on Chainage 20.135 of From km 16 of Rishikesh Bhaniawala road to Agarwal Bakers via Airport, Thano, Raipur, Pulia Number 6 Fawara Chowk state highway
In District Dehradun Under TD Rishikesh Division
Critical Report on Bridge Condition
Form Filled By Ompal Singh [65006210]
Inspection Team
"Bridge inspection of 270 m bridge at km 21 of raipur thano motor road over song river. The drainage spout are not proper cleaned. Water is dropping over bearings, pedestal and pier cape through extention joints. The cover of end girders are cracked. The dredged material is deposited near left bank upto centre .the clearing of deposited material is required "
(Ompal Singh)
Superintending Engineer Civil
on Jun 24, 2025
"The 270 m bridge raipur thano inspected. The total discharge of water in flowing through through last span. Due to that tendency of water is healing to abutment is increased. The chanalization of water through central span is necessary for safety of abutment and approach road is required. Sufficient dredging of river is required for centralized the flow of water and avoid the direct hitting to abutment and approach. The jacketing of central pier is also damaged. Immediate repair of this pier required "
(Ompal Singh)
Superintending Engineer Civil
on Jun 24, 2025
Detail Report
# | Parameter | Problem ? | How Bad? | How Much? | |
---|---|---|---|---|---|
1 | ROAD APPROCHES AND DECK Component Weightage 10 | ||||
A- ROAD SURFACE NEAR BRIDGE | |||||
a) Bumpy road surface near bridge? | Yes | Bad | Some Qty | 5 | |
B- DRAINAGE | |||||
a) Badly built road drainage near bridge? | Yes | Bad | Some Qty | 5 | |
b) Blocked or damaged road drains? | Yes | Very Bad | Not Much Qty | 7 | |
c) Water on the deck? | Yes | Bad | Some Qty | 5 | |
d) Blocked or damaged deck drains? | Yes | Bad | Some Qty | 5 | |
C- WEARING COAT | |||||
BITUMEN WEARING COURSE | |||||
a) Surface breaking up or lifting off? | Yes | Bad | Some Qty | 5 | |
b) Cracking above joints ? | NO Problem | -- | -- | 0 | |
D- KERBS & FOOTPATHS | |||||
a) Loose railing fixtures? | Yes | Bad | Not Much Qty | 4 | |
a) Damaged or loose kerbs? | NO Problem | -- | -- | 0 | |
2 | PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10 | ||||
a) Impact damaged? | NO Problem | -- | -- | 0 | |
b) Loose or damaged fixings? | Yes | Bad | Some Qty | 5 | |
c) Loose base of posts? | Yes | Bad | Not Much Qty | 4 | |
d) Damaged coatirig or paint on steel surface? | Yes | Bad | Not Much Qty | 4 | |
e) Corrosion on steel surface? | NO Problem | -- | -- | 0 | |
f) Cracking on Masonary Parapets? | NO Problem | -- | -- | 0 | |
g) Movement or bending of parapet? | NO Problem | -- | -- | 0 | |
h) Poor pointing/ Plaster on parapet? | Yes | Bad | Some Qty | 5 | |
i) Deterioration of bricks or stones? | Yes | Bad | Some Qty | 5 | |
3 | EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10 | ||||
a) Damage to concrete of deck end or dirt wall near joint? | Yes | Bad | Some Qty | 5 | |
b) Debris or vegetation in joint? | Yes | Bad | Much Qty | 6 | |
c) Loose or damaged fixtures? | Yes | Bad | Some Qty | 5 | |
d) Damage or corrosion to metal parts? | Yes | Bad | Some Qty | 5 | |
e) Damage to rubber waterseals? | Yes | Bad | Not Much Qty | 4 | |
4 | RIVER Component Weightage 10 | ||||
A- BLOCKAGES IN WATERWAY | |||||
a) Debris against piers or abutments? | Yes | Bad | Some Qty | 5 | |
b) Remains of old bridge under or upstream of the bridge? | NO Problem | -- | -- | 0 | |
c) Fencing or buildings under bridge? | NO Problem | -- | -- | 0 | |
d) Trees or bushes.growing under bridge? | Yes | Bad | Much Qty | 6 | |
B- CHANGE IN RIVER COURSE | |||||
a) River changing path upstream of bridge? | Yes | Bad | Much Qty | 6 | |
b) New islands forming upstream of bridge? | Yes | Bad | Much Qty | 6 | |
C- RIVER TRAINING WORKS | |||||
a) River attack beyond the upstream end of river training works? | Yes | Bad | Much Qty | 6 | |
b) Damage to walls? | Yes | Bad | Much Qty | 6 | |
c) Loss of pitching? | Yes | Bad | Much Qty | 6 | |
d) Damage to crates, timber, fencing, etc.? | Yes | Bad | Much Qty | 6 | |
e) Damage to trees? | Yes | Bad | Much Qty | 6 | |
5 | SUPERSTRUCTURE Component Weightage 60 | ||||
SUPERSTRUCTURE -1 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
c) Water coming through the deck? | Yes | Bad | Much Qty | 6 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Much Qty | 6 | |
e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | Yes | Bad | Some Qty | 5 | |
SUPERSTRUCTURE -2 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Much Qty | 6 | |
c) Water coming through the deck? | Yes | Bad | Much Qty | 6 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Much Qty | 6 | |
e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | Yes | Bad | Some Qty | 5 | |
SUPERSTRUCTURE -3 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
c) Water coming through the deck? | Yes | Bad | Some Qty | 5 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Much Qty | 6 | |
e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | Yes | Bad | Much Qty | 6 | |
SUPERSTRUCTURE -4 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | Yes | Bad | Some Qty | 5 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Much Qty | 6 | |
c) Water coming through the deck? | Yes | Bad | Some Qty | 5 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Some Qty | 5 | |
e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | Yes | Bad | Some Qty | 5 | |
SUPERSTRUCTURE -5 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Much Qty | 6 | |
c) Water coming through the deck? | Yes | Bad | Some Qty | 5 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Some Qty | 5 | |
e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | Yes | Bad | Some Qty | 5 | |
SUPERSTRUCTURE -6 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
c) Water coming through the deck? | Yes | Bad | Some Qty | 5 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Some Qty | 5 | |
e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | Yes | Bad | Some Qty | 5 | |
SUPERSTRUCTURE -7 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | Yes | Bad | Some Qty | 5 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
c) Water coming through the deck? | Yes | Bad | Some Qty | 5 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Much Qty | 6 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Some Qty | 5 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | Yes | Bad | Some Qty | 5 | |
SUPERSTRUCTURE -8 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
c) Water coming through the deck? | Yes | Bad | Some Qty | 5 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Some Qty | 5 | |
e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | Yes | Bad | Some Qty | 5 | |
SUPERSTRUCTURE -9 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
c) Water coming through the deck? | Yes | Bad | Some Qty | 5 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Some Qty | 5 | |
e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | Yes | Bad | Some Qty | 5 | |
6 | BEARINGS Component Weightage 10 | ||||
RUBBER BEARINGS | |||||
a) Debris or vegetation around bearings? | Yes | Bad | Some Qty | 5 | |
b) Bad drainage? | Yes | Bad | Some Qty | 5 | |
c) Not enough room for the bridge span to move? | Yes | Bad | Some Qty | 5 | |
d) Bearing not seated properly? | NO Problem | -- | -- | 0 | |
e) Bridge span not seated properly on bearing? | NO Problem | -- | -- | 0 | |
f) Damaged bedding mortar? | Yes | Bad | Some Qty | 5 | |
g) Damaged or loose earthquake restraints? | NO Problem | -- | -- | 0 | |
RUBBER BEARINGS | |||||
a) Splitting, tearing or cracking of rubber? | Yes | Bad | Some Qty | 5 | |
b) Damaged bedding mortar? | Yes | Bad | Some Qty | 5 | |
7 | Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
A- GENERAL | |||||
a) Erosion or scour at abutment? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundation? | Yes | Bad | Some Qty | 5 | |
c) Movement of abutment? | Yes | Bad | Some Qty | 5 | |
d) Debris against abutment? | Yes | Bad | Much Qty | 6 | |
e) Vegetation growing on-or in abutment? | Yes | Bad | Some Qty | 5 | |
f) Scour near to retaining walls? | Yes | Bad | Some Qty | 5 | |
g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
h) Water leaking down through the expansion joint? | Yes | Bad | Some Qty | 5 | |
B- DRAINAGE SYSTEM | |||||
a) Not enough weepholes? | Yes | Bad | Some Qty | 5 | |
b) Weepholes not working? | NO Problem | -- | -- | 0 | |
c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
C- CONCRETE WALLS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
D- MASONRY WALLS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Bulging? | NO Problem | -- | -- | 0 | |
c) Poor pointing? | NO Problem | -- | -- | 0 | |
d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
a) Scour at base of slopes? | Yes | Bad | Some Qty | 5 | |
b) Slippage of fill? | NO Problem | -- | -- | 0 | |
c) Erosion of fill? | NO Problem | -- | -- | 0 | |
d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
8 | Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
A- GENERAL | |||||
a) Erosion or scour at abutment? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundation? | Yes | Bad | Some Qty | 5 | |
c) Movement of abutment? | NO Problem | -- | -- | 0 | |
d) Debris against abutment? | Yes | Bad | Some Qty | 5 | |
e) Vegetation growing on-or in abutment? | Yes | Bad | Some Qty | 5 | |
f) Scour near to retaining walls? | Yes | Bad | Some Qty | 5 | |
g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
h) Water leaking down through the expansion joint? | Yes | Bad | Some Qty | 5 | |
B- DRAINAGE SYSTEM | |||||
a) Not enough weepholes? | Yes | Bad | Some Qty | 5 | |
b) Weepholes not working? | Yes | Bad | Some Qty | 5 | |
c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
C- CONCRETE WALLS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
D- MASONRY WALLS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Bulging? | NO Problem | -- | -- | 0 | |
c) Poor pointing? | NO Problem | -- | -- | 0 | |
d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
a) Scour at base of slopes? | Yes | Bad | Some Qty | 5 | |
b) Slippage of fill? | Yes | Bad | Some Qty | 5 | |
c) Erosion of fill? | NO Problem | -- | -- | 0 | |
d) Cracking of road or embankment edge? | Yes | Bad | Some Qty | 5 | |
e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
9 | Embankments Component Weightage 10 | ||||
A- STONE PITCHING SLOPE PROTECTION | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Poor pointing? | NO Problem | -- | -- | 0 | |
c) Scour or erosion at edge? | Yes | Bad | Some Qty | 5 | |
d) Pieces broken off? | NO Problem | -- | -- | 0 | |
e) Piping failure of fill? | Yes | Bad | Some Qty | 5 | |
B- SLOPE PROTECTION WITH CRATES | |||||
a) Not much movement of crates? | Yes | Bad | Some Qty | 5 | |
b) Damage to crates or ties? | Yes | Bad | Some Qty | 5 | |
C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS | |||||
a) Slope getting washed out? | NO Problem | -- | -- | 0 | |
b) Settlement? | NO Problem | -- | -- | 0 | |
10 | RIVER BED Component Weightage 10 | ||||
A- BED PROTECTION AND APRONS | |||||
a) Large holes in the river bed? | Yes | Bad | Some Qty | 5 | |
b) Loss of material | Yes | Bad | Some Qty | 5 | |
c) Crates broken away from pier or abutment? | NO Problem | -- | -- | 0 | |
d) Damage to wires or ties? | NO Problem | -- | -- | 0 | |
B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS | |||||
a) Scour at edge? | Yes | Bad | Some Qty | 5 | |
b) Cracking? | Yes | Bad | Some Qty | 5 | |
c) Spalling or stones missing? | NO Problem | -- | -- | 0 | |
d) Erosion of surface? | Yes | Bad | Some Qty | 5 | |
e) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
11 | PIERs Component Weightage 60 | ||||
Pier-1 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | Yes | Bad | Much Qty | 6 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
CONCRETE PIERS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-2 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
CONCRETE PIERS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-3 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
CONCRETE PIERS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-4 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | Yes | Bad | Much Qty | 6 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
CONCRETE PIERS | |||||
a) Cracking? | Yes | Bad | Much Qty | 6 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
Pier-5 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
CONCRETE PIERS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-6 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-7 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | Yes | Bad | Some Qty | 5 | |
d) Impact damage? | Yes | Bad | Some Qty | 5 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
CONCRETE PIERS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-8 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
CONCRETE PIERS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 |
End of Report