NH Ranikhet |
[12]
Jyolikot Almora Karanprayag national highway
|
80.150 - 80.156
|
6.000 |
29.6346450000, 79.6257650000 |
Estimation Done |
8 |
|
|
|
Good condition |
Jun 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
28.100 - 28.120
|
20.000 |
30.6425910000, 78.2339420000 |
Estimation Done |
5 |
|
|
|
delinator is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
28.800 - 28.815
|
15.000 |
30.6470030000, 78.2319870000 |
Estimation Done |
5 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
37.200 - 37.208
|
8.000 |
30.6295810000, 78.2123560000 |
Estimation Done |
5 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
37.400 - 37.412
|
12.000 |
30.6308410000, 78.2112030000 |
Estimation Done |
5 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
37.500 - 37.512
|
12.000 |
30.6309020000, 78.2099120000 |
Treatment in Progress |
8 |
|
|
|
delinator is installed but some are damage |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
37.700 - 37.715
|
15.000 |
30.6314030000, 78.2089190000 |
Treatment in Progress |
6 |
|
|
|
delinator is installed but damage in some quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
38.100 - 38.128
|
28.000 |
30.6319630000, 78.2060930000 |
Estimation Done |
6 |
|
|
|
delinator is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
38.300 - 38.315
|
15.000 |
30.6321730000, 78.2034340000 |
Estimation Done |
6 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
38.700 - 38.712
|
12.000 |
30.6316130000, 78.2002000000 |
Estimation Done |
6 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
39.100 - 39.121
|
21.000 |
30.6304890000, 78.1986180000 |
Identified |
7 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
39.400 - 39.414
|
14.000 |
30.6319170000, 78.1941300000 |
Estimation Done |
6 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
40.600 - 40.615
|
15.000 |
30.6378120000, 78.1942240000 |
Estimation Done |
6 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
40.800 - 40.820
|
20.000 |
30.6383470000, 78.1964080000 |
Estimation Done |
6 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
41.400 - 41.415
|
15.000 |
30.6414620000, 78.1942880000 |
Treatment in Progress |
8 |
|
|
|
delinator is installed but damage |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
50.000 - 50.020
|
20.000 |
30.6340600000, 78.1624950000 |
Estimation Done |
8 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
50.775 - 50.790
|
15.000 |
30.6270600000, 78.1677340000 |
Estimation Done |
8 |
|
|
|
delinator is installed but not in required quantity |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
51.800 - 51.812
|
12.000 |
30.6224340000, 78.1633250000 |
Treatment in Progress |
8 |
|
|
|
delinator is installed but damage |
Jul 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
0.075 - 0.150
|
75.000 |
30.1202170000, 78.8220330000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
1.000 - 1.072
|
72.000 |
30.1267720000, 78.8246680000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
2.250 - 2.332
|
82.000 |
30.1383710000, 78.8277800000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
3.050 - 3.146
|
96.000 |
30.1419397300, 78.8294916200 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
4.250 - 4.350
|
100.000 |
30.1441266600, 78.8369433300 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
5.650 - 5.800
|
150.000 |
30.1472749900, 78.8444400000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
6.600 - 6.720
|
120.000 |
30.1529192700, 78.8527384100 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
13.080 - 13.180
|
100.000 |
30.1742792800, 78.8764122500 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
13.225 - 13.300
|
75.000 |
30.1734670000, 78.8766440000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
14.525 - 14.575
|
50.000 |
30.1750750000, 78.8713610000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
14.750 - 14.800
|
50.000 |
30.1752560000, 78.8698140000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
14.925 - 15.000
|
75.000 |
30.1753310000, 78.8674140000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.000 - 15.050
|
50.000 |
30.1744030000, 78.8669920000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.275 - 15.299
|
24.000 |
30.1745440000, 78.8678330000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.375 - 15.455
|
80.000 |
30.1747080000, 78.8644000000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.600 - 15.675
|
75.000 |
30.1761720000, 78.8638080000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.000 - 35.855
|
855.000 |
30.3705140000, 79.1101700000 |
Estimation Done |
5 |
|
|
|
171 NO DELINEATOR. |
May 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.750 - 35.885
|
135.000 |
30.3755260000, 79.1090500000 |
Estimation Done |
4 |
2024-03-14 00:00:00 |
|
|
27 NO DELINEATOR. |
May 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.925 - 36.000
|
75.000 |
30.3757950000, 79.1105000000 |
Estimation Done |
4 |
2024-03-15 00:00:00 |
|
|
15 NO DELINEATOR. |
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
4.400
|
0.000 |
30.7222283300, 78.4452944400 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
4.500
|
0.000 |
30.7216194400, 78.4454111100 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
4.575
|
0.000 |
30.7208083300, 78.4459861100 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
4.725
|
0.000 |
30.7195388900, 78.4470555600 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
4.850
|
0.000 |
30.7195388900, 78.4470555600 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
5.325
|
0.000 |
30.7177222200, 78.4514527800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
5.650
|
0.000 |
30.7167361100, 78.4520305600 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
5.675
|
0.000 |
30.7155138900, 78.4535138900 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
6.400
|
0.000 |
30.7112972200, 78.4587750000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
6.975
|
-- |
30.7093055600, 78.4614500000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
7.075
|
0.000 |
30.7084944400, 78.4616250000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
7.275
|
0.000 |
30.7077527800, 78.4626027800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
7.450
|
0.000 |
30.7074694400, 78.4638416700 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
7.750
|
0.000 |
30.7079083300, 78.4656333300 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
7.975
|
0.000 |
30.7067472200, 78.4686694400 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
8.275
|
0.000 |
30.7047361100, 78.4683750000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
8.975
|
0.000 |
30.7035388900, 78.4717916700 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
9.150
|
0.000 |
30.7033638900, 78.4735416700 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
9.775
|
0.000 |
30.7022000000, 78.4755500000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
10.050
|
0.000 |
30.7009861100, 78.4768277800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
10.625
|
0.000 |
30.6985861100, 78.4816583300 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
11.225
|
0.000 |
30.6960000000, 78.4849361100 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
11.525
|
0.000 |
30.6957555600, 78.4877500000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
11.625
|
0.000 |
30.6975556000, 78.4877500000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
11.800
|
0.000 |
30.6945472200, 78.4899138900 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
12.400
|
0.000 |
30.6924722220, 78.4846027800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
12.900
|
0.000 |
30.6898750000, 78.4838583300 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
13.175
|
0.000 |
30.6905250000, 78.4829500000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
13.675
|
-- |
30.6919694400, 78.4779777800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
13.750
|
0.000 |
30.6919694400, 78.4779777800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
13.875
|
0.000 |
30.6919694400, 78.4779777800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
14.075
|
0.000 |
30.6915388900, 78.4762666700 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
14.200
|
0.000 |
30.6913916700, 78.4753222200 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
14.875
|
0.000 |
30.6930055600, 78.4700527800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
14.975
|
0.000 |
30.6928833300, 78.4683583300 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
15.150
|
0.000 |
30.6928166700, 78.4677416700 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
15.525
|
0.000 |
30.6936638900, 78.4655888900 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
15.825
|
0.000 |
30.6939944400, 78.4635638900 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
15.900
|
-- |
30.6936111100, 78.4613138900 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
0.050 - 0.100
|
50.000 |
30.1785840000, 78.8615150000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
0.350 - 0.500
|
150.000 |
30.1813080000, 78.8612160000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
0.550 - 0.650
|
100.000 |
30.1802170000, 78.8600700000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
0.800 - 0.950
|
150.000 |
30.1795330000, 78.8604480000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
1.020 - 1.120
|
100.000 |
30.1784270000, 78.8602370000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
1.250 - 1.330
|
80.000 |
30.1769120000, 78.8601140000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
1.500 - 1.580
|
80.000 |
30.1781040000, 78.8591550000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
1.775 - 1.835
|
60.000 |
30.1792160000, 78.8572460000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
2.100 - 2.190
|
90.000 |
30.1772650000, 78.8568880000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
2.425 - 2.485
|
60.000 |
30.1754070000, 78.8553030000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
2.625 - 2.665
|
40.000 |
30.1763210000, 78.8548220000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
2.925 - 2.995
|
70.000 |
30.1778870000, 78.8532150000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
3.075 - 3.105
|
30.000 |
30.1783330000, 78.8519440000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
3.225 - 3.250
|
25.000 |
30.1782710000, 78.8515400000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
3.550 - 3.580
|
30.000 |
30.1793140000, 78.8510750000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
3.875 - 3.910
|
35.000 |
30.1812670000, 78.8533960000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
4.025 - 4.045
|
20.000 |
30.1828330000, 78.8525390000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
4.275 - 4.335
|
60.000 |
30.1844300000, 78.8526880000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
4.750 - 4.790
|
40.000 |
30.1845180000, 78.8521680000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
4.900 - 4.960
|
60.000 |
30.1875890000, 78.8566250000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
5.020 - 5.040
|
20.000 |
30.1890490000, 78.8509250000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
5.225 - 5.260
|
35.000 |
30.1905290000, 78.8507990000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
5.425 - 5.475
|
50.000 |
30.1914450000, 78.8528830000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
5.825 - 5.885
|
60.000 |
30.1936410000, 78.8522460000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
6.000 - 6.080
|
80.000 |
30.1948450000, 78.8513980000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
6.150 - 6.230
|
80.000 |
30.1959980000, 78.8492140000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
6.775 - 6.835
|
60.000 |
30.1973140000, 78.8486620000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
7.125 - 7.245
|
120.000 |
30.1995930000, 78.8486210000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
7.300 - 7.390
|
90.000 |
30.2024100000, 78.8776260000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
7.425 - 7.515
|
90.000 |
30.2039350000, 78.8479880000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
7.775 - 7.895
|
120.000 |
30.2047780000, 78.8499630000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
8.050 - 8.170
|
120.000 |
30.2050220000, 78.8499360000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
8.295 - 8.375
|
80.000 |
30.2080150000, 78.8508130000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
8.500 - 8.575
|
75.000 |
30.2091230000, 78.8520550000 |
Sanctioned |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
8.800 - 8.865
|
65.000 |
30.2107960000, 78.8531910000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
9.020 - 9.110
|
90.000 |
30.2118020000, 78.8527440000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
9.225 - 9.345
|
120.000 |
30.2125140000, 78.8511370000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
9.525 - 9.615
|
90.000 |
30.2125100000, 78.8489510000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
9.950 - 10.060
|
110.000 |
30.2106940000, 78.8461760000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
10.050 - 10.170
|
120.000 |
30.2103390000, 78.8457160000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
10.400 - 10.500
|
100.000 |
30.2102740000, 78.8416960000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
11.125 - 11.215
|
90.000 |
30.2084570000, 78.8376600000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
11.550 - 11.635
|
85.000 |
30.2081560000, 78.8351560000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
12.350 - 12.470
|
120.000 |
30.2096420000, 78.8293450000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
14.200 - 14.400
|
200.000 |
30.2133680000, 78.8174050000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
14.600 - 14.720
|
120.000 |
30.2132920000, 78.8161720000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
15.050 - 15.160
|
110.000 |
30.2110710000, 78.8122360000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
15.900 - 16.000
|
100.000 |
30.2110790000, 78.8087120000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
16.575 - 16.675
|
100.000 |
30.2113440000, 78.7996100000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
16.725 - 16.835
|
110.000 |
30.2114040000, 78.7966220000 |
Sanctioned |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
17.075 - 17.205
|
130.000 |
30.2111240000, 78.7934690000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
17.500 - 17.635
|
135.000 |
30.2131420000, 78.8017000000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
18.300 - 18.410
|
110.000 |
30.2159340000, 78.7888240000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
19.400 - 19.460
|
60.000 |
30.2125720000, 78.7920980000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
20.225 - 20.305
|
80.000 |
30.2138780000, 78.7991780000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
20.400 - 20.480
|
80.000 |
30.2141470000, 78.8023930000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
20.925 - 20.985
|
60.000 |
30.2144560000, 78.8049070000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
21.070 - 21.110
|
40.000 |
30.2146360000, 78.8071390000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
21.225 - 21.285
|
60.000 |
30.2151590000, 78.8085260000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
21.575 - 21.665
|
90.000 |
30.2151400000, 78.8082400000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
21.680 - 21.760
|
80.000 |
30.2150210000, 78.8669730000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
22.100 - 22.190
|
90.000 |
30.2153280000, 78.8037480000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
22.225 - 22.285
|
60.000 |
30.2153050000, 78.8023010000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
22.575 - 22.655
|
80.000 |
30.2152680000, 78.8005300000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
22.875 - 22.915
|
40.000 |
30.2154830000, 78.7966780000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
23.050 - 23.100
|
50.000 |
30.2170900000, 78.7972820000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
23.200 - 23.290
|
90.000 |
30.2180470000, 78.7960100000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
23.350 - 23.410
|
60.000 |
30.2178340000, 78.7949150000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
23.500 - 23.560
|
60.000 |
30.2181590000, 78.7942510000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
23.850 - 23.900
|
50.000 |
30.2191520000, 78.7916550000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
24.150 - 24.210
|
60.000 |
30.2204380000, 78.7881510000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
24.600 - 24.670
|
70.000 |
30.2213210000, 78.7846260000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
4.550 - 4.560
|
10.000 |
30.3247940000, 79.1965530000 |
Treatment in Progress |
2 |
|
|
|
03 NO DELINEATOR IS DAMAGED. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
5.370 - 5.390
|
20.000 |
30.3234680000, 79.2033110000 |
Estimation Done |
6 |
|
|
|
05 NO DELINEATORS IN 03 NO DAMAGED. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
7.175 - 7.195
|
20.000 |
30.3152560000, 79.2026870000 |
Treatment in Progress |
5 |
|
|
|
08 NO DELINEATORS IN 05 NO DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
7.850 - 7.890
|
40.000 |
30.3112480000, 79.2013400000 |
Treatment in Progress |
6 |
|
|
|
21 NO DELINEATORS IN 16 NO DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
7.955 - 7.968
|
13.000 |
30.3100260000, 79.2008780000 |
Treatment in Progress |
5 |
|
|
|
07 NO DELINEATORS IS DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
8.010 - 8.025
|
15.000 |
30.3101230000, 79.2008020000 |
Estimation Done |
4 |
|
|
|
08 NO DELINEATORS. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
8.300 - 8.310
|
10.000 |
30.3083400000, 79.1994950000 |
Treatment in Progress |
6 |
|
|
|
05 NO DELINEATOR IS DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
8.410 - 8.420
|
10.000 |
30.3078260000, 79.2004980000 |
Estimation Done |
5 |
|
|
|
03 NO DELINEATORS. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
8.420 - 8.450
|
30.000 |
30.3078320000, 79.2006180000 |
Estimation Done |
5 |
|
|
|
14 NO DELINEATORS IN 06 NO PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
8.715 - 8.730
|
15.000 |
30.3062670000, 79.2023140000 |
Estimation Done |
6 |
|
|
|
06 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
8.820 - 8.890
|
70.000 |
30.3060580000, 79.2030220000 |
Estimation Done |
6 |
|
|
|
28 NO DELINEATORS. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
8.925 - 8.975
|
50.000 |
30.3057370000, 79.2041250000 |
Estimation Done |
6 |
|
|
|
06 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
8.980 - 9.050
|
70.000 |
30.3052150000, 79.2045510000 |
Estimation Done |
6 |
|
|
|
08 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
9.110 - 9.140
|
30.000 |
30.3044980000, 79.2039510000 |
Estimation Done |
4 |
|
|
|
06 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
9.190 - 9.205
|
15.000 |
30.3037500000, 79.2039150000 |
Estimation Done |
4 |
|
|
|
05 NO DELINEATORS. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
9.610 - 9.720
|
110.000 |
30.3009020000, 79.2047420000 |
Estimation Done |
4 |
|
|
|
27 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
10.640 - 10.670
|
30.000 |
30.2954160000, 79.2033050000 |
Estimation Done |
4 |
|
|
|
12 NO DELINEATORS. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
10.790 - 10.797
|
7.000 |
30.2942080000, 79.2035100000 |
Estimation Done |
5 |
|
|
|
03 NO PARAPET IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
10.930 - 10.950
|
20.000 |
30.2930670000, 79.2035840000 |
Estimation Done |
5 |
|
|
|
06 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
11.200 - 11.275
|
75.000 |
30.2907510000, 79.2038760000 |
Estimation Done |
6 |
|
|
|
17 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
11.320 - 11.330
|
10.000 |
30.2900530000, 79.2035970000 |
Estimation Done |
6 |
|
|
|
05 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
11.460 - 11.485
|
25.000 |
30.2905520000, 79.2016270000 |
Estimation Done |
5 |
|
|
|
07 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
11.550 - 11.570
|
20.000 |
30.2899490000, 79.2014550000 |
Estimation Done |
6 |
|
|
|
07 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
11.590 - 11.630
|
40.000 |
30.2896880000, 79.2011550000 |
Estimation Done |
6 |
|
|
|
09 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
11.680 - 11.710
|
30.000 |
30.2891180000, 79.2018120000 |
Estimation Done |
6 |
|
|
|
06 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
11.790 - 11.810
|
20.000 |
30.2887040000, 79.2029850000 |
Estimation Done |
5 |
|
|
|
07 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
11.925 - 11.960
|
35.000 |
30.2875890000, 79.2038480000 |
Estimation Done |
6 |
|
|
|
08 NO DELINEATORS ARE PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
13.050 - 13.075
|
25.000 |
30.2819950000, 79.2109240000 |
Estimation Done |
2 |
|
|
|
05 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
15.100 - 15.125
|
25.000 |
30.2838610000, 79.2111000000 |
Estimation Done |
2 |
|
|
|
06 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
15.750 - 15.770
|
20.000 |
30.2828940000, 79.2164630000 |
Estimation Done |
4 |
|
|
|
05 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
15.950 - 15.980
|
30.000 |
30.2833130000, 79.2183990000 |
Estimation Done |
2 |
|
|
|
07 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
15.975 - 16.015
|
40.000 |
30.2833790000, 79.2188370000 |
Estimation Done |
2 |
|
|
|
08 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
16.500 - 16.525
|
25.000 |
30.2828120000, 79.2233300000 |
Estimation Done |
3 |
|
|
|
05 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
17.200 - 17.215
|
15.000 |
30.2802180000, 79.2259500000 |
Estimation Done |
5 |
|
|
|
04 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
17.900 - 17.920
|
20.000 |
30.2767490000, 79.2201370000 |
Estimation Done |
4 |
|
|
|
05 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
19.075 - 19.100
|
25.000 |
30.2709770000, 79.2143940000 |
Estimation Done |
4 |
|
|
|
06 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
19.300 - 19.330
|
30.000 |
30.2706890000, 79.2130420000 |
Estimation Done |
6 |
|
|
|
06 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
19.550 - 19.585
|
35.000 |
30.2709600000, 79.2128790000 |
Estimation Done |
3 |
|
|
|
10 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
19.700 - 19.725
|
25.000 |
30.2698550000, 79.2135250000 |
Estimation Done |
4 |
|
|
|
09 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
21.300 - 21.312
|
12.000 |
30.2746480000, 79.2214900000 |
Estimation Done |
6 |
|
|
|
06 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
23.525 - 23.533
|
8.000 |
30.2715340000, 79.2220230000 |
Estimation Done |
3 |
|
|
|
03 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
23.975 - 24.000
|
25.000 |
30.2677610000, 79.2191860000 |
Estimation Done |
4 |
|
|
|
14 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
24.875 - 24.890
|
15.000 |
30.2669780000, 79.2180350000 |
Estimation Done |
4 |
|
|
|
05 NO DELINEATORS. |
May 2024 |
CD Gairsain |
[363]
Bungidhar Mehalchori Bachuwaban Talwari motor road
|
1.294 - 1.294
|
0.020 |
29.9728510000, 79.4140840000 |
Estimation Done |
1 |
|
|
1 |
dailenatore |
Jan 2024 |
CD Gairsain |
[363]
Bungidhar Mehalchori Bachuwaban Talwari motor road
|
3.766 - 3.766
|
0.038 |
29.9772280000, 79.4216160000 |
Estimation Done |
2 |
|
|
1 |
dailinator |
Jan 2024 |
CD Gairsain |
[363]
Bungidhar Mehalchori Bachuwaban Talwari motor road
|
3.931 - 3.931
|
0.034 |
29.9763020000, 79.4210970000 |
Estimation Done |
1 |
|
|
1 |
dailinator |
Jan 2024 |
CD Gairsain |
[363]
Bungidhar Mehalchori Bachuwaban Talwari motor road
|
5.202 - 5.202
|
0.054 |
29.9693430000, 79.4233500000 |
Estimation Done |
1 |
|
|
1 |
dailinator |
Jan 2024 |
CD Gairsain |
[363]
Bungidhar Mehalchori Bachuwaban Talwari motor road
|
6.075 - 6.075
|
0.033 |
29.9670950000, 79.4312800000 |
Estimation Done |
1 |
|
|
1 |
dailinator |
Jan 2024 |
CD Pokhari |
[375]
Jaurasi Hapla Kalsir Dhotidhar motor road
|
0.000 - 0.050
|
50.000 |
30.4142190000, 79.2072720000 |
Estimation Done |
4 |
|
|
|
25 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[375]
Jaurasi Hapla Kalsir Dhotidhar motor road
|
0.100 - 0.150
|
50.000 |
30.4143230000, 79.2079770000 |
Estimation Done |
4 |
|
|
|
11 NO DELINEATORS. |
May 2024 |
CD Pokhari |
[375]
Jaurasi Hapla Kalsir Dhotidhar motor road
|
1.225 - 1.258
|
33.000 |
30.4165850000, 79.2135870000 |
Estimation Done |
3 |
|
|
|
11 NO DELINEATORS. |
May 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
0.000 - 0.050
|
50.000 |
30.1692030000, 78.8689320000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
0.150 - 0.375
|
225.000 |
30.1691280000, 78.8702950000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
0.425 - 0.750
|
325.000 |
30.1685030000, 78.8687450000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
0.975 - 1.025
|
50.000 |
30.1690280000, 78.8730680000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
1.300 - 1.450
|
150.000 |
30.1711440000, 78.8739850000 |
Treatment in Progress |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
1.550 - 1.675
|
125.000 |
30.1712230000, 78.8760420000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
1.800 - 1.825
|
25.000 |
30.1705260000, 78.8778320000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
1.975 - 2.125
|
150.000 |
30.1701810000, 78.8783200000 |
Treatment in Progress |
7 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
2.225 - 2.350
|
125.000 |
30.1702110000, 78.8813290000 |
Treatment in Progress |
7 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
2.425 - 2.600
|
175.000 |
30.1698350000, 78.8812230000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
2.925 - 3.050
|
125.000 |
30.1689290000, 78.8789560000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
3.175 - 3.250
|
75.000 |
30.1687430000, 78.8813190000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
4.600 - 4.850
|
250.000 |
30.1737780000, 78.8908460000 |
Treatment in Progress |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
5.050 - 5.150
|
100.000 |
30.1731340000, 78.8947400000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
5.525 - 5.600
|
75.000 |
30.1748400000, 78.8986480000 |
Treatment in Progress |
7 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
5.850 - 5.950
|
100.000 |
30.1756500000, 78.9015980000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
6.325 - 6.600
|
275.000 |
30.1766600000, 78.9050070000 |
Treatment in Progress |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
6.725 - 7.125
|
400.000 |
30.1738840000, 78.9065020000 |
Treatment in Progress |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
7.300 - 7.400
|
100.000 |
30.1709570000, 78.9078160000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
7.700 - 7.925
|
225.000 |
30.1691350000, 78.9077960000 |
Treatment in Progress |
8 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
8.325 - 8.475
|
150.000 |
30.1733700000, 78.9106120000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
8.725 - 9.125
|
400.000 |
30.1750010000, 78.9093530000 |
Treatment in Progress |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
9.625 - 10.025
|
400.000 |
30.1793280000, 78.9129970000 |
Treatment in Progress |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
10.600 - 10.700
|
100.000 |
30.1798820000, 78.9209250000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
10.975 - 11.275
|
300.000 |
30.1800910000, 78.9236770000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
11.325 - 11.525
|
200.000 |
30.1798060000, 78.9271890000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
11.525 - 11.775
|
250.000 |
30.1801810000, 78.9287110000 |
Treatment in Progress |
8 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
12.250 - 12.425
|
175.000 |
30.1785850000, 78.9349060000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
12.925 - 13.025
|
100.000 |
30.1762360000, 78.9396840000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
13.325 - 13.425
|
100.000 |
30.1768610000, 78.9436350000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
13.550 - 13.675
|
125.000 |
30.1760440000, 78.9453990000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
14.475 - 14.800
|
325.000 |
30.1747270000, 78.9522270000 |
Treatment in Progress |
8 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
14.975 - 15.075
|
100.000 |
30.1720470000, 78.9534720000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
15.275 - 15.525
|
250.000 |
30.1735002000, 78.9560180000 |
Treatment in Progress |
7 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
15.675 - 15.800
|
125.000 |
30.1747670000, 78.9576430000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
15.875 - 16.100
|
225.000 |
30.1759260000, 78.9584800000 |
Treatment in Progress |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
18.075 - 18.825
|
750.000 |
30.1793230000, 78.9659440000 |
Treatment in Progress |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[472]
Khirsu Phutundi Hariyali Adibadri motor road
|
19.100 - 19.850
|
750.000 |
30.1766880000, 78.9728580000 |
Treatment in Progress |
7 |
|
|
|
|
Jun 2024 |
TD Chakrata |
[1146]
Kanda Birnad motor road
|
0.480
|
-- |
30.9072520000, 77.8432610000 |
|
|
|
|
|
75.00 mtr Delineator |
Jan 2024 |
TD Chakrata |
[1146]
Kanda Birnad motor road
|
1.280
|
-- |
30.9029750000, 77.8470940000 |
|
|
|
|
|
50.00 mtr Delineator |
Jan 2024 |
CD Gairsain |
[1738]
Dhunarghat Soniyana Khatriyana motor road
|
0.479
|
-- |
30.0457050000, 79.2918940000 |
|
|
|
|
|
Hume pipe for CD |
Jan 2024 |
CD Gairsain |
[1738]
Dhunarghat Soniyana Khatriyana motor road
|
0.990
|
-- |
30.0431070000, 79.2915060000 |
|
|
|
|
|
Hume pipe for CD |
Jan 2024 |
CD Srinagar |
[3645]
Inspection house Srinagar approch road
|
0.600 - 0.630
|
30.000 |
30.2194444400, 78.7930555600 |
Estimation Done |
1 |
2020-10-10 00:00:00 |
|
|
installed |
Jan 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
6.740 - 6.760
|
20.000 |
30.1830556000, 78.7480555500 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
7.130 - 7.150
|
20.000 |
30.1825000000, 78.7480555500 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
7.280 - 7.310
|
30.000 |
30.1833330000, 78.7488888800 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
7.470 - 7.490
|
20.000 |
30.1847222000, 78.7497222000 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
7.560 - 7.594
|
34.000 |
30.1852778000, 78.7505555000 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
8.370 - 8.386
|
16.000 |
30.1866667000, 78.7511111000 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
8.600 - 8.636
|
36.000 |
30.1861111000, 78.7491666600 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
8.730 - 8.742
|
12.000 |
30.1858333000, 78.7480555550 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
8.825 - 8.857
|
32.000 |
30.1855556000, 78.7472222000 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
13.300 - 13.360
|
60.000 |
30.1677778000, 78.7302777700 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
13.400 - 13.420
|
20.000 |
30.1677770000, 78.7294444000 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
13.980 - 14.030
|
50.000 |
30.1719444000, 78.7277770000 |
Estimation Done |
1 |
|
|
|
ok |
May 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
14.350 - 14.362
|
12.000 |
30.1733333000, 78.7250000000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
14.490 - 14.502
|
12.000 |
30.1738889000, 78.7241666600 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
14.550 - 14.562
|
12.000 |
30.1747220000, 78.7241666600 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
14.800 - 14.820
|
20.000 |
30.1758333300, 78.7227777000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
14.920 - 14.984
|
64.000 |
30.1761111000, 78.7225000000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
15.050 - 15.080
|
30.000 |
30.1763889000, 78.7216666000 |
Estimation Done |
1 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
15.160 - 15.180
|
20.000 |
30.1772222000, 78.7211111000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
15.350 - 15.360
|
10.000 |
30.1773778000, 78.7222222000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
15.720 - 15.736
|
16.000 |
30.1794444000, 78.7197222200 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
16.520 - 16.536
|
16.000 |
30.1833333300, 78.7219444400 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
16.790 - 16.820
|
30.000 |
30.1825000000, 78.7197222200 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
17.280 - 17.310
|
30.000 |
30.1825000000, 78.7158333300 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
17.600 - 17.630
|
30.000 |
30.1844440000, 78.7138888000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
17.890 - 17.906
|
16.000 |
30.1858333300, 78.7119444400 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.000 - 19.020
|
20.000 |
30.1908333000, 78.7041666600 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.120 - 19.136
|
16.000 |
30.1916667000, 78.7044444000 |
Estimation Done |
1 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.520 - 19.536
|
16.000 |
30.1941667000, 78.7041666600 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.110 - 20.136
|
26.000 |
30.1955556000, 78.7058333300 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.240 - 20.270
|
30.000 |
30.1961111000, 78.7069444400 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.100 - 21.150
|
50.000 |
30.1955556000, 78.7125000000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.320 - 24.360
|
40.000 |
30.2105556000, 78.7141666000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.340 - 24.390
|
50.000 |
30.2102778000, 78.7130555000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.410 - 25.060
|
650.000 |
30.2100000000, 78.7142222000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
25.210 - 25.300
|
90.000 |
30.2097222000, 78.7205555000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
25.400 - 25.650
|
250.000 |
30.2100000000, 78.7222222000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
25.720 - 26.440
|
720.000 |
30.2100000000, 78.7250000000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
26.650 - 26.860
|
210.000 |
30.2097222000, 78.7308333000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
26.960 - 27.040
|
80.000 |
30.2119444000, 78.7313888000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.110 - 27.210
|
100.000 |
30.2127780000, 78.7313888000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.445 - 27.615
|
170.000 |
30.2116667000, 78.7316666000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.730 - 27.850
|
120.000 |
30.2086111000, 78.7322222000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.940 - 28.070
|
130.000 |
30.2100000000, 78.7319444000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
28.170 - 28.250
|
80.000 |
30.2116667000, 78.7325000000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
28.610 - 28.700
|
90.000 |
30.2147222000, 78.7313888000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
31.280 - 31.320
|
40.000 |
30.2286111000, 78.7155555000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.870 - 1.065
|
195.000 |
30.4467500000, 78.4421000000 |
Estimation Done |
5 |
|
|
|
Delineator (Length 195.00m.) |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.317 - 1.513
|
196.000 |
30.4437200000, 78.4422000000 |
Estimation Done |
5 |
|
|
|
Delineator (Length 196.00m.) |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.629 - 1.640
|
11.000 |
30.4456500000, 78.4429000000 |
Estimation Done |
5 |
|
|
|
Delineator (Length 11.00m.) |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.718 - 1.743
|
25.000 |
30.4462100000, 78.4435000000 |
Estimation Done |
5 |
|
|
|
Delineator (Length 25.00m.) |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.721 - 1.756
|
35.000 |
30.4470400000, 78.4438400000 |
Estimation Done |
5 |
|
|
|
Delineator (Length 35.00m.) |
Jan 2024 |
|
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.823 - 1.981
|
158.000 |
30.4462100000, 78.4435000000 |
Estimation Done |
5 |
|
|
|
Delineator (Length 158.00m.) |
Jan 2024 |
|
[4004]
Dobra Bridge Heavy vehicle approach road
|
2.034 - 2.043
|
9.000 |
30.4488900000, 78.4435400000 |
Estimation Done |
5 |
|
|
|
Delineator (Length 9.00m.) |
Jan 2024 |
|
[4004]
Dobra Bridge Heavy vehicle approach road
|
2.128 - 2.302
|
174.000 |
30.4488900000, 78.4435400000 |
Estimation Done |
5 |
|
|
|
Delineator (Length 174.00m.) |
Jan 2024 |
|
[4004]
Dobra Bridge Heavy vehicle approach road
|
2.369 - 2.472
|
103.000 |
30.4519000000, 78.4451600000 |
Estimation Done |
5 |
|
|
|
Delineator (Length 103.00m.) |
Jan 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
0.000
|
0.000 |
30.8325620000, 78.6227180000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
0.325
|
0.000 |
30.8305290000, 78.6211950000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
0.500
|
0.000 |
30.8294970000, 78.6199790000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
1.000
|
0.000 |
30.8264920000, 78.6169160000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
1.275
|
0.000 |
30.8242270000, 78.6198360000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
1.475
|
0.000 |
30.8259790000, 78.6167650000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
1.775
|
0.000 |
30.8280670000, 78.6158950000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
2.175
|
0.000 |
30.8303800000, 78.6171790000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
2.275
|
0.000 |
30.8304380000, 78.6175590000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
2.375
|
0.000 |
30.8316290000, 78.6184870000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
2.625
|
0.000 |
30.8328680000, 78.6196400000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
2.750
|
0.000 |
30.8334040000, 78.6200690000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
2.850
|
0.000 |
30.8346620000, 78.6191640000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
2.975
|
0.000 |
30.8346880000, 78.6191930000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
3.100
|
0.000 |
30.8338340000, 78.6189520000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
3.200
|
0.000 |
30.8329830000, 78.6191450000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
3.250
|
0.000 |
30.8324950000, 78.6191220000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
3.400
|
0.000 |
30.8287050000, 78.6184170000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
3.650
|
0.000 |
30.8316720000, 78.6174520000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
3.750
|
0.000 |
30.8311520000, 78.6155890000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
3.800
|
0.000 |
30.8307730000, 78.6153270000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
3.950
|
0.000 |
30.8300860000, 78.6138040000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
4.200
|
0.000 |
30.8295670000, 78.6111590000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
4.450
|
0.000 |
30.8298070000, 78.6125090000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
4.550
|
0.000 |
30.8298940000, 78.6127000000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
5.325
|
0.000 |
30.8349580000, 78.6166190000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
5.375
|
0.000 |
30.8354320000, 78.6167050000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
5.550
|
0.000 |
30.8367570000, 78.6162620000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
5.825
|
0.000 |
30.8383500000, 78.6173860000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
6.125
|
0.000 |
30.8400420000, 78.6197740000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
6.225
|
0.000 |
30.8404930000, 78.6205360000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
6.525
|
0.000 |
30.8423940000, 78.6218560000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
7.125
|
0.000 |
30.8423620000, 78.6187750000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
7.650
|
0.000 |
30.8426160000, 78.6132080000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
7.725
|
0.000 |
30.8423130000, 78.6118310000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
7.800
|
0.000 |
30.8427480000, 78.6131940000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
7.875
|
0.000 |
30.8423230000, 78.6116520000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
7.950
|
0.000 |
30.8415350000, 78.6099250000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5233]
NIM approach Road
|
0.950
|
0.000 |
30.7579722200, 78.4799361100 |
Estimation Done |
0 |
|
|
|
50 Nos |
May 2024 |
PD Bhatwari |
[5233]
NIM approach Road
|
1.875
|
0.000 |
30.7220500000, 78.4316638900 |
Estimation Done |
0 |
|
|
|
50 Nos |
May 2024 |
PD Bhatwari |
[5235]
Bonga Bhelura Motor Road
|
0.150
|
0.000 |
30.7067277800, 78.3678388900 |
Estimation Done |
0 |
|
|
|
232 Nos |
Jun 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.025
|
0.000 |
30.8617760000, 78.6494440000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.075
|
0.000 |
30.8616160000, 78.6492560000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.175
|
0.000 |
30.8615280000, 78.6490800000 |
Estimation Done |
1 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.300
|
0.000 |
30.8624910000, 78.6489840000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.450
|
0.000 |
30.8624340000, 78.6489560000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.625
|
0.000 |
30.8611660000, 78.6477960000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
2.000
|
0.000 |
30.8590480000, 78.6445520000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
2.275
|
0.000 |
30.8584960000, 78.6426960000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
2.650
|
0.000 |
30.8585480000, 78.6419050000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5245]
Maneri Jakhol Motor Road
|
0.025 - 0.045
|
20.000 |
30.7648350000, 78.5898290000 |
Estimation Done |
0 |
|
|
|
ok |
May 2024 |
PD Bhatwari |
[8023]
Mala Bhelatipri saura sari motor road
|
1.400 - 1.500
|
100.000 |
30.7809160000, 78.6148840000 |
Estimation Done |
0 |
|
|
|
ok |
May 2024 |