on Chainage 20.135 of From km 16 of Rishikesh Bhaniawala road to Agarwal Bakers via Airport, Thano, Raipur, Pulia Number 6 Fawara Chowk state highway
In District Dehradun Under TD Rishikesh Division
Critical Report on Bridge Condition
Form Filled By Ompal Singh [65006210]
Inspection Team
"270 meter length bridge at km 21 of raipur thano motor road over song river is inspected. The left side protection work and training works had been damaged in last monsoon. Immediate restoration required. River is changing path due.to meandering tendency additional river training work shall be required to channeling the flow. A lot of debris is accumulated in river bed near piers, dredging of accommodation required before monsoon."
(Ompal Singh)
Superintending Engineer Civil
on Mar 12, 2026
Detail Report
| # | Parameter | Problem ? | How Bad? | How Much? | |
|---|---|---|---|---|---|
| 1 | ROAD APPROCHES AND DECK Component Weightage 10 | ||||
| A- ROAD SURFACE NEAR BRIDGE | |||||
| a) Bumpy road surface near bridge? | NO Problem | -- | -- | 0 | |
| B- DRAINAGE | |||||
| a) Badly built road drainage near bridge? | NO Problem | -- | -- | 0 | |
| b) Blocked or damaged road drains? | Yes | Bad | Some Qty | 5 | |
| c) Water on the deck? | Yes | Bad | Some Qty | 5 | |
| d) Blocked or damaged deck drains? | Yes | Bad | Some Qty | 5 | |
| C- WEARING COAT | |||||
| BITUMEN WEARING COURSE | |||||
| a) Surface breaking up or lifting off? | NO Problem | -- | -- | 0 | |
| b) Cracking above joints ? | NO Problem | -- | -- | 0 | |
| D- KERBS & FOOTPATHS | |||||
| a) Loose railing fixtures? | NO Problem | -- | -- | 0 | |
| a) Damaged or loose kerbs? | NO Problem | -- | -- | 0 | |
| 2 | PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10 | ||||
| a) Impact damaged? | NO Problem | -- | -- | 0 | |
| b) Loose or damaged fixings? | NO Problem | -- | -- | 0 | |
| c) Loose base of posts? | NO Problem | -- | -- | 0 | |
| d) Damaged coatirig or paint on steel surface? | NO Problem | -- | -- | 0 | |
| e) Corrosion on steel surface? | NO Problem | -- | -- | 0 | |
| f) Cracking on Masonary Parapets? | NO Problem | -- | -- | 0 | |
| g) Movement or bending of parapet? | NO Problem | -- | -- | 0 | |
| h) Poor pointing/ Plaster on parapet? | NO Problem | -- | -- | 0 | |
| i) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| 3 | EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10 | ||||
| a) Damage to concrete of deck end or dirt wall near joint? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation in joint? | Yes | Bad | Some Qty | 5 | |
| c) Loose or damaged fixtures? | NO Problem | -- | -- | 0 | |
| d) Damage or corrosion to metal parts? | NO Problem | -- | -- | 0 | |
| e) Damage to rubber waterseals? | NO Problem | -- | -- | 0 | |
| 4 | RIVER Component Weightage 10 | ||||
| A- BLOCKAGES IN WATERWAY | |||||
| a) Debris against piers or abutments? | Yes | Bad | Much Qty | 6 | |
| b) Remains of old bridge under or upstream of the bridge? | NO Problem | -- | -- | 0 | |
| c) Fencing or buildings under bridge? | NO Problem | -- | -- | 0 | |
| d) Trees or bushes.growing under bridge? | Yes | Bad | Some Qty | 5 | |
| B- CHANGE IN RIVER COURSE | |||||
| a) River changing path upstream of bridge? | Yes | Bad | Much Qty | 6 | |
| b) New islands forming upstream of bridge? | Yes | Bad | Much Qty | 6 | |
| C- RIVER TRAINING WORKS | |||||
| a) River attack beyond the upstream end of river training works? | Yes | Bad | Some Qty | 5 | |
| b) Damage to walls? | Yes | Bad | Much Qty | 6 | |
| c) Loss of pitching? | Yes | Bad | Some Qty | 5 | |
| d) Damage to crates, timber, fencing, etc.? | Yes | Bad | Some Qty | 5 | |
| e) Damage to trees? | Yes | Bad | Some Qty | 5 | |
| 5 | SUPERSTRUCTURE Component Weightage 60 | ||||
| SUPERSTRUCTURE -1 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| SUPERSTRUCTURE -2 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| SUPERSTRUCTURE -3 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| SUPERSTRUCTURE -4 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| SUPERSTRUCTURE -5 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Some Qty | 5 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| SUPERSTRUCTURE -6 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| SUPERSTRUCTURE -7 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Some Qty | 5 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| SUPERSTRUCTURE -8 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Some Qty | 5 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| SUPERSTRUCTURE -9 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Bad | Some Qty | 5 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| 6 | BEARINGS Component Weightage 10 | ||||
| RUBBER BEARINGS | |||||
| a) Debris or vegetation around bearings? | NO Problem | -- | -- | 0 | |
| b) Bad drainage? | Yes | Bad | Some Qty | 5 | |
| c) Not enough room for the bridge span to move? | NO Problem | -- | -- | 0 | |
| d) Bearing not seated properly? | NO Problem | -- | -- | 0 | |
| e) Bridge span not seated properly on bearing? | NO Problem | -- | -- | 0 | |
| f) Damaged bedding mortar? | NO Problem | -- | -- | 0 | |
| g) Damaged or loose earthquake restraints? | NO Problem | -- | -- | 0 | |
| RUBBER BEARINGS | |||||
| a) Splitting, tearing or cracking of rubber? | Yes | Bad | Some Qty | 5 | |
| b) Damaged bedding mortar? | NO Problem | -- | -- | 0 | |
| 7 | Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | NO Problem | -- | -- | 0 | |
| b) Damage to foundation? | NO Problem | -- | -- | 0 | |
| c) Movement of abutment? | NO Problem | -- | -- | 0 | |
| d) Debris against abutment? | NO Problem | -- | -- | 0 | |
| e) Vegetation growing on-or in abutment? | Yes | Bad | Some Qty | 5 | |
| f) Scour near to retaining walls? | Yes | Bad | Some Qty | 5 | |
| g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
| h) Water leaking down through the expansion joint? | NO Problem | -- | -- | 0 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | Yes | Bad | Some Qty | 5 | |
| b) Weepholes not working? | Yes | Bad | Some Qty | 5 | |
| c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Bulging? | NO Problem | -- | -- | 0 | |
| c) Poor pointing? | NO Problem | -- | -- | 0 | |
| d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | NO Problem | -- | -- | 0 | |
| b) Slippage of fill? | NO Problem | -- | -- | 0 | |
| c) Erosion of fill? | NO Problem | -- | -- | 0 | |
| d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| 8 | Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | Yes | Bad | Some Qty | 5 | |
| b) Damage to foundation? | NO Problem | -- | -- | 0 | |
| c) Movement of abutment? | NO Problem | -- | -- | 0 | |
| d) Debris against abutment? | Yes | Bad | Some Qty | 5 | |
| e) Vegetation growing on-or in abutment? | NO Problem | -- | -- | 0 | |
| f) Scour near to retaining walls? | Yes | Bad | Some Qty | 5 | |
| g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
| h) Water leaking down through the expansion joint? | NO Problem | -- | -- | 0 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | NO Problem | -- | -- | 0 | |
| b) Weepholes not working? | Yes | Bad | Some Qty | 5 | |
| c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Bulging? | NO Problem | -- | -- | 0 | |
| c) Poor pointing? | NO Problem | -- | -- | 0 | |
| d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | NO Problem | -- | -- | 0 | |
| b) Slippage of fill? | NO Problem | -- | -- | 0 | |
| c) Erosion of fill? | NO Problem | -- | -- | 0 | |
| d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| 9 | Embankments Component Weightage 10 | ||||
| A- STONE PITCHING SLOPE PROTECTION | |||||
| a) Cracking? | Yes | Bad | Much Qty | 6 | |
| b) Poor pointing? | Yes | Bad | Some Qty | 5 | |
| c) Scour or erosion at edge? | Yes | Bad | Some Qty | 5 | |
| d) Pieces broken off? | Yes | Bad | Some Qty | 5 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| B- SLOPE PROTECTION WITH CRATES | |||||
| a) Not much movement of crates? | Yes | Bad | Some Qty | 5 | |
| b) Damage to crates or ties? | NO Problem | -- | -- | 0 | |
| C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS | |||||
| a) Slope getting washed out? | Yes | Bad | Some Qty | 5 | |
| b) Settlement? | Yes | Bad | Some Qty | 5 | |
| 10 | RIVER BED Component Weightage 10 | ||||
| A- BED PROTECTION AND APRONS | |||||
| a) Large holes in the river bed? | Yes | Bad | Some Qty | 5 | |
| b) Loss of material | NO Problem | -- | -- | 0 | |
| c) Crates broken away from pier or abutment? | Yes | Bad | Some Qty | 5 | |
| d) Damage to wires or ties? | Yes | Bad | Some Qty | 5 | |
| B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS | |||||
| a) Scour at edge? | NO Problem | -- | -- | 0 | |
| b) Cracking? | NO Problem | -- | -- | 0 | |
| c) Spalling or stones missing? | NO Problem | -- | -- | 0 | |
| d) Erosion of surface? | NO Problem | -- | -- | 0 | |
| e) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| 11 | PIERs Component Weightage 60 | ||||
| Pier-1 | |||||
| TYPE - CONCRETE PIERS | |||||
| a) Scour near base of pier? | Yes | Bad | Not Much Qty | 4 | |
| b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
| c) Movement of pier? | NO Problem | -- | -- | 0 | |
| d) Impact damage? | NO Problem | -- | -- | 0 | |
| e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
| f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
| CONCRETE PIERS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| Pier-2 | |||||
| TYPE - CONCRETE PIERS | |||||
| a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
| b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
| c) Movement of pier? | NO Problem | -- | -- | 0 | |
| d) Impact damage? | NO Problem | -- | -- | 0 | |
| e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
| f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
| CONCRETE PIERS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| Pier-3 | |||||
| TYPE - CONCRETE PIERS | |||||
| a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
| b) Damage to foundations? | NO Problem | -- | -- | 0 | |
| c) Movement of pier? | NO Problem | -- | -- | 0 | |
| d) Impact damage? | NO Problem | -- | -- | 0 | |
| e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
| f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
| CONCRETE PIERS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| Pier-4 | |||||
| TYPE - CONCRETE PIERS | |||||
| a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
| b) Damage to foundations? | NO Problem | -- | -- | 0 | |
| c) Movement of pier? | NO Problem | -- | -- | 0 | |
| d) Impact damage? | NO Problem | -- | -- | 0 | |
| e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
| f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
| CONCRETE PIERS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| Pier-5 | |||||
| TYPE - CONCRETE PIERS | |||||
| a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
| b) Damage to foundations? | NO Problem | -- | -- | 0 | |
| c) Movement of pier? | NO Problem | -- | -- | 0 | |
| d) Impact damage? | NO Problem | -- | -- | 0 | |
| e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
| f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
| CONCRETE PIERS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| Pier-6 | |||||
| TYPE - CONCRETE PIERS | |||||
| a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
| b) Damage to foundations? | NO Problem | -- | -- | 0 | |
| c) Movement of pier? | NO Problem | -- | -- | 0 | |
| d) Impact damage? | NO Problem | -- | -- | 0 | |
| e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
| f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
| CONCRETE PIERS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| Pier-7 | |||||
| TYPE - CONCRETE PIERS | |||||
| a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
| b) Damage to foundations? | NO Problem | -- | -- | 0 | |
| c) Movement of pier? | NO Problem | -- | -- | 0 | |
| d) Impact damage? | NO Problem | -- | -- | 0 | |
| e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
| f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
| CONCRETE PIERS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| Pier-8 | |||||
| TYPE - CONCRETE PIERS | |||||
| a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
| b) Damage to foundations? | NO Problem | -- | -- | 0 | |
| c) Movement of pier? | NO Problem | -- | -- | 0 | |
| d) Impact damage? | Yes | Bad | Some Qty | 5 | |
| e) Vegetation growirig on pier? | Yes | Bad | Some Qty | 5 | |
| f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
| CONCRETE PIERS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
End of Report