, 79.7098050000 Estimation Done 7 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 170.150 - 170.245 95.000 29.7359690000, 79.7101340000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 170.830 - 170.900 70.000 29.7338090000, 79.7040480000 Estimation Done 7 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 171.000 - 171.045 45.000 29.7332780000, 79.7031320000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 171.270 - 171.370 100.000 29.7331210000, 79.7011860000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 171.440 - 171.505 65.000 29.7322310000, 79.7009220000 Estimation Done 7 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 171.530 - 171.660 130.000 29.7321170000, 79.7001590000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 173.615 - 173.910 295.000 29.7795050000, 79.6988450000 Estimation Done 7 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 173.860 - 173.866 6.000 29.7238160000, 79.6969200000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 173.960 - 173.995 35.000 29.7183110000, 79.7004460000 Estimation Done 7 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 174.000 - 174.175 175.000 29.7182944000, 79.7003055600 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 174.410 - 174.443 33.000 29.7152740000, 79.6996410000 Estimation Done 7 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 174.520 - 174.560 40.000 29.7146920000, 79.6998440000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 174.620 - 174.660 40.000 29.7137070000, 79.7010340000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 174.700 - 174.920 220.000 29.7131690000, 79.7011380000 Estimation Done 8 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 175.030 - 175.140 110.000 29.7106520000, 79.7028880000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 175.420 - 175.720 300.000 29.7081220000, 79.7035780000 Estimation Done 5 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 175.720 - 175.920 200.000 29.7057820000, 79.7031980000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 176.000 - 176.900 900.000 29.7070360000, 79.7012460000 Estimation Done 6 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 177.100 - 177.790 690.000 29.7002330000, 79.7024210000 Estimation Done 7 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 184.150 - 184.720 570.000 29.6828300000, 79.7130510000 Estimation Done 7 Good Condition Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 185.510 - 185.730 220.000 29.6724930000, 79.7147590000 Estimation Done 7 GOOD CONDITION Sep 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 188.100 - 188.180 80.000 29.6666780000, 79.7144150000 Estimation Done 5 Good Condition Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 189.730 - 189.830 100.000 29.6644690000, 79.7008490000 Estimation Done 5 Good Condition Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 189.850 - 189.900 50.000 29.6643650000, 79.7008750000 Estimation Done 5 Good Condition Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 190.320 - 190.340 20.000 29.6639200000, 79.6959040000 Estimation Done 5 Good Condition Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 202.015 - 202.115 100.000 29.6211300000, 79.6729300000 Estimation Done 5 Good Condition Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 203.450 - 203.570 120.000 29.6145000000, 79.6635300000 Estimation Done 5 Good Condition Aug 2024
NH Ranikhet [17] Gangolihat, Berinag, Chaukori, Kanda, Bagheshwar, Takula and terminating at its junction with new NH No. 109 near Almora national highway 203.620 - 203.700 80.000 29.6145900000, 79.6612500000 Estimation Done 5 Good Condition Aug 2024
NH Ranikhet [18] Almora Panar national highway 0.000 0.000 0.0000000000, 0.0000000000 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 1.000 - 1.150 150.000 29.6212658300, 79.6730447200 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 2.000 - 2.200 200.000 29.6144122200, 79.6733633300 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 6.000 - 6.200 200.000 29.6172522200, 79.7022213900 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 7.000 - 7.250 250.000 29.6169825000, 79.7081608300 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 14.000 - 14.150 150.000 29.6358394400, 79.7366208300 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 15.000 - 15.200 200.000 29.6404627800, 79.7425661100 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 16.000 - 16.175 175.000 29.6422777800, 79.7512058300 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 26.000 - 26.105 105.000 29.6419133300, 79.8183530600 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 29.000 - 29.100 100.000 29.6275691700, 79.8277322200 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 30.000 - 30.110 110.000 29.6178550000, 79.8473730600 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 47.000 - 47.630 630.000 29.5698277800, 79.9299797200 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 48.000 - 48.615 615.000 29.5637605600, 79.9341183300 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 54.000 - 54.550 550.000 29.5349655600, 79.9424663900 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 55.000 - 55.520 520.000 29.5312577800, 79.9577355600 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 59.000 - 59.650 650.000 29.5349216700, 79.9879616700 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 60.000 - 60.630 630.000 29.5283516700, 79.9928891700 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 61.000 - 61.630 630.000 29.5216697200, 79.9981761100 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 62.000 - 62.175 175.000 29.5200897200, 80.2230555600 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 63.000 - 63.195 195.000 29.5124488330, 80.2502347200 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 64.000 - 64.185 185.000 29.5127766700, 80.6001136100 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 65.000 - 65.210 210.000 29.5083194400, 80.8500058300 Estimation Done 9 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 66.000 - 66.227 227.000 29.5127613900, 79.6001219400 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 67.000 - 67.205 205.000 29.5052605600, 80.2011952800 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 68.000 - 68.209 209.000 29.5078375000, 80.2020161100 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 69.000 - 69.195 195.000 29.5104275000, 80.2189908300 Estimation Done 8 ok Sep 2024
NH Ranikhet [18] Almora Panar national highway 70.000 - 70.215 215.000 29.5066122200, 79.2169563900 Estimation Done 8 ok Sep 2024
CD Uttarkashi [27] Badethi Banchora Bhadrigad state highway 40.700 - 40.750 50.000 30.6375370000, 78.1954600000 Treatment in Progress 8 drain is damage Jul 2024
CD Uttarkashi [27] Badethi Banchora Bhadrigad state highway 43.250 - 43.600 350.000 30.6513040000, 78.1859880000 Treatment in Progress 8 drain is damaged Jul 2024
CD Uttarkashi [27] Badethi Banchora Bhadrigad state highway 44.750 - 44.850 100.000 30.6452210000, 78.1794900000 Treatment in Progress 8 drain is damage Jul 2024
CD Uttarkashi [27] Badethi Banchora Bhadrigad state highway 45.200 - 45.500 300.000 30.6435640000, 78.1826730000 Treatment in Progress 10 drain is damage Jul 2024
CD Uttarkashi [27] Badethi Banchora Bhadrigad state highway 46.100 - 46.150 50.000 30.6406600000, 78.1786960000 Treatment in Progress 0 drain is partially damage Jul 2024
CD Uttarkashi [27] Badethi Banchora Bhadrigad state highway 53.100 - 53.200 100.000 30.6160920000, 78.1669620000 Treatment in Progress 10 drain is partially damage Jul 2024
TD Thathyd [27] Badethi Banchora Bhadrigad state highway 72.860 - 72.910 50.000 30.6046980000, 78.0845790000 Estimation Done 0 Nov 2024
TD Thathyd [27] Badethi Banchora Bhadrigad state highway 73.020 - 73.120 100.000 30.6044750000, 78.0841410000 Estimation Done 0 Nov 2024
TD Thathyd [27] Badethi Banchora Bhadrigad state highway 74.350 - 74.370 20.000 30.5997090000, 78.0761300000 Estimation Done 0 Nov 2024
CD Srinagar [57] Pauri Khirsu Khedakhal Kandai Khankra state highway 9.000 - 9.100 100.000 30.1666220000, 78.8543310000 Estimation Done 0 Jun 2024
CD Srinagar [57] Pauri Khirsu Khedakhal Kandai Khankra state highway 10.300 - 10.423 123.000 30.1693330000, 78.8703110000 Estimation Done 0 Jun 2024
CD Srinagar [57] Pauri Khirsu Khedakhal Kandai Khankra state highway 14.600 - 14.800 200.000 30.1763030000, 78.8666690000 Estimation Done 0 Jun 2024
PD Dehradun [81] Rajpur Kuthalgate state highway 0.000 - 2.000 2000.000 30.3717580000, 78.0776010000 Estimation Done 5 choked in various place Sep 2024
PD Dehradun [81] Rajpur Kuthalgate state highway 0.000 - 2.000 2000.000 30.3717668385, 78.0779748853 Estimation Done 4 choked in various places Sep 2024
PD Dehradun [81] Rajpur Kuthalgate state highway 2.000 - 2.520 520.000 30.3900600000, 78.0930000000 Estimation Done 4 Sep 2024
PD Dehradun [81] Rajpur Kuthalgate state highway 2.000 - 2.550 550.000 30.3902270000, 78.0932800000 Estimation Done 4 Sep 2024
PD Dehradun [81] Rajpur Kuthalgate state highway 2.600 - 3.100 500.000 30.3945960000, 78.0922760000 Treatment in Progress 9 required Sep 2024
PD Dehradun [81] Rajpur Kuthalgate state highway 3.125 - 3.800 675.000 30.3937710000, 78.0895900000 Estimation Done 4 Sep 2024
TD Rishikesh [84] Ring Road of Dehradun(Jogiwala to Kirsali Chock) state highway 0.000 - 0.805 805.000 30.2863560000, 78.0659260000 Estimation Done 1 good condition Jan 2024
TD Thathyd [93] Suakholi Almas Bhawan Sarot Chapta Nagun state highway 25.115 - 25.265 150.000 30.4863000000, 78.2405000000 Estimation Done 0 Oct 2024
TD Thathyd [93] Suakholi Almas Bhawan Sarot Chapta Nagun state highway 42.810 - 42.855 45.000 30.5266000000, 78.3107000000 Estimation Done 0 Oct 2024
TD Thathyd [93] Suakholi Almas Bhawan Sarot Chapta Nagun state highway 43.000 - 43.250 250.000 30.5226000000, 78.3122000000 Estimation Done 0 Oct 2024
PD Bhatwari [98] Uttarkashi Ghansali Tilwara state highway 0.225 - 1.000 775.000 30.7316250000, 78.4328666700 Estimation Done 0 May 2024
PD Bhatwari [98] Uttarkashi Ghansali Tilwara state highway 10.625 - 11.525 900.000 30.6999419440, 78.4800194400 Estimation Done 0 May 2024
PD Bhatwari [98] Uttarkashi Ghansali Tilwara state highway 12.250 - 12.450 200.000 30.6934250000, 78.4871944400 Estimation Done 0 May 2024
CD Badkote [122] Damta Kandari Sarigad motor road 17.175 - 17.275 100.000 30.6402780000, 78.0575000000 Estimation Done 1 good Jun 2024
CD Badkote [122] Damta Kandari Sarigad motor road 18.950 - 19.150 200.000 30.6350000000, 78.0577780000 Estimation Done 1 good Jun 2024
CD Badkote [123] Kua Kafnaul motor road 0.050 - 1.000 950.000 30.7214640000, 78.0850480000 Estimation Done 1 good May 2024
CD Badkote [123] Kua Kafnaul motor road 1.125 - 1.275 150.000 30.7213750000, 78.0898440000 Estimation Done 1 good May 2024
CD Badkote [123] Kua Kafnaul motor road 12.025 - 12.400 375.000 30.7232420000, 78.1396830000 Estimation Done 1 good May 2024
CD Badkote [123] Kua Kafnaul motor road 22.375 - 23.300 925.000 30.7408650000, 78.1339730000 Estimation Done 1 good May 2024
PD Bhatwari [164] Tekhla Mahidanda motor road 8.300 - 8.450 150.000 30.7605555560, 78.4388888890 Estimation Done 0 May 2024
PD Bhatwari [164] Tekhla Mahidanda motor road 9.525 - 9.775 250.000 30.7538888890, 78.4338888900 Estimation Done 0 May 2024
PD Bhatwari [164] Tekhla Mahidanda motor road 9.675 - 9.875 200.000 30.7527777780, 78.4341666700 Estimation Done 0 May 2024
PD Bhatwari [164] Tekhla Mahidanda motor road 9.725 - 9.775 50.000 30.7522220000, 78.4341666700 Estimation Done 0 May 2024
PD Bhatwari [164] Tekhla Mahidanda motor road 10.675 - 10.775 100.000 30.7508333300, 78.4338888890 Estimation Done 0 May 2024
PD Bhatwari [164] Tekhla Mahidanda motor road 11.300 - 11.550 250.000 30.7550000000, 78.4311110000 Estimation Done 0 May 2024
PD Bhatwari [164] Tekhla Mahidanda motor road 11.325 - 11.475 150.000 30.7530555600, 78.4319444400 Estimation Done 0 May 2024
PD Bhatwari [164] Tekhla Mahidanda motor road 11.625 - 11.875 250.000 30.7572222000, 78.4313888900 Estimation Done 0 May 2024
PD Bhatwari [166] Chadethi Raithal motor road 10.225 - 10.275 50.000 30.8197222200, 78.5991666700 Estimation Done 1 KC TYPE May 2024
PD Bhatwari [166] Chadethi Raithal motor road 11.275 - 11.425 150.000 30.8200000000, 78.6000000000 Estimation Done 1 U TYPE May 2024
PD Bhatwari [166] Chadethi Raithal motor road 11.525 - 11.560 35.000 30.8169444400, 78.6027777800 Estimation Done 1 Good condition May 2024
PD Bhatwari [166] Chadethi Raithal motor road 11.700 - 11.840 140.000 30.8180555600, 78.6025000000 Estimation Done 1 U TYPE May 2024
CD Srinagar [179] Khandah Sumadi Bughani Devalgarh Chamdhar motor road 10.800 - 10.980 180.000 30.1977700000, 78.8180550000 Estimation Done 0 Good condition May 2024
CD Srinagar [186] Pauri Khirsu Srinagar motor road 4.060 - 4.120 60.000 30.1788030000, 78.8605000000 Estimation Done 0 Jun 2024
CD Srinagar [186] Pauri Khirsu Srinagar motor road 4.450 - 4.675 225.000 30.1776000000, 78.8595060000 Estimation Done 0 Jun 2024
CD Srinagar [186] Pauri Khirsu Srinagar motor road 6.350 - 6.475 125.000 30.1794910000, 78.8513690000 Estimation Done 0 Jun 2024
CD Srinagar [186] Pauri Khirsu Srinagar motor road 17.520 - 17.620 100.000 30.2117090000, 78.7894000000 Estimation Done 0 Jun 2024
CD Srinagar [186] Pauri Khirsu Srinagar motor road 22.100 - 22.350 250.000 30.2179390000, 78.7842880000 Estimation Done 0 Jun 2024
CD Srinagar [186] Pauri Khirsu Srinagar motor road 23.160 - 23.300 140.000 30.2205110000, 78.7880280000 Estimation Done 0 Jun 2024
CD Srinagar [186] Pauri Khirsu Srinagar motor road 24.200 - 24.400 200.000 30.2214720000, 78.7796780000 Estimation Done 0 Jun 2024
CD Pokhari [191] Karanprayag Pokhari Gopeshwer state highway 0.100 - 0.250 150.000 30.3429950000, 79.1992870000 Estimation Done 6 2023-12-14 00:00:00 KC TYPE DRAIN IS IN WELL CONDITION. May 2024
CD Pokhari [191] Karanprayag Pokhari Gopeshwer state highway 0.720 - 0.820 100.000 30.3393730000, 79.2016790000 Estimation Done 4 2023-09-14 00:00:00 KC TYPE DRAIN IS IN GOOD CONDITION. May 2024
CD Pokhari [191] Karanprayag Pokhari Gopeshwer state highway 23.900 - 24.000 100.000 30.2688420000, 79.2193280000 Estimation Done 4 DRAIN IS IN GOOD CONDITION. May 2024
CD Pokhari [191] Karanprayag Pokhari Gopeshwer state highway 23.975 - 24.525 550.000 30.2671820000, 79.2184770000 Estimation Done 4 DRAIN IS GOOD CONDITION. May 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 6.675 -- 29.4394060000, 79.5609720000 Estimation Done 1 MDUK04011 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 6.700 -- 29.4388330000, 79.5609750000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 6.825 -- 29.4383970000, 79.5606810000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 7.550 -- 29.4432670000, 79.5606170000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 7.675 -- 29.4439220000, 79.5603560000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 7.950 -- 29.4454000000, 79.5603030000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 8.100 -- 29.4459280000, 79.5611250000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 8.350 -- 29.4500610000, 79.5695220000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 8.550 -- 29.4526830000, 79.5724000000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 10.750 -- 29.4584390000, 79.5783470000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 11.050 -- 29.4578000000, 79.5793190000 Estimation Done 1 Jan 2024
CD Nainital [198] Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road 15.975 -- 29.4737720000, 79.6049720000 Estimation Done 1 Jan 2024
PD Bageshwar [236] Baijnath-Binkholi motor road 1.350 -- 29.9175130000, 79.6219770000 50 m Pucca K.C drain open& well condition Jan 2024
PD Bageshwar [236] Baijnath-Binkholi motor road 2.950 -- 29.9290080000, 79.6267000000 100 m Pucca K.C drain open& well condition Jan 2024
PD Bageshwar [236] Baijnath-Binkholi motor road 3.550 -- 29.9336360000, 79.6280470000 120 m Pucca K.C drain open& well condition Jan 2024
CD Pokhari [373] Pokhari market link motor road 0.000 - 0.080 80.000 30.3428790000, 79.1986200000 Estimation Done 5 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [373] Pokhari market link motor road 0.100 - 0.300 200.000 30.3423150000, 79.1984670000 Estimation Done 6 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [373] Pokhari market link motor road 0.250 - 0.400 150.000 30.3437970000, 79.1989790000 Estimation Done 6 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [374] Nagnath link motor road 0.000 - 0.040 40.000 30.3310000000, 79.2061740000 Estimation Done 6 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [374] Nagnath link motor road 0.100 - 0.130 30.000 30.3308280000, 79.2066880000 Estimation Done 6 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [374] Nagnath link motor road 0.320 - 0.350 30.000 30.3306100000, 79.2097250000 Estimation Done 6 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [374] Nagnath link motor road 0.550 - 0.600 50.000 30.3327520000, 79.2081870000 Estimation Done 5 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [374] Nagnath link motor road 1.520 - 1.550 30.000 30.3288230000, 79.2080520000 Estimation Done 6 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [374] Nagnath link motor road 1.650 - 1.700 50.000 30.3287760000, 79.2070310000 Estimation Done 6 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [375] Jaurasi Hapla Kalsir Dhotidhar motor road 3.150 - 3.225 75.000 30.4251150000, 79.2049290000 Estimation Done 5 DRAIN IS GOOD CONDITION. May 2024
CD Pokhari [375] Jaurasi Hapla Kalsir Dhotidhar motor road 3.525 - 3.575 50.000 30.4288460000, 79.2040360000 Estimation Done 5 DRAIN IS GOOD CONDITION. May 2024
CD Pokhari [375] Jaurasi Hapla Kalsir Dhotidhar motor road 4.350 - 4.400 50.000 30.4285590000, 79.2050960000 Estimation Done 6 DRAIN IS GOOD CONDITION. May 2024
CD Pokhari [375] Jaurasi Hapla Kalsir Dhotidhar motor road 4.625 - 4.700 75.000 30.4293620000, 79.2050830000 Estimation Done 4 DRAIN IS GOOD CONDITION. May 2024
CD Pokhari [375] Jaurasi Hapla Kalsir Dhotidhar motor road 4.875 - 4.950 75.000 30.4280230000, 79.2055840000 Estimation Done 5 DRAIN IS GOOD CONDITION. May 2024
CD Pokhari [375] Jaurasi Hapla Kalsir Dhotidhar motor road 6.425 - 6.475 50.000 30.4356420000, 79.2083720000 Estimation Done 5 DRAIN IS GOOD CONDITION. May 2024
TD Rishikesh [1383] Dharmpur Chauk to bypass Road (Mata Mandir Road) 0.023 -- 30.3028220000, 78.0479350000 NALI (U TYPE) Jan 2024
TD Rishikesh [1383] Dharmpur Chauk to bypass Road (Mata Mandir Road) 0.250 -- 30.3012430000, 78.0465540000 NALI (U TYPE) Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 1.198 - 1.198 0.097 29.9544790000, 79.3102380000 Estimation Done 1 Drain Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 1.876 - 1.878 2.400 29.9571490000, 79.3060570000 Estimation Done 1 RCC Hume Pipe Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 8.324 - 8.324 0.079 29.9470610000, 79.3047710000 Estimation Done 1 cc drain Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 8.767 - 8.767 0.141 29.9492670000, 79.3026410000 Estimation Done 1 cc drain Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 9.813 - 9.813 0.013 29.9478030000, 79.3087900000 Estimation Done 1 drain starting point Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 10.057 - 10.060 2.500 29.4650600000, 79.3091920000 Estimation Done 1 RCC hume pipe Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 10.064 - 10.064 0.036 29.9464360000, 79.3091850000 Estimation Done 1 cc drain Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 10.639 - 10.642 2.500 29.9443930000, 79.3123760000 Estimation Done 1 RCC hume pipe Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 12.169 - 12.172 2.500 29.9447040000, 79.3196070000 Estimation Done 1 RCC hume pipe Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 12.379 - 12.379 0.010 29.9441160000, 79.3210450000 Estimation Done 1 cc drain Jan 2024
CD Gairsain [1732] Bachuwaban Chokhutiya Kunigad motor road 13.730 - 13.733 2.500 29.9440540000, 79.3253770000 Estimation Done 1 rcc hume pipe Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 0.991 - 0.994 2.500 30.0573670000, 79.2898660000 Estimation Done 1 Hume Pipe cross drainage Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 1.142 - 1.145 2.500 30.0586660000, 79.2907710000 Estimation Done 1 Pakka Drain Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 1.349 - 1.349 0.014 30.0586510000, 79.2886860000 Estimation Done 1 Dia Pipe for cross drainage Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 1.672 - 1.672 0.137 30.0602160000, 79.2873150000 Estimation Done 1 Pakka Drain Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 2.984 - 2.987 2.500 30.0698800000, 79.2866300000 Estimation Done 1 Hume Pipe CD Work Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 4.012 - 4.012 0.319 30.0689180000, 79.2819080000 Estimation Done 1 Pakka Drain Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 4.493 - 4.496 2.500 30.0714860000, 79.2808840000 Estimation Done 1 Hume Pipe CD Work Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 4.773 - 4.773 0.185 30.0723990000, 79.2800840000 Estimation Done 1 Pakka Drain Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 6.466 - 6.469 2.500 30.0734480000, 79.2757340000 Estimation Done 1 pakka drain Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 6.863 - 6.863 0.120 30.0744540000, 79.2729380000 Estimation Done 1 pakka drain Jan 2024
CD Gairsain [1733] Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road 7.221 - 7.221 0.093 30.0379100000, 79.2709920000 Estimation Done 1 pakka drain Jan 2024
CD Gairsain [1735] Kargil Shaheed Ranjeet Singh motor road (Ambedkar Gram Ager Jingod motor road) 4.403 - 4.403 0.180 30.0125990000, 79.3013980000 Estimation Done 4 3 pakka drain Jan 2024
CD Gairsain [1735] Kargil Shaheed Ranjeet Singh motor road (Ambedkar Gram Ager Jingod motor road) 5.149 - 5.149 0.046 30.0126080000, 79.2973750000 Estimation Done 1 1 pakka drain Jan 2024
CD Gairsain [1735] Kargil Shaheed Ranjeet Singh motor road (Ambedkar Gram Ager Jingod motor road) 5.232 - 5.232 0.202 30.0133430000, 79.2973630000 Estimation Done 1 1 pakka drain Jan 2024
CD Gairsain [1738] Dhunarghat Soniyana Khatriyana motor road 0.842 -- 30.0443520000, 79.2908000000 pakka drain Jan 2024
CD Gairsain [1738] Dhunarghat Soniyana Khatriyana motor road 0.902 -- 30.0439300000, 79.2912130000 pakka drain Jan 2024
CD Gairsain [1740] Batadhar Nagchulakhal Kunkhet Chhadisain motor road 13.728 - 13.728 0.022 30.0202900000, 79.2673520000 Estimation Done 1 pakka drain Jan 2024
CD Pokhari [1785] Khal Sarmola Rano motor road 0.600 - 0.625 25.000 30.2890560000, 79.1977410000 Estimation Done 6 PUCCADRAIN IS GOOD CONDITION. May 2024
CD Pokhari [1785] Khal Sarmola Rano motor road 1.415 - 1.430 15.000 30.2870580000, 79.2028750000 Estimation Done 6 PUCCADRAIN IS GOOD CONDITION. May 2024
CD Pokhari [1786] Mukhyalay vikaskhand Pokhari motor road 0.000 - 0.100 100.000 30.3438520000, 79.1988970000 Estimation Done 6 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [1786] Mukhyalay vikaskhand Pokhari motor road 0.250 - 0.350 100.000 30.3460130000, 79.1989080000 Estimation Done 5 DRAIN IS IN GOOD CONDITION. Jun 2024
CD Pokhari [1786] Mukhyalay vikaskhand Pokhari motor road 0.380 - 0.480 100.000 30.3458930000, 79.1987580000 Estimation Done 5 DRAIN IS IN GOOD CONDITION. Jun 2024
[1926] Panchpuliya to Upper Market Approach Motor Road 500.000 - 500.025 25.000 30.2611000000, 79.2149860000 Identified 1 Jan 2024
[1926] Panchpuliya to Upper Market Approach Motor Road 1050.000 - 1,050.200 200.000 30.2578830000, 79.2004690000 Identified 1 Jan 2024
CD Nainital [2678] Talla Ramgarh Ratighat motor road. 0.000 -- 29.4465280000, 79.5610830000 Pucca drain K.C. Type (Damaged) Jan 2024
CD Nainital [2678] Talla Ramgarh Ratighat motor road. 1.025 -- 29.4437030000, 79.5535420000 Pucca drain K.C. Type Jan 2024
CD Nainital [2678] Talla Ramgarh Ratighat motor road. 1.725 -- 29.4430610000, 79.5469470000 Pucca drain K.C. Type Jan 2024
CD Nainital [2678] Talla Ramgarh Ratighat motor road. 5.875 -- 29.4555470000, 79.5189500000 Pucca drain K.C. Type Jan 2024
CD Nainital [2678] Talla Ramgarh Ratighat motor road. 6.125 -- 29.4538110000, 79.5167420000 Pucca drain K.C. Type Jan 2024
PMGSY [2680] Nathuwakhan Hartola Jaurasi Roopsingh Dhura Thuwablock Harinagar motor road 0.000 -- 29.4738890000, 79.6055560000 Estimation Done 1 010VR008 Jan 2024
PMGSY [2680] Nathuwakhan Hartola Jaurasi Roopsingh Dhura Thuwablock Harinagar motor road 0.075 -- 29.4744080000, 79.6049830000 Estimation Done 1 Jan 2024
CD Nainital [2682] Ramgarh Malla Dak Bangla Jhutiyaa motor road 0.075 -- 29.4223360000, 79.5290420000 Estimation Done 1 Yet to be allotted Jan 2024
CD Nainital [2682] Ramgarh Malla Dak Bangla Jhutiyaa motor road 0.225 -- 29.4214690000, 79.5512060000 Estimation Done 1 Jan 2024
CD Nainital [2682] Ramgarh Malla Dak Bangla Jhutiyaa motor road 1.450 -- 29.4258360000, 79.5525440000 Estimation Done 1 Jan 2024
CD Nainital [2682] Ramgarh Malla Dak Bangla Jhutiyaa motor road 4.700 -- 29.4358080000, 79.5527000000 Estimation Done 1 Jan 2024
CD Nainital [2682] Ramgarh Malla Dak Bangla Jhutiyaa motor road 5.050 -- 29.4365280000, 79.5512830000 Estimation Done 1 Jan 2024
CD Nainital [2682] Ramgarh Malla Dak Bangla Jhutiyaa motor road 11.400 -- 29.4429780000, 79.5420560000 Estimation Done 1 Jan 2024
CD Nainital [2682] Ramgarh Malla Dak Bangla Jhutiyaa motor road 11.450 -- 29.4428390000, 79.5414970000 Estimation Done 1 Jan 2024
CD Nainital [2682] Ramgarh Malla Dak Bangla Jhutiyaa motor road 11.480 -- 29.4429190000, 79.5409330000 Estimation Done 1 Jan 2024
[2682] Ramgarh Malla Dak Bangla Jhutiyaa motor road 11.530 -- 29.4432280000, 79.5408120000 Estimation Done 1 Jan 2024
CD Nainital [2693] Ramgarh Dak Banglow to Khupa Jamrani motor road 0.000 -- 29.4383330000, 79.5290420000 Estimation Done 1 010VR021 Jan 2024
CD Nainital [2693] Ramgarh Dak Banglow to Khupa Jamrani motor road 0.125 -- 29.4378810000, 79.5523720000 Estimation Done 1 Jan 2024
CD Nainital [2693] Ramgarh Dak Banglow to Khupa Jamrani motor road 0.250 -- 29.4371060000, 79.5530750000 Estimation Done 1 Jan 2024
CD Nainital [2723] Malla Ramgarh to Umagarh motor road. 0.000 -- 29.2538890000, 79.5491670000 Estimation Done 1 010VR051 Jan 2024
CD Ramnagar [2731] Chhoi Jaggannathpur Road 0.000 -- 29.3560694444, 79.1467638889 pucca drain (U Type ) Jan 2024
CD Pauri [3157] Link road of Pokhra to Vishvidhyalaya 0.020 - 0.447 427.000 29.9095000000, 78.9072800000 Estimation Done 4 Jan 2024
CD Pauri [3159] Choubattakhal Dantha motor road 0.000 - 0.150 150.000 29.9560100000, 78.8783270000 Estimation Done 4 Jan 2024
CD Pauri [3159] Choubattakhal Dantha motor road 1.410 - 1.465 55.000 29.9623190000, 78.8838300000 Estimation Done 4 Jan 2024
CD Pauri [3159] Choubattakhal Dantha motor road 2.200 - 2.220 20.000 29.9662722000, 78.8875416000 Estimation Done 4 Jan 2024
CD Pauri [3159] Choubattakhal Dantha motor road 3.540 - 3.617 77.000 29.9696660000, 78.8936910000 Estimation Done 4 Jan 2024
CD Pauri [3159] Choubattakhal Dantha motor road 3.730 - 3.765 35.000 29.9693360000, 78.8950470000 Estimation Done 4 Jan 2024
CD Pauri [3159] Choubattakhal Dantha motor road 6.280 - 6.297 17.000 29.9633861000, 78.9015111000 Estimation Done 4 Jan 2024
CD Pauri [3159] Choubattakhal Dantha motor road 6.730 - 6.751 21.000 29.9657638000, 78.9020111000 Estimation Done 4 Jan 2024
CD Srinagar [3645] Inspection house Srinagar approch road 0.000 - 0.800 800.000 30.2194444400, 78.7930555600 Estimation Done 1 2020-10-10 00:00:00 constructed Jan 2024
CD Srinagar [3647] Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road 18.600 - 19.015 415.000 30.1971130000, 78.6570200000 Estimation Done 0 Jun 2024
CD Srinagar [3647] Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road 23.800 - 23.845 45.000 30.1851830000, 78.6570810000 Estimation Done 0 Jun 2024
CD Srinagar [3647] Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road 24.100 - 24.117 16.800 30.1866220000, 78.6588520000 Estimation Done 0 Jun 2024
CD Srinagar [3649] Pauri Dehlchauri Uflada motor road 8.020 - 8.148 128.000 30.1872220000, 78.7536111000 Estimation Done 1 ok May 2024
CD Srinagar [3649] Pauri Dehlchauri Uflada motor road 8.890 - 8.980 90.000 30.1850000000, 78.7469444400 Estimation Done 1 ok May 2024
CD Srinagar [3649] Pauri Dehlchauri Uflada motor road 24.130 - 24.780 650.000 30.2100000000, 78.7122222000 Estimation Done 1 ok Jun 2024
CD Srinagar [3649] Pauri Dehlchauri Uflada motor road 26.160 - 26.205 45.000 30.2083330000, 78.7288880000 Estimation Done 1 ok Jun 2024
CD Srinagar [3649] Pauri Dehlchauri Uflada motor road 27.480 - 27.595 115.000 30.2097222000, 78.7316666000 Estimation Done 2 ok Jun 2024
CD Srinagar [3649] Pauri Dehlchauri Uflada motor road 28.430 - 28.610 180.000 30.2138890000, 78.7327777000 Estimation Done 1 ok Jun 2024
CD Srinagar [3649] Pauri Dehlchauri Uflada motor road 28.980 - 29.450 470.000 30.2155556000, 78.7283333000 Estimation Done 1 ok Jun 2024
CD Srinagar [3649] Pauri Dehlchauri Uflada motor road 29.770 - 29.970 200.000 30.2208333000, 78.7247222000 Estimation Done 1 ok Jun 2024
CD Srinagar [3670] Shaheed Shiv Singh Gusain motor road (Pharasu Mandoli Chakwali Chaukhal Sweet motor road) 0.000 - 0.600 600.000 30.2305500000, 78.8244540000 Estimation Done 2 ok May 2024
CD Srinagar [3670] Shaheed Shiv Singh Gusain motor road (Pharasu Mandoli Chakwali Chaukhal Sweet motor road) 0.830 - 1.260 430.000 30.2338800000, 78.8269440000 Estimation Done 2 ok May 2024
CD Srinagar [3670] Shaheed Shiv Singh Gusain motor road (Pharasu Mandoli Chakwali Chaukhal Sweet motor road) 1.465 - 1.755 290.000 30.2319440000, 78.8316660000 Estimation Done 2 ok May 2024
CD Srinagar [3694] Harkandi link road 0.345 - 0.410 65.000 30.2054210000, 78.8213040000 Identified 0 Jun 2024
TD Berinaag [3978] From Berinag Vinayak Puranathal Muwani motor road to Chankana motor road 0.275 - 0.275 0.025 29.7769750000, 80.0733360000 Pucca drain (U Type) Jan 2024
PD New Tehri [4004] To Be Deleted 0.000 -- 0.0000000000, 0.0000000000 Identified 0 0 Jan 2024
PD New Tehri [4004] To Be Deleted 0.024 - 0.040 16.000 30.4478500000, 78.4333400000 Estimation Done 1 Pacca Drain (Length 16.00m) Jan 2024
PD New Tehri [4004] To Be Deleted 0.882 - 1.070 187.800 30.4469700000, 78.4422500000 Estimation Done 2 Pacca Drain (Length 187.80m) Jan 2024
PD New Tehri [4004] To Be Deleted 1.215 - 2.543 1328.000 30.4443900000, 78.4419400000 Estimation Done 2 Pacca Drain (Length 1328m) Jan 2024
TD Ghansaali [4082] Thati Kot Ghandiyalsaur motor road 5.920 - 5.945 25.000 30.5941600000, 78.6782300000 Estimation Done 3 0 45W111 Jan 2024
TD Ghansaali [4082] Thati Kot Ghandiyalsaur motor road 10.425 - 10.535 110.000 30.5976440000, 78.6705050000 Estimation Done 3 0 45W111 Jan 2024
TD Ghansaali [4082] Thati Kot Ghandiyalsaur motor road 11.750 - 11.968 218.000 30.5938490000, 78.6595910000 Estimation Done 3 0 45W111 Jan 2024
TD Ghansaali [4082] Thati Kot Ghandiyalsaur motor road 12.100 - 12.197 97.000 30.5956300000, 78.6580700000 Estimation Done 3 0 45W111 Jan 2024
TD Ghansaali [4082] Thati Kot Ghandiyalsaur motor road 12.650 - 12.680 30.000 30.5980600000, 78.6544600000 Estimation Done 3 0 45W111 Jan 2024
CD Badkote [5119] Naugoan Syuri motor road 9.025 - 9.125 100.000 30.7753400000, 78.1463720000 Estimation Done 1 good Jun 2024
CD Badkote [5151] Sunaldi Dandagoan motar road 0.800 -10.000 30.8206210000, 78.2106500000 Estimation Done 1 good Jul 2024
PD Bhatwari [5227] Bhatwari Barsu motor road 1.275 - 1.525 250.000 30.8242270000, 78.6198360000 Estimation Done 0 May 2024
PD Bhatwari [5233] NIM approach Road 0.000 - 0.001 1.125 30.7222788900, 78.5472566700 Estimation Done 0 May 2024
PD Bhatwari [5235] Bonga Bhelura Motor Road 0.050 - 0.950 900.000 30.7450500000, 78.4670055600 Estimation Done 0 May 2024
PD Bhatwari [5235] Bonga Bhelura Motor Road 2.675 - 2.775 100.000 30.7450500000, 78.4670055600 Estimation Done 0 May 2024
PD Bhatwari [5235] Bonga Bhelura Motor Road 3.450 - 3.650 200.000 30.7450500000, 78.4670055600 Estimation Done 0 May 2024
PD Bhatwari [5238] Bhukki-Kujjan-Tihar Motor Road 0.525 - 0.625 100.000 30.8630000000, 78.6498120000 Estimation Done 1 U type drain May 2024
PD Bhatwari [5238] Bhukki-Kujjan-Tihar Motor Road 0.725 - 0.775 50.000 30.8626700000, 78.6498250000 Estimation Done 1 U type May 2024
PD Bhatwari [5238] Bhukki-Kujjan-Tihar Motor Road 0.925 - 0.975 50.000 30.8631460000, 78.6497620000 Estimation Done 1 U type May 2024
PD Bhatwari [5238] Bhukki-Kujjan-Tihar Motor Road 3.000 - 3.050 50.000 30.8564450000, 78.6388060000 Estimation Done 0 May 2024
PD Bhatwari [5238] Bhukki-Kujjan-Tihar Motor Road 3.450 - 3.500 50.000 30.8550670000, 78.6338550000 Estimation Done 0 May 2024
PD Bhatwari [5239] Sangrali motor road 0.000 - 0.050 50.000 30.7528940000, 78.4733770000 Estimation Done 0 PUKKA DRAIN May 2024
PD Bhatwari [5240] Ganeshpur Motor Road 0.000 - 0.050 50.000 30.7528880000, 78.4734330000 Estimation Done 0 ok May 2024
PD Bhatwari [5243] Gangani Bridge to Bhangeli Motor Road 0.400 - 4.400 4000.000 30.8997520000, 78.6773080000 Estimation Done 1 U Drain May 2024
PD Bhatwari [5244] Gangori Uttroin motor road 0.850 -- 30.7675000000, 78.4522222222 Jan 2024
PD Bhatwari [5244] Gangori Uttroin motor road 1.050 -- 30.7690000000, 78.4519444444 Jan 2024
PD Bhatwari [5244] Gangori Uttroin motor road 1.875 -- 30.7749166667, 78.4500916667 open Jan 2024
PD Bhatwari [5244] Gangori Uttroin motor road 2.100 -- 30.7766277778, 78.4505805556 partialy damege Jan 2024
PD Bhatwari [5244] Gangori Uttroin motor road 3.350 -- 30.7850833333, 78.4491111111 partialy damege Jan 2024
PD Bhatwari [5244] Gangori Uttroin motor road 3.675 -- 30.7841111111, 78.4485000000 Jan 2024
PD Bhatwari [5246] Uttarkashi Bypass Motor Road 1.075 - 1.175 100.000 30.7347222000, 78.4113888890 Estimation Done 0 May 2024
PD Bhatwari [5246] Uttarkashi Bypass Motor Road 4.925 - 5.175 250.000 30.7300000000, 78.4438889000 Estimation Done 0 May 2024
PD Bhatwari [5246] Uttarkashi Bypass Motor Road 5.150 - 5.400 250.000 30.7236111100, 78.5437222200 Estimation Done 0 May 2024
PD Bhatwari [5246] Uttarkashi Bypass Motor Road 5.875 - 6.125 250.000 30.7280555560, 78.4452777780 Estimation Done 0 May 2024
PD Bhatwari [5246] Uttarkashi Bypass Motor Road 6.225 - 6.475 250.000 30.7286111100, 78.4383333000 Estimation Done 0 May 2024
PD Bhatwari [5246] Uttarkashi Bypass Motor Road 7.550 - 7.800 250.000 30.7300000000, 78.4436111100 Identified 0 May 2024
PD Bhatwari [5249] Gangori Nald motor road 5.900 - 6.150 250.000 30.3431680000, 78.0206080000 Estimation Done 1 Good Condition May 2024
CD Almora [5646] Itola Kanal Bunga motor road 0.070 - 0.190 120.000 29.6600000000, 79.6335280000 Estimation Done 1 U-Type drain Start (Choked) U-Type drain End (Choked ) Jan 2024
CD Khatima [6655] Road from village Kanjabagh Milk Dairy to Sujiya Maholia 0.060 - 0.160 100.000 28.9314611100, 79.9627969400 Estimation Done 5 Jan 2024
CD Badkote [8040] Badkote to Ponti bridge motor road : . 0.875 - 1.660 785.000 30.8061110000, 78.2000000000 Estimation Done 1 good Jun 2024
PD Bhatwari [8105] Kishanpur link motor Road 3.335 - 3.485 150.000 30.6947710000, 78.4967920000 Identified 0 Jun 2024