NH Ranikhet |
[12]
Jyolikot Almora Karanprayag national highway
|
80.510
|
0.000 |
29.6352700000, 79.6253900000 |
Estimation Done |
8 |
|
|
|
Good condition |
Jun 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
28.900
|
0.000 |
30.6470510000, 78.2306940000 |
Estimation Done |
6 |
|
|
|
cautionary board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
31.200
|
0.000 |
30.6460830000, 78.2176630000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
34.750
|
0.000 |
30.6410000000, 78.2135590000 |
Estimation Done |
6 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
35.850
|
0.000 |
30.6292400000, 78.2155170000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
36.900
|
0.000 |
30.6292400000, 78.2155170000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
37.200
|
0.000 |
30.6299810000, 78.2123560000 |
Estimation Done |
5 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
37.500
|
0.000 |
30.6309020000, 78.2099120000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
39.100
|
0.000 |
30.6312210000, 78.1970350000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
39.600
|
0.000 |
30.6322800000, 78.1935470000 |
Estimation Done |
5 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
41.100
|
0.000 |
30.6400180000, 78.1956260000 |
Sanctioned |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
41.400
|
0.000 |
30.6414620000, 78.1942880000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
41.700
|
0.000 |
30.6435950000, 78.1944440000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
44.200
|
0.000 |
30.6500290000, 78.1781140000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
44.700
|
0.000 |
30.6462560000, 78.1790970000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
45.000
|
0.000 |
30.6447680000, 78.1804010000 |
Estimation Done |
7 |
|
|
|
board is installed |
Jul 2024 |
CD Uttarkashi |
[27]
Badethi Banchora Bhadrigad state highway
|
47.150
|
0.000 |
30.6358920000, 78.1755340000 |
Estimation Done |
0 |
|
|
|
board is installed |
Jul 2024 |
PD Ranikhet |
[28]
Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway
|
0.075
|
0.000 |
29.9661350000, 79.2474580000 |
Estimation Done |
1 |
|
|
|
cautionary board |
Jan 2024 |
CD Chamba |
[32]
Dabarkhal Kudi Maun Guriali Ranichauri Dandachali Gaja Nakot Pangarkhal state highway
|
74.900
|
-- |
30.3615060000, 78.4466110000 |
|
|
|
|
|
SIGN BOARD |
Jan 2024 |
CD Chamba |
[32]
Dabarkhal Kudi Maun Guriali Ranichauri Dandachali Gaja Nakot Pangarkhal state highway
|
74.950
|
-- |
30.3613190000, 78.4462470000 |
|
|
|
|
|
SIGN BOARD |
Jan 2024 |
CD Chamba |
[32]
Dabarkhal Kudi Maun Guriali Ranichauri Dandachali Gaja Nakot Pangarkhal state highway
|
75.200
|
-- |
30.3622830000, 78.4433890000 |
|
|
|
|
|
SIGN BOARD |
Jan 2024 |
CD Chamba |
[32]
Dabarkhal Kudi Maun Guriali Ranichauri Dandachali Gaja Nakot Pangarkhal state highway
|
76.800
|
-- |
30.3704580000, 78.4467720000 |
|
|
|
|
|
SIGN BOARD |
Jan 2024 |
CD Chamba |
[32]
Dabarkhal Kudi Maun Guriali Ranichauri Dandachali Gaja Nakot Pangarkhal state highway
|
77.500
|
-- |
30.3709530000, 78.4434140000 |
|
|
|
|
|
SIGN BOARD |
Jan 2024 |
CD Chamba |
[32]
Dabarkhal Kudi Maun Guriali Ranichauri Dandachali Gaja Nakot Pangarkhal state highway
|
77.550
|
-- |
30.3711560000, 78.4434860000 |
|
|
|
|
|
SIGN BOARD |
Jan 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
13.025
|
0.000 |
30.1749580000, 78.8759370000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
13.050
|
0.000 |
30.1743310000, 78.8763660000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
13.200
|
0.000 |
30.1739870000, 78.8766150000 |
Estimation Done |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
13.275
|
0.000 |
30.1731440000, 78.8775080000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
13.525
|
0.000 |
30.1734030000, 78.8755470000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
13.575
|
0.000 |
30.1733320000, 78.8745420000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
14.075
|
0.000 |
30.1735460000, 78.8719520000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
14.150
|
0.000 |
30.1745620000, 78.8718860000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
14.375
|
0.000 |
30.1750600000, 78.8713340000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
14.450
|
0.000 |
30.1753720000, 78.8704070000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
14.700
|
0.000 |
30.1754010000, 78.8688900000 |
Estimation Done |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
14.950
|
0.000 |
30.1752760000, 78.8674550000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.150
|
0.000 |
30.1745170000, 78.8660660000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.200
|
0.000 |
30.1750100000, 78.8657000000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.325
|
0.000 |
30.1746680000, 78.8648510000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.550
|
0.000 |
30.1757990000, 78.8641810000 |
Estimation Done |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.625
|
0.000 |
30.1763570000, 78.8634950000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.775
|
0.000 |
30.1768890000, 78.8632500000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
15.825
|
0.000 |
30.1773940000, 78.8623450000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[57]
Pauri Khirsu Khedakhal Kandai Khankra state highway
|
31.850
|
0.000 |
30.1331150000, 78.8720570000 |
Estimation Done |
5 |
|
|
|
|
Jun 2024 |
CD Nainital |
[59]
Khutani Bhawali Dhanachuli Patlot Meenar Reethasahib Dhunaghat Champawat Manch Tamli state highway
|
13.325
|
-- |
29.3444366667, 80.0388383333 |
|
|
|
|
|
caution board |
Jan 2024 |
CD Nainital |
[59]
Khutani Bhawali Dhanachuli Patlot Meenar Reethasahib Dhunaghat Champawat Manch Tamli state highway
|
21.175
|
-- |
29.3225333333, 80.0436800000 |
|
|
|
|
|
caution board.. |
Jan 2024 |
CD Nainital |
[59]
Khutani Bhawali Dhanachuli Patlot Meenar Reethasahib Dhunaghat Champawat Manch Tamli state highway
|
22.000
|
-- |
29.3245116667, 80.0499150000 |
|
|
|
|
|
km202 warning board |
Jan 2024 |
CD Nainital |
[59]
Khutani Bhawali Dhanachuli Patlot Meenar Reethasahib Dhunaghat Champawat Manch Tamli state highway
|
24.050
|
-- |
29.3226333333, 80.0599050000 |
|
|
|
|
|
warning board h |
Jan 2024 |
CD Nainital |
[59]
Khutani Bhawali Dhanachuli Patlot Meenar Reethasahib Dhunaghat Champawat Manch Tamli state highway
|
25.575
|
-- |
29.3221266667, 80.0670500000 |
|
|
|
|
|
caution board.... |
Jan 2024 |
CD Nainital |
[59]
Khutani Bhawali Dhanachuli Patlot Meenar Reethasahib Dhunaghat Champawat Manch Tamli state highway
|
27.900
|
-- |
29.3309766667, 80.0776133333 |
|
|
|
|
|
board |
Jan 2024 |
CD Nainital |
[59]
Khutani Bhawali Dhanachuli Patlot Meenar Reethasahib Dhunaghat Champawat Manch Tamli state highway
|
28.275
|
-- |
29.3323500000, 80.0819100000 |
|
|
|
|
|
boards |
Jan 2024 |
CD Nainital |
[59]
Khutani Bhawali Dhanachuli Patlot Meenar Reethasahib Dhunaghat Champawat Manch Tamli state highway
|
29.475
|
-- |
29.3372166667, 80.0892050000 |
|
|
|
|
|
boardddd |
Jan 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.050
|
0.000 |
30.3706160000, 79.1106590000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.150
|
0.000 |
30.3711470000, 79.1106780000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.225
|
0.000 |
30.3715640000, 79.1102250000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.325
|
0.000 |
30.3720430000, 79.1096180000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.375
|
0.000 |
30.3727380000, 79.1095850000 |
Estimation Done |
4 |
|
|
|
GOOD CONDITION. |
May 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.600
|
0.000 |
30.3745000000, 79.1085790000 |
Estimation Done |
4 |
2024-03-09 00:00:00 |
|
|
GOOD CONDITION. |
May 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.800
|
0.000 |
30.3755490000, 79.1094150000 |
Estimation Done |
4 |
2024-03-07 00:00:00 |
|
|
GOOD CONDITION. |
May 2024 |
CD Pokhari |
[78]
Rudraprayag Pokhari Gopeshwar state highway
|
35.825
|
0.000 |
30.3755770000, 79.1096570000 |
Estimation Done |
4 |
2024-03-15 00:00:00 |
|
|
GOOD CONDITION. |
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
9.725
|
0.000 |
30.7022694400, 78.4757083300 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
9.775
|
0.000 |
30.7023333330, 78.4764083300 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
11.225
|
0.000 |
30.6959305600, 78.4844972200 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
11.525
|
0.000 |
30.6958527800, 78.4874944400 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
11.575
|
0.000 |
30.6960305600, 78.4884250000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
11.975
|
0.000 |
30.6938888900, 78.4887194400 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
12.625
|
0.000 |
30.6929083300, 78.4851833300 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
12.775
|
0.000 |
30.6919583300, 78.4844250000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
12.850
|
0.000 |
30.6915722220, 78.4844222200 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
12.975
|
0.000 |
30.6897277800, 78.4838944400 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
15.025
|
0.000 |
30.6928333300, 78.4680694400 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
15.150
|
0.000 |
30.6939638900, 78.4652722220 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
15.500
|
0.000 |
30.6942694400, 78.4612638900 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
16.300
|
0.000 |
30.6924250000, 78.4611527800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
16.375
|
0.000 |
30.6915388900, 78.4605527800 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[98]
Uttarkashi Ghansali Tilwara state highway
|
17.600
|
0.000 |
30.6842666670, 78.4557666700 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[166]
Chadethi Raithal motor road
|
3.000
|
0.000 |
30.8097222200, 78.6175000000 |
Estimation Done |
1 |
|
|
|
HP Bend |
May 2024 |
PD Bhatwari |
[166]
Chadethi Raithal motor road
|
4.950
|
0.000 |
30.8169444400, 78.6002777780 |
Estimation Done |
1 |
|
|
|
Turn |
May 2024 |
PD Bhatwari |
[166]
Chadethi Raithal motor road
|
6.650
|
0.000 |
30.8191666700, 78.6580555600 |
Estimation Done |
1 |
|
|
|
Turn |
May 2024 |
PD Bhatwari |
[166]
Chadethi Raithal motor road
|
8.750
|
0.000 |
30.8169444440, 78.6050000000 |
Estimation Done |
0 |
|
|
|
Turn |
May 2024 |
PD Bhatwari |
[166]
Chadethi Raithal motor road
|
8.751
|
0.000 |
30.8169444400, 78.6050000000 |
Estimation Done |
1 |
|
|
|
Rise |
May 2024 |
PD Bhatwari |
[166]
Chadethi Raithal motor road
|
11.025
|
0.000 |
30.8216666700, 78.5977777800 |
Estimation Done |
1 |
|
|
|
Turn |
May 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.065
|
0.000 |
30.1911370000, 78.7812464000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.100
|
0.000 |
30.1911370000, 78.7812464000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.180
|
0.000 |
30.1923018000, 78.7800154000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.280
|
0.000 |
30.1922920700, 78.7793468000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.355
|
0.000 |
30.1929373000, 78.7795948000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.581
|
0.000 |
30.1916228000, 78.7813926000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.610
|
0.000 |
30.1914013000, 78.7817237000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.650
|
0.000 |
30.1912702000, 78.7821142000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.790
|
0.000 |
30.1910663000, 78.7841682000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
0.900
|
0.000 |
30.1906803000, 78.7841682000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.080
|
0.000 |
30.1905127000, 78.7850361000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.267
|
0.000 |
30.1897614000, 78.7863473000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.382
|
0.000 |
30.1896455000, 78.7872294000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.417
|
0.000 |
30.1897997000, 78.7875580000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.497
|
0.000 |
30.1904255000, 78.7874998000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.600
|
0.000 |
30.1909916000, 78.7878177000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.668
|
0.000 |
30.1907602000, 78.7884244000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.728
|
0.000 |
30.1903933000, 78.7888273000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.819
|
0.000 |
30.1901919000, 78.7896144000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.919
|
0.000 |
30.1902572000, 78.7904033000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
1.985
|
0.000 |
30.1901935000, 78.7913993000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
2.107
|
0.000 |
30.1900462000, 78.7926583000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
2.128
|
0.000 |
30.1899396000, 78.7928413000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
2.193
|
0.000 |
30.1898742000, 78.7934955000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
2.338
|
0.000 |
30.1896582000, 78.7949528000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
2.413
|
0.000 |
30.1897337000, 78.7956749000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
2.478
|
0.000 |
30.1896567000, 78.7963937000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
2.558
|
0.000 |
30.1893122000, 78.7970367000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
2.780
|
0.000 |
30.1888244000, 78.7987798000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
2.896
|
0.000 |
30.1886878000, 78.7997976000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
3.042
|
0.000 |
30.1901176000, 78.8065178000 |
Estimation Done |
0 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
3.120
|
0.000 |
30.1875830000, 78.8009749000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
3.153
|
0.000 |
30.1875878000, 78.8013231000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
3.313
|
0.000 |
30.1876083000, 78.8027651000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
3.375
|
0.000 |
30.1875963000, 78.8031832000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
3.387
|
0.000 |
30.1876378000, 78.8033002000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
3.493
|
0.000 |
30.1883196000, 78.8034173000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
3.790
|
0.000 |
30.1891426000, 78.8051330000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
3.865
|
0.000 |
30.1891886000, 78.8057366000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
4.087
|
0.000 |
30.1905682000, 78.8071848000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
4.248
|
0.000 |
30.1901027000, 78.8078312000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
4.319
|
0.000 |
30.1895107000, 78.8078280000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
4.339
|
0.000 |
30.1894122000, 78.8076384000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
4.389
|
0.000 |
30.1891466000, 78.8078293000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
4.428
|
0.000 |
30.1891719000, 78.8082277000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
4.531
|
0.000 |
30.1897480000, 78.8088154000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
4.762
|
0.000 |
30.1888593000, 78.8100399000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
4.838
|
0.000 |
30.1886640000, 78.8105219000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
5.020
|
0.000 |
30.1877509000, 78.8114682000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
5.063
|
0.000 |
30.1872737000, 78.8117267000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
5.070
|
0.000 |
30.1872455000, 78.8117267000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
5.136
|
0.000 |
30.1870259000, 78.8122962000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
7.396
|
0.000 |
30.1925897000, 78.8249416000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
7.510
|
0.000 |
30.1919550000, 78.8254747000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
7.691
|
0.000 |
30.1913220000, 78.8262058000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
7.765
|
0.000 |
30.1913220000, 78.8262058000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
7.990
|
0.000 |
30.1922894000, 78.8259967000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
9.811
|
0.000 |
30.1924902000, 78.8151090000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
9.990
|
0.000 |
30.1925930000, 78.8148213000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
10.026
|
0.000 |
30.1926511000, 78.8151508000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
10.990
|
0.000 |
30.1988275000, 78.8168268000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
11.234
|
0.000 |
30.1974462000, 78.8184209000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
11.321
|
0.000 |
30.1971375000, 78.8187378000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
12.753
|
0.000 |
30.1987022000, 78.8299526000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
12.809
|
0.000 |
30.1989078000, 78.8303480000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
13.696
|
0.000 |
30.1999387000, 78.8379931000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
13.791
|
0.000 |
30.1999945000, 78.8387661000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
14.530
|
0.000 |
30.1978862000, 78.8421827000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
14.638
|
0.000 |
30.1978927000, 78.8423823000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
15.167
|
0.000 |
30.2024858000, 78.8429733000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
15.266
|
0.000 |
30.2030689000, 78.8435834000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
15.844
|
0.000 |
30.2074176000, 78.8449556000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
15.920
|
0.000 |
30.2074230000, 78.8450859000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
16.253
|
0.000 |
30.2057402000, 78.8452875000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
16.423
|
0.000 |
30.2068578000, 78.8464277000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
16.511
|
0.000 |
30.2075673000, 78.8466225000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
16.905
|
0.000 |
30.2107575000, 78.8474343000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[179]
Khandah Sumadi Bughani Devalgarh Chamdhar motor road
|
16.978
|
0.000 |
30.2112548000, 78.8475447000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
0.150
|
0.000 |
30.1788270000, 78.8619340000 |
Estimation Done |
8 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
0.325
|
0.000 |
30.1808650000, 78.8622720000 |
Estimation Done |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
0.375
|
0.000 |
30.1811690000, 78.8619910000 |
Estimation Done |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
0.550
|
0.000 |
30.1813720000, 78.8608530000 |
Estimation Done |
6 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[186]
Pauri Khirsu Srinagar motor road
|
1.000
|
0.000 |
30.1787350000, 78.8604980000 |
Estimation Done |
6 |
|
|
|
|
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
0.885
|
0.000 |
30.3382190000, 79.2022030000 |
Treatment in Progress |
2 |
|
|
|
CAUTIONARY BOARD IS DAMAGED. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
2.460
|
0.000 |
30.3314940000, 79.2048440000 |
Estimation Done |
1 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
2.690
|
0.000 |
30.3308010000, 79.2026250000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
2.800
|
0.000 |
30.3297710000, 79.2018940000 |
Estimation Done |
2 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
2.900
|
0.000 |
30.3294680000, 79.2016690000 |
Treatment in Progress |
3 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
3.075
|
0.000 |
30.3290030000, 79.2008800000 |
Estimation Done |
1 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
3.890
|
0.000 |
30.3296320000, 79.1937720000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
4.675
|
0.000 |
30.3246290000, 79.1975490000 |
Treatment in Progress |
4 |
|
|
|
CAUTIONARY BOARD IS DAMAGED. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
4.880
|
0.000 |
30.3236120000, 79.1992670000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS PARTIALLY DAMAGED. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
4.915
|
0.000 |
30.3235700000, 79.1992940000 |
Treatment in Progress |
5 |
|
|
|
CAUTIONARY BOARD IS DAMAGED. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
5.340
|
0.000 |
30.3233980000, 79.2029480000 |
Treatment in Progress |
2 |
|
|
|
CAUTIONARY BOARD IS DAMAGED. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
5.595
|
0.000 |
30.3221620000, 79.2043300000 |
Treatment in Progress |
5 |
|
|
|
CAUTIONARY BOARD IS DAMAGED. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
5.920
|
0.000 |
30.3218020000, 79.2068600000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
7.525
|
0.000 |
30.3124690000, 79.2026400000 |
Treatment in Progress |
5 |
|
|
|
CAUTIONARY BOARD IS DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
9.900
|
0.000 |
30.2986910000, 79.2034720000 |
Estimation Done |
6 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
10.690
|
0.000 |
30.2947480000, 79.2033190000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
11.225
|
0.000 |
30.2904870000, 79.2037620000 |
Estimation Done |
6 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
12.410
|
0.000 |
30.2842220000, 79.2057330000 |
Treatment in Progress |
8 |
|
|
|
INFORMATORY BOARD IS DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
12.470
|
0.000 |
30.2837120000, 79.2061840000 |
Estimation Done |
7 |
|
|
|
CAUTIONARY BOARD IS PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
17.125
|
0.000 |
30.2801820000, 79.2268150000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
17.175
|
0.000 |
30.2801860000, 79.2263140000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
17.225
|
0.000 |
30.2802410000, 79.2258540000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
17.325
|
0.000 |
30.2792420000, 79.2242530000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
18.700
|
0.000 |
30.2724240000, 79.2153070000 |
Estimation Done |
2 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
18.925
|
0.000 |
30.2718100000, 79.2149480000 |
Estimation Done |
2 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
19.050
|
0.000 |
30.2725800000, 79.2147760000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
22.550
|
0.000 |
30.2732800000, 79.2221550000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
24.375
|
0.000 |
30.2657590000, 79.2159670000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
24.675
|
0.000 |
30.2659280000, 79.2164270000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
24.775
|
0.000 |
30.2664630000, 79.2167790000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
24.800
|
0.000 |
30.2665990000, 79.2174990000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[191]
Karanprayag Pokhari Gopeshwer state highway
|
25.650
|
0.000 |
30.2654280000, 79.2145440000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS NOT IN GOOD CONDITION. |
May 2024 |
CD Nainital |
[198]
Laxmikhan Talla Ramgarh Nathuwakhan Puyuda Qwarab motor road
|
8.750
|
0.000 |
29.4500000000, 79.5675000000 |
Estimation Done |
1 |
|
|
|
MDUK04011 |
Jan 2024 |
PD Dehradun |
[344]
Right to service office road in Sahastradhara road of gram Chalang
|
1.150
|
-- |
30.3284805600, 78.0315833300 |
|
|
|
|
|
Rumble Strips |
Jan 2024 |
PD Dehradun |
[344]
Right to service office road in Sahastradhara road of gram Chalang
|
1.800
|
-- |
30.3328361100, 78.0272944400 |
|
|
|
|
|
Speed breaker
Speed Limit |
Jan 2024 |
|
[344]
Right to service office road in Sahastradhara road of gram Chalang
|
1.900
|
-- |
30.3335500000, 78.0257388900 |
|
|
|
|
|
Speed Breaker |
Jan 2024 |
|
[344]
Right to service office road in Sahastradhara road of gram Chalang
|
1.950
|
-- |
30.3335638900, 78.0260472200 |
|
|
|
|
|
Mishapening Zone |
Jan 2024 |
CD Pokhari |
[374]
Nagnath link motor road
|
0.080
|
0.000 |
30.3307300000, 79.2064020000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[374]
Nagnath link motor road
|
0.140
|
0.000 |
30.3306820000, 79.2077770000 |
Estimation Done |
6 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[374]
Nagnath link motor road
|
0.240
|
0.000 |
30.3301580000, 79.2087100000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[374]
Nagnath link motor road
|
0.500
|
0.000 |
30.3327440000, 79.2081320000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[375]
Jaurasi Hapla Kalsir Dhotidhar motor road
|
1.725
|
0.000 |
30.4169110000, 79.2128890000 |
Estimation Done |
5 |
2024-03-21 00:00:00 |
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[375]
Jaurasi Hapla Kalsir Dhotidhar motor road
|
2.825
|
0.000 |
30.4223130000, 79.2068460000 |
Estimation Done |
4 |
2024-03-20 00:00:00 |
|
|
CAUTIONARY BOARDIS IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[375]
Jaurasi Hapla Kalsir Dhotidhar motor road
|
2.900
|
0.000 |
30.4212580000, 79.2071710000 |
Estimation Done |
5 |
2024-03-23 00:00:00 |
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[375]
Jaurasi Hapla Kalsir Dhotidhar motor road
|
3.175
|
0.000 |
30.4247370000, 79.2050460000 |
Treatment in Progress |
3 |
|
|
|
CAUTIONARY BOARD IS DAMAGED. |
May 2024 |
PD Karnprayag |
[392]
Panchpuliya internal road
|
0.000
|
0.000 |
30.2667190000, 79.2093580000 |
Identified |
1 |
|
|
|
|
Jan 2024 |
|
[392]
Panchpuliya internal road
|
680.000
|
0.000 |
30.2646030000, 79.2122440000 |
Identified |
1 |
|
|
|
|
Jan 2024 |
TD Rishikesh |
[1383]
Dharmpur Chauk to bypass Road (Mata Mandir Road)
|
0.560
|
-- |
30.2990210000, 78.0444340000 |
|
|
|
|
|
CAUTIONARY BOARD |
Jan 2024 |
TD Rishikesh |
[1383]
Dharmpur Chauk to bypass Road (Mata Mandir Road)
|
0.930
|
-- |
30.2964950000, 78.0419490000 |
|
|
|
|
|
CAUTIONARY BOARD (RAILWAY) |
Jan 2024 |
TD Rishikesh |
[1383]
Dharmpur Chauk to bypass Road (Mata Mandir Road)
|
0.955
|
-- |
30.2963220000, 78.0418100000 |
|
|
|
|
|
CAUTIONARY BOARD (RAILWAY) |
Jan 2024 |
TD Rishikesh |
[1383]
Dharmpur Chauk to bypass Road (Mata Mandir Road)
|
1.040
|
-- |
30.2957550000, 78.0412790000 |
|
|
|
|
|
CAUTIONARY BOARD (RAILWAY) |
Jan 2024 |
TD Rishikesh |
[1383]
Dharmpur Chauk to bypass Road (Mata Mandir Road)
|
1.067
|
-- |
30.2955380000, 78.0411130000 |
|
|
|
|
|
CAUTIONARY BOARD (RAILWAY) |
Jan 2024 |
TD Rishikesh |
[1383]
Dharmpur Chauk to bypass Road (Mata Mandir Road)
|
1.442
|
-- |
30.2923010000, 78.0399200000 |
|
|
|
|
|
CAUTIONARY BOARD |
Jan 2024 |
CD Gairsain |
[1732]
Bachuwaban Chokhutiya Kunigad motor road
|
8.347
|
0.000 |
29.9470920000, 79.3049970000 |
Estimation Done |
1 |
|
|
|
cautionary board |
Jan 2024 |
CD Gairsain |
[1732]
Bachuwaban Chokhutiya Kunigad motor road
|
9.059
|
0.000 |
29.5032900000, 79.3046920000 |
Estimation Done |
1 |
|
|
|
cautionary sign board |
Jan 2024 |
CD Gairsain |
[1732]
Bachuwaban Chokhutiya Kunigad motor road
|
10.619
|
0.000 |
29.9445540000, 79.3123830000 |
Estimation Done |
1 |
|
|
|
Cautionary board |
Jan 2024 |
CD Gairsain |
[1732]
Bachuwaban Chokhutiya Kunigad motor road
|
12.230
|
0.000 |
29.9475020000, 79.3237150000 |
Estimation Done |
1 |
|
|
|
cautionary sign board |
Jan 2024 |
CD Gairsain |
[1732]
Bachuwaban Chokhutiya Kunigad motor road
|
12.854
|
0.000 |
29.9473450000, 79.3228140000 |
Estimation Done |
1 |
|
|
|
cautionary board |
Jan 2024 |
CD Gairsain |
[1732]
Bachuwaban Chokhutiya Kunigad motor road
|
13.010
|
0.000 |
29.9479360000, 79.3229050000 |
Estimation Done |
1 |
|
|
|
cautionary sign board |
Jan 2024 |
CD Gairsain |
[1732]
Bachuwaban Chokhutiya Kunigad motor road
|
14.088
|
0.000 |
29.9452240000, 79.3260930000 |
Estimation Done |
1 |
|
|
|
cautionary board |
Jan 2024 |
CD Gairsain |
[1732]
Bachuwaban Chokhutiya Kunigad motor road
|
14.270
|
0.000 |
29.9446920000, 79.3265300000 |
Estimation Done |
1 |
|
|
|
cautionary sign board |
Jan 2024 |
CD Gairsain |
[1733]
Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road
|
2.692
|
0.000 |
30.0675020000, 79.2861730000 |
Estimation Done |
1 |
|
|
|
Slide Zone Sign Board |
Jan 2024 |
CD Gairsain |
[1733]
Kargil Shaheed Hawaldar Shri Padam Ram Motor Road/ Gairsain Pajiyana rohida motor road
|
4.712
|
0.000 |
30.0725150000, 79.2805270000 |
Estimation Done |
1 |
|
|
|
Sharp Curve ahead Sign Board |
Jan 2024 |
CD Gairsain |
[1735]
Kargil Shaheed Ranjeet Singh motor road (Ambedkar Gram Ager Jingod motor road)
|
0.481
|
0.000 |
30.0093040000, 79.3136210000 |
Estimation Done |
1 |
|
|
0 |
ok |
Jan 2024 |
CD Gairsain |
[1735]
Kargil Shaheed Ranjeet Singh motor road (Ambedkar Gram Ager Jingod motor road)
|
0.493
|
0.000 |
30.0093080000, 79.3137430000 |
Estimation Done |
1 |
|
|
1 |
Sharpe Curve sign board |
Jan 2024 |
CD Gairsain |
[1742]
Bungidhar Mehalchauri Bachuwavan motor road
|
1.427
|
0.000 |
30.0755880000, 79.2613190000 |
Estimation Done |
1 |
|
|
|
Cautionary Board |
Jan 2024 |
CD Gairsain |
[1742]
Bungidhar Mehalchauri Bachuwavan motor road
|
1.490
|
0.000 |
30.0756750000, 79.2612390000 |
Estimation Done |
1 |
|
|
|
Cautionary board |
Jan 2024 |
CD Gairsain |
[1742]
Bungidhar Mehalchauri Bachuwavan motor road
|
4.001
|
0.000 |
30.0803080000, 79.2499290000 |
Estimation Done |
1 |
|
|
|
Cautionary board |
Jan 2024 |
CD Gairsain |
[1742]
Bungidhar Mehalchauri Bachuwavan motor road
|
4.388
|
0.000 |
30.0809830000, 79.2467020000 |
Estimation Done |
1 |
|
|
|
Cautionary board |
Jan 2024 |
CD Gairsain |
[1742]
Bungidhar Mehalchauri Bachuwavan motor road
|
4.450
|
0.000 |
30.0811050000, 79.2467290000 |
Estimation Done |
1 |
|
|
|
Cautionary board |
Jan 2024 |
CD Pokhari |
[1785]
Khal Sarmola Rano motor road
|
0.050
|
0.000 |
30.2885790000, 79.2029990000 |
Estimation Done |
6 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[1785]
Khal Sarmola Rano motor road
|
0.175
|
0.000 |
30.2891810000, 79.2006170000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[1785]
Khal Sarmola Rano motor road
|
0.610
|
0.000 |
30.2889750000, 79.1976980000 |
Estimation Done |
6 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITIONS. |
May 2024 |
CD Pokhari |
[1785]
Khal Sarmola Rano motor road
|
0.750
|
0.000 |
30.2891760000, 79.1974290000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[1785]
Khal Sarmola Rano motor road
|
0.800
|
0.000 |
30.2888910000, 79.1983100000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[1785]
Khal Sarmola Rano motor road
|
0.830
|
0.000 |
30.2887720000, 79.1982840000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[1785]
Khal Sarmola Rano motor road
|
1.010
|
0.000 |
30.2884630000, 79.2002690000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[1785]
Khal Sarmola Rano motor road
|
1.125
|
0.000 |
30.2882050000, 79.2010660000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN WELL CONDITION. |
May 2024 |
CD Pokhari |
[1785]
Khal Sarmola Rano motor road
|
1.350
|
0.000 |
30.2874890000, 79.2024570000 |
Estimation Done |
2 |
|
|
|
DAMAGE DUE TO SINK PORTION. |
May 2024 |
CD Pokhari |
[1786]
Mukhyalay vikaskhand Pokhari motor road
|
0.130
|
0.000 |
30.3449370000, 79.1990980000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[1786]
Mukhyalay vikaskhand Pokhari motor road
|
0.160
|
0.000 |
30.3460560000, 79.1982730000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[1791]
Semi Mason motor road
|
0.300
|
0.000 |
30.2769910000, 79.2253350000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
Jun 2024 |
CD Pokhari |
[1791]
Semi Mason motor road
|
2.350
|
0.000 |
30.2830130000, 79.2317870000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS PARTIALLY DAMAGED. |
Jun 2024 |
CD Pokhari |
[1795]
Hapla Masholi motor road to Gudam motor road
|
0.375
|
0.000 |
30.4149230000, 79.2182810000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[1795]
Hapla Masholi motor road to Gudam motor road
|
0.675
|
0.000 |
30.4141400000, 79.2199280000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[1795]
Hapla Masholi motor road to Gudam motor road
|
0.700
|
0.000 |
30.4143610000, 79.2200000000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[1795]
Hapla Masholi motor road to Gudam motor road
|
1.075
|
0.000 |
30.4133390000, 79.2208890000 |
Estimation Done |
3 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[1795]
Hapla Masholi motor road to Gudam motor road
|
1.275
|
0.000 |
30.4127290000, 79.2212560000 |
Estimation Done |
4 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Pokhari |
[1795]
Hapla Masholi motor road to Gudam motor road
|
1.600
|
0.000 |
30.4119860000, 79.2224060000 |
Estimation Done |
5 |
|
|
|
CAUTIONARY BOARD IS IN GOOD CONDITION. |
May 2024 |
CD Nainital |
[2678]
Talla Ramgarh Ratighat motor road.
|
4.200
|
0.000 |
29.4499920000, 79.5309110000 |
|
|
|
|
|
Cautionary board (Good Condition) |
Jan 2024 |
CD Nainital |
[2678]
Talla Ramgarh Ratighat motor road.
|
4.500
|
0.000 |
29.4508000000, 79.5290530000 |
|
|
|
|
|
Cautionary board (Good Condition) |
Jan 2024 |
CD Nainital |
[2678]
Talla Ramgarh Ratighat motor road.
|
4.875
|
0.000 |
29.4529690000, 79.5274830000 |
|
|
|
|
|
Cautionary board (Good Condition) |
Jan 2024 |
CD Nainital |
[2680]
Nathuwakhan Hartola Jaurasi Roopsingh Dhura Thuwablock Harinagar motor road
|
3.575
|
0.000 |
29.4728140000, 79.5817670000 |
Estimation Done |
1 |
|
|
|
010VR008 |
Jan 2024 |
CD Nainital |
[2680]
Nathuwakhan Hartola Jaurasi Roopsingh Dhura Thuwablock Harinagar motor road
|
3.950
|
0.000 |
29.4729140000, 79.5847310000 |
Estimation Done |
1 |
|
|
|
|
Jan 2024 |
CD Nainital |
[2680]
Nathuwakhan Hartola Jaurasi Roopsingh Dhura Thuwablock Harinagar motor road
|
6.700
|
0.000 |
29.4697440000, 79.5676670000 |
Estimation Done |
1 |
|
|
|
|
Jan 2024 |
CD Nainital |
[2680]
Nathuwakhan Hartola Jaurasi Roopsingh Dhura Thuwablock Harinagar motor road
|
10.250
|
0.000 |
29.4701780000, 79.5512860000 |
Estimation Done |
1 |
|
|
|
|
Jan 2024 |
CD Nainital |
[2680]
Nathuwakhan Hartola Jaurasi Roopsingh Dhura Thuwablock Harinagar motor road
|
16.450
|
0.000 |
29.4717310000, 79.5280640000 |
Estimation Done |
1 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3135]
Bharatpur Sundari Nauly Dabra motor road
|
0.000
|
0.000 |
30.9466220000, 78.8899500000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.066
|
0.000 |
29.9541777700, 78.8762944000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.170
|
0.000 |
29.9540361100, 78.8753694000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.362
|
0.000 |
29.9537220000, 78.8742833000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.440
|
0.000 |
29.9538888000, 78.8735638000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.491
|
0.000 |
29.9535611000, 78.8732250000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.538
|
0.000 |
29.9536250000, 78.8727520000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.600
|
0.000 |
29.9533055000, 78.8722190000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.689
|
0.000 |
29.9530194000, 78.8720110000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.723
|
0.000 |
29.9523472000, 78.8720410000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.736
|
0.000 |
29.9526000000, 78.8720027000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
0.780
|
0.000 |
29.9529722200, 78.8715722200 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
1.200
|
0.000 |
29.9543250000, 78.8718222000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
1.280
|
0.000 |
29.9547444000, 78.8725750000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
1.730
|
0.000 |
29.9541305500, 78.8704000000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
1.900
|
0.000 |
29.9527833000, 78.8706333000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3153]
Latibo Dalibo Nai motor road
|
1.930
|
0.000 |
29.9524250000, 78.8701580000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3159]
Choubattakhal Dantha motor road
|
0.345
|
0.000 |
29.9577080000, 78.8803500000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3159]
Choubattakhal Dantha motor road
|
1.700
|
0.000 |
29.9640750000, 78.8849200000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3159]
Choubattakhal Dantha motor road
|
2.050
|
0.000 |
29.9650500000, 78.8872700000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3159]
Choubattakhal Dantha motor road
|
3.970
|
0.000 |
29.9681610000, 78.8946277000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3159]
Choubattakhal Dantha motor road
|
4.190
|
0.000 |
29.9674800000, 78.8948580000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3159]
Choubattakhal Dantha motor road
|
4.320
|
0.000 |
29.9667222000, 78.8946472200 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Pauri |
[3159]
Choubattakhal Dantha motor road
|
5.550
|
0.000 |
29.9610270000, 78.8979880000 |
Estimation Done |
4 |
|
|
|
|
Jan 2024 |
CD Srinagar |
[3645]
Inspection house Srinagar approch road
|
0.000
|
0.000 |
30.2194444400, 78.7930555600 |
Estimation Done |
1 |
2020-10-10 00:00:00 |
|
|
installed |
Jan 2024 |
CD Srinagar |
[3647]
Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road
|
16.100
|
0.000 |
30.1983790000, 78.6793070000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3647]
Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road
|
17.500
|
0.000 |
30.2041890000, 78.6724650000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3647]
Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road
|
17.700
|
0.000 |
30.2047880000, 78.6712500000 |
Identified |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3647]
Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road
|
22.200
|
0.000 |
30.1860310000, 78.7910778651 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3647]
Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road
|
22.600
|
0.000 |
30.1837280000, 78.6505430000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3647]
Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road
|
23.100
|
0.000 |
30.1833830000, 78.6516330000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
18.865
|
0.000 |
30.1896971000, 78.7049993000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.075
|
0.000 |
30.1913555000, 78.7044949000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.120
|
0.000 |
30.1916493000, 78.7047205000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.150
|
0.000 |
30.1919155000, 78.7047172000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.220
|
0.000 |
30.1923692000, 78.7043656000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.360
|
0.000 |
30.1931033000, 78.7037809000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.690
|
0.000 |
30.1887383000, 78.7063425000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.765
|
0.000 |
30.1891472000, 78.7057284000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.775
|
0.000 |
30.1943994000, 78.7063127000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
19.865
|
0.000 |
30.1943804000, 78.7066660000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.075
|
0.000 |
30.1959617000, 78.7057820000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.125
|
0.000 |
30.1960406000, 78.7062299000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.235
|
0.000 |
30.1961057000, 78.7069997000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.450
|
0.000 |
30.1958432000, 78.7082875000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.495
|
0.000 |
30.1956013000, 78.7085757000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.520
|
0.000 |
30.1955862000, 78.7088483000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.570
|
0.000 |
30.1954878000, 78.7092761000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.800
|
0.000 |
30.1964658000, 78.7105755000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.925
|
0.000 |
30.1957097000, 78.7114432000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
20.980
|
0.000 |
30.1953281000, 78.7117547000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.000
|
0.000 |
30.1954482000, 78.7119023000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.020
|
0.000 |
30.1955484000, 78.7120128000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.050
|
0.000 |
30.1955870000, 78.7123697000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.075
|
0.000 |
30.1957043000, 78.7125935000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.345
|
0.000 |
30.1963749000, 78.7148826000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.450
|
0.000 |
30.1962375000, 78.7158254000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.550
|
0.000 |
30.1958035000, 78.7166721000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.675
|
0.000 |
30.1962398000, 78.7175969000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.750
|
0.000 |
30.1964798000, 78.7182611000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
21.900
|
0.000 |
30.1970603000, 78.7193247000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.065
|
0.000 |
30.1972288000, 78.7209512000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.140
|
0.000 |
30.1977586000, 78.7211072000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.200
|
0.000 |
30.1982648000, 78.7208101000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.280
|
0.000 |
30.1988477000, 78.7205186000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.310
|
0.000 |
30.1991466000, 78.7205304000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.460
|
0.000 |
30.1997239000, 78.7192993000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.640
|
0.000 |
30.1997343000, 78.7174893000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.680
|
0.000 |
30.1998986000, 78.7172298000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.790
|
0.000 |
30.2006832000, 78.7167378000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
22.880
|
0.000 |
30.2013224000, 78.7161912000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
23.140
|
0.000 |
30.2029575000, 78.7145885000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
23.300
|
0.000 |
30.2038973000, 78.7136953000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
23.345
|
0.000 |
30.2043006000, 78.7137975000 |
Estimation Done |
1 |
|
|
|
ok |
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.155
|
0.000 |
30.2102413000, 78.7125148000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.260
|
0.000 |
30.2103494000, 78.7134317000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.345
|
0.000 |
30.2104556000, 78.7139630000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.410
|
0.000 |
30.2104650000, 78.7145608000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.545
|
0.000 |
30.2101845000, 78.7156387000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.620
|
0.000 |
30.2101845000, 78.7156387000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.710
|
0.000 |
30.2109070000, 78.7169775000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.770
|
0.000 |
30.2112939000, 78.7173520000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
24.840
|
0.000 |
30.2116023000, 78.7178912000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
25.000
|
0.000 |
30.2116023000, 78.7178912000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
25.230
|
0.000 |
30.2097098000, 78.7206285000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
25.550
|
0.000 |
30.2096689000, 78.7232725000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
25.750
|
0.000 |
30.2100047000, 78.7251989000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
25.870
|
0.000 |
30.2097429000, 78.7262120000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
25.960
|
0.000 |
30.2095795000, 78.7271673000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
26.185
|
0.000 |
30.2085716000, 78.7290946000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
26.465
|
0.000 |
30.2080451000, 78.7315162000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
26.500
|
0.000 |
30.2082833000, 78.7316808000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
26.535
|
0.000 |
30.2085709000, 78.7316087000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
26.630
|
0.000 |
30.2093598000, 78.7313617000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
26.680
|
0.000 |
30.2097711000, 78.7311741000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
26.895
|
0.000 |
30.2114797000, 78.7309676000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.000
|
0.000 |
30.2122750000, 78.7315176000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.055
|
0.000 |
30.2127492000, 78.7314524000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.160
|
0.000 |
30.2128000000, 78.7315842000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.220
|
0.000 |
30.2122633000, 78.7316822000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.305
|
0.000 |
30.2115679000, 78.7316021000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.635
|
0.000 |
30.2090847000, 78.7325039000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.685
|
0.000 |
30.2086528000, 78.7326452000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
27.800
|
0.000 |
30.2087506000, 78.7327776000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
28.105
|
0.000 |
30.2112314000, 78.7320113000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
28.305
|
0.000 |
30.2126737000, 78.7326483000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
28.450
|
0.000 |
30.2138035000, 78.7328130000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
28.605
|
0.000 |
30.2148465000, 78.7320156000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
29.050
|
0.000 |
30.2160016000, 78.7281470000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
29.115
|
0.000 |
30.2162935000, 78.7276801000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
29.220
|
0.000 |
30.2171443000, 78.7275186000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
29.280
|
0.000 |
30.2175651000, 78.7272752000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
29.524
|
0.000 |
30.2190157000, 78.7256997000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
29.805
|
0.000 |
30.2211089000, 78.7247434000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
29.910
|
0.000 |
30.2217384000, 78.7240688000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
29.960
|
0.000 |
30.2220585000, 78.7238698000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
29.995
|
0.000 |
30.2222838000, 78.7234614000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
30.010
|
0.000 |
30.2223334000, 78.7233133000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
30.255
|
0.000 |
30.2239770000, 78.7218046000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
30.300
|
0.000 |
30.2242470000, 78.7214459000 |
Identified |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
30.395
|
0.000 |
30.2246489000, 78.7205520000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
30.450
|
0.000 |
30.2250393000, 78.7202038000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
30.590
|
0.000 |
30.2256541000, 78.7190925000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
30.630
|
0.000 |
30.2257541000, 78.7187012000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
30.785
|
0.000 |
30.2263323000, 78.7176011000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
30.880
|
0.000 |
30.2271470000, 78.7173543000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
31.080
|
0.000 |
30.2284208000, 78.7159897000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
31.140
|
0.000 |
30.2287225000, 78.7155211000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
31.195
|
0.000 |
30.2290357000, 78.7151738000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Srinagar |
[3649]
Pauri Dehlchauri Uflada motor road
|
31.480
|
0.000 |
30.2292866000, 78.7149602000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
|
[3649]
Pauri Dehlchauri Uflada motor road
|
31.650
|
0.000 |
30.2299235000, 78.7133440000 |
Estimation Done |
0 |
|
|
|
|
Jun 2024 |
CD Askote |
[3734]
Link road from Km 12 of Jauljibi Munsyari motor road to Koli Kanyal
|
0.950
|
0.000 |
29.8416200000, 80.3539600000 |
Estimation Done |
1 |
|
|
|
|
Jan 2024 |
CD Askote |
[3734]
Link road from Km 12 of Jauljibi Munsyari motor road to Koli Kanyal
|
1.010
|
0.000 |
29.8415600000, 80.3531500000 |
Estimation Done |
1 |
|
|
|
|
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.020
|
0.000 |
30.4478800000, 78.4334300000 |
Estimation Done |
8 |
|
|
|
Over taking Prohibited |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.055
|
0.000 |
30.4478000000, 78.4335700000 |
Estimation Done |
8 |
|
|
|
Speed Breaker |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.135
|
0.000 |
30.4479000000, 78.4344200000 |
Estimation Done |
3 |
|
|
|
Dip |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.160
|
0.000 |
30.4475100000, 78.4347100000 |
Estimation Done |
8 |
|
|
|
Dip |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.360
|
0.000 |
30.4469000000, 48.4368000000 |
Estimation Done |
8 |
|
|
|
No Stopping & No Standing |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.380
|
0.000 |
30.4469900000, 78.4369700000 |
Estimation Done |
10 |
|
|
|
Load Limit |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.840
|
0.000 |
30.4469900000, 78.4417400000 |
Estimation Done |
10 |
|
|
|
Load Limit |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.865
|
0.000 |
30.4469300000, 78.4421500000 |
Estimation Done |
10 |
|
|
|
No Stopping & No Standing |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.866
|
0.000 |
30.4469300000, 78.4421500000 |
Estimation Done |
8 |
|
|
|
Right Hand Curve |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.870
|
0.000 |
30.4467500000, 78.4421000000 |
Estimation Done |
9 |
|
|
|
No Parking |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.940
|
0.000 |
30.4463400000, 78.4426300000 |
Estimation Done |
8 |
|
|
|
Speed Breaker |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
0.955
|
0.000 |
30.4462000000, 78.4426300000 |
Estimation Done |
8 |
|
|
|
Overtaking Prohibited |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.083
|
0.000 |
30.4454400000, 78.4418100000 |
Estimation Done |
8 |
|
|
|
Speed Limit |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.287
|
0.000 |
30.4434800000, 78.4419000000 |
Estimation Done |
9 |
|
|
|
Left Hairpin Bend |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.327
|
0.000 |
30.4437700000, 78.4419800000 |
Estimation Done |
9 |
|
|
|
Right Hairpin Bend |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.500
|
0.000 |
30.4449000000, 78.4421800000 |
Estimation Done |
8 |
|
|
|
Series of Bends |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.650
|
0.000 |
30.4459000000, 78.4428700000 |
Estimation Done |
8 |
|
|
|
Right Hand Curve |
Jan 2024 |
PD New Tehri |
[4004]
Dobra Bridge Heavy vehicle approach road
|
1.699
|
0.000 |
30.4460600000, 78.4432800000 |
Estimation Done |
8 |
|
|
|
Left Hand Curve |
Jan 2024 |
|
[4004]
Dobra Bridge Heavy vehicle approach road
|
2.023
|
0.000 |
30.4488400000, 78.4425800000 |
Estimation Done |
8 |
|
|
|
Right Hand Curve |
Jan 2024 |
|
[4004]
Dobra Bridge Heavy vehicle approach road
|
2.063
|
0.000 |
30.4490500000, 78.4436400000 |
Estimation Done |
8 |
|
|
|
Left Hand Curve |
Jan 2024 |
|
[4004]
Dobra Bridge Heavy vehicle approach road
|
2.218
|
0.000 |
30.4501300000, 78.4445800000 |
Estimation Done |
8 |
|
|
|
Speed Limit |
Jan 2024 |
|
[4004]
Dobra Bridge Heavy vehicle approach road
|
2.318
|
0.000 |
30.4510700000, 78.4448600000 |
Estimation Done |
8 |
|
|
|
Right Hairpin Bend |
Jan 2024 |
|
[4004]
Dobra Bridge Heavy vehicle approach road
|
2.387
|
0.000 |
30.4511400000, 78.4450400000 |
Estimation Done |
8 |
|
|
|
Left Hairpin Bend |
Jan 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
1.275
|
0.000 |
30.8242270000, 78.6198360000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5227]
Bhatwari Barsu motor road
|
1.575
|
0.000 |
30.8261620000, 78.6167330000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
0.075
|
0.000 |
30.8648530000, 78.6514960000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
0.675
|
0.000 |
30.8626540000, 78.6499930000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.075
|
0.000 |
30.8616160000, 78.6492560000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.175
|
0.000 |
30.8615280000, 78.6490800000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.300
|
0.000 |
30.8624910000, 78.6489840000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.450
|
0.000 |
30.8624340000, 78.6489560000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.500
|
0.000 |
30.8618950000, 78.6486730000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.800
|
0.000 |
30.8626210000, 78.6490260000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
1.825
|
0.000 |
30.8600640000, 78.6462370000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5238]
Bhukki-Kujjan-Tihar Motor Road
|
2.000
|
0.000 |
30.8590480000, 78.6445520000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5243]
Gangani Bridge to Bhangeli Motor Road
|
0.925
|
0.000 |
30.3431680000, 78.0206080000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5243]
Gangani Bridge to Bhangeli Motor Road
|
1.600
|
0.000 |
30.9103670000, 78.6783810000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5243]
Gangani Bridge to Bhangeli Motor Road
|
1.775
|
0.000 |
30.9114470000, 78.6787190000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5243]
Gangani Bridge to Bhangeli Motor Road
|
3.525
|
0.000 |
30.9094030000, 78.6757940000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5243]
Gangani Bridge to Bhangeli Motor Road
|
4.150
|
0.000 |
30.9126220000, 78.6758140000 |
Estimation Done |
1 |
|
|
|
Good Condition |
May 2024 |
PD Bhatwari |
[5244]
Gangori Uttroin motor road
|
3.625
|
-- |
30.7844222222, 78.4484333333 |
|
|
|
|
|
maintainace required |
Jan 2024 |
PD Bhatwari |
[5244]
Gangori Uttroin motor road
|
3.950
|
-- |
30.7820000000, 78.4493333333 |
|
|
|
|
|
maintainace required in sign board |
Jan 2024 |
PD Bhatwari |
[5246]
Uttarkashi Bypass Motor Road
|
1.600
|
0.000 |
30.7333333000, 78.4072222200 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5246]
Uttarkashi Bypass Motor Road
|
2.025
|
0.000 |
30.7341666700, 78.4119444400 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5246]
Uttarkashi Bypass Motor Road
|
3.225
|
0.000 |
30.7308333300, 78.4188888890 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5246]
Uttarkashi Bypass Motor Road
|
5.450
|
0.000 |
30.7286111100, 78.4383333000 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5246]
Uttarkashi Bypass Motor Road
|
6.575
|
0.000 |
30.7302777800, 78.4458333300 |
Estimation Done |
0 |
|
|
|
|
May 2024 |
PD Bhatwari |
[5246]
Uttarkashi Bypass Motor Road
|
8.100
|
0.000 |
30.7300000000, 78.4436111100 |
Estimation Done |
0 |
|
|
|
|
May 2024 |