on Chainage 1.050 of Dhanari to Pipli (Thati Bend) to Dharkot Musadgaon motor road (24m. span single lane steel girder bridge)
In District Uttarkashi Under PD Uttarkashi Division
Critical Report on Bridge Condition
Form Filled By Ajay Prakash [380017200]
Inspection Team
Detail Report
# | Parameter | Problem ? | How Bad? | How Much? | |
---|---|---|---|---|---|
1 | ROAD APPROCHES AND DECK Component Weightage 10 | ||||
A- ROAD SURFACE NEAR BRIDGE | |||||
a) Bumpy road surface near bridge? | Yes | Bad | Some Qty | 5 | |
B- DRAINAGE | |||||
a) Badly built road drainage near bridge? | Not Applicable | -- | -- | -- | |
b) Blocked or damaged road drains? | Not Applicable | -- | -- | -- | |
c) Water on the deck? | Not Applicable | -- | -- | -- | |
d) Blocked or damaged deck drains? | Not Applicable | -- | -- | -- | |
C- WEARING COAT | |||||
CONCRETE WEARING COURSE | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | Yes | Bad | Some Qty | 5 | |
c) Reinforcement exposed? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Wear of surface due to small stones? | NO Problem | -- | -- | 0 | |
D- KERBS & FOOTPATHS | |||||
a) Loose railing fixtures? | Not Applicable | -- | -- | -- | |
a) Damaged or loose kerbs? | Not Applicable | -- | -- | -- | |
2 | PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10 | ||||
a) Impact damaged? | Yes | Bad | Much Qty | 6 | |
b) Loose or damaged fixings? | Yes | Bad | Much Qty | 6 | |
c) Loose base of posts? | Yes | Bad | Much Qty | 6 | |
d) Damaged coatirig or paint on steel surface? | Yes | Bad | Much Qty | 6 | |
e) Corrosion on steel surface? | Yes | Bad | Much Qty | 6 | |
f) Cracking on Masonary Parapets? | Not Applicable | -- | -- | -- | |
g) Movement or bending of parapet? | Not Applicable | -- | -- | -- | |
h) Poor pointing/ Plaster on parapet? | Not Applicable | -- | -- | -- | |
i) Deterioration of bricks or stones? | Not Applicable | -- | -- | -- | |
3 | EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10 | ||||
a) Damage to concrete of deck end or dirt wall near joint? | Not Applicable | -- | -- | -- | |
b) Debris or vegetation in joint? | Not Applicable | -- | -- | -- | |
c) Loose or damaged fixtures? | Not Applicable | -- | -- | -- | |
d) Damage or corrosion to metal parts? | Not Applicable | -- | -- | -- | |
e) Damage to rubber waterseals? | Not Applicable | -- | -- | -- | |
4 | RIVER Component Weightage 10 | ||||
A- BLOCKAGES IN WATERWAY | |||||
a) Debris against piers or abutments? | Yes | Bad | Much Qty | 6 | |
b) Remains of old bridge under or upstream of the bridge? | Not Applicable | -- | -- | -- | |
c) Fencing or buildings under bridge? | Not Applicable | -- | -- | -- | |
d) Trees or bushes.growing under bridge? | NO Problem | -- | -- | 0 | |
B- CHANGE IN RIVER COURSE | |||||
a) River changing path upstream of bridge? | NO Problem | -- | -- | 0 | |
b) New islands forming upstream of bridge? | NO Problem | -- | -- | 0 | |
C- RIVER TRAINING WORKS | |||||
a) River attack beyond the upstream end of river training works? | Yes | Bad | Some Qty | 5 | |
b) Damage to walls? | Yes | Bad | Much Qty | 6 | |
c) Loss of pitching? | NO Problem | -- | -- | 0 | |
d) Damage to crates, timber, fencing, etc.? | Yes | Bad | Much Qty | 6 | |
e) Damage to trees? | NO Problem | -- | -- | 0 | |
5 | SUPERSTRUCTURE Component Weightage 60 | ||||
SUPERSTRUCTURE -1 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
SUPERSTRUCTURE -2 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
SUPERSTRUCTURE -3 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
SUPERSTRUCTURE -4 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
SUPERSTRUCTURE -5 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
SUPERSTRUCTURE -6 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
SUPERSTRUCTURE -7 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
SUPERSTRUCTURE -8 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
SUPERSTRUCTURE -9 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
SUPERSTRUCTURE -10 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
6 | BEARINGS Component Weightage 10 | ||||
NOT APPLICABLE | |||||
7 | Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
A- GENERAL | |||||
a) Erosion or scour at abutment? | NO Problem | -- | -- | 0 | |
b) Damage to foundation? | NO Problem | -- | -- | 0 | |
c) Movement of abutment? | NO Problem | -- | -- | 0 | |
d) Debris against abutment? | Yes | Bad | Much Qty | 6 | |
e) Vegetation growing on-or in abutment? | NO Problem | -- | -- | 0 | |
f) Scour near to retaining walls? | Not Applicable | -- | -- | -- | |
g) Movement of retaining walls? | Not Applicable | -- | -- | -- | |
h) Water leaking down through the expansion joint? | NO Problem | -- | -- | 0 | |
B- DRAINAGE SYSTEM | |||||
a) Not enough weepholes? | Not Applicable | -- | -- | -- | |
b) Weepholes not working? | Not Applicable | -- | -- | -- | |
c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
C- CONCRETE WALLS | |||||
a) Cracking? | Not Applicable | -- | -- | -- | |
b) Spalling? | Not Applicable | -- | -- | -- | |
c) Corrosion of reinforcement? | Not Applicable | -- | -- | -- | |
d) Poor concrete? | Not Applicable | -- | -- | -- | |
D- MASONRY WALLS | |||||
a) Cracking? | Not Applicable | -- | -- | -- | |
b) Bulging? | Not Applicable | -- | -- | -- | |
c) Poor pointing? | Not Applicable | -- | -- | -- | |
d) Deterioration of bricks or stones? | Not Applicable | -- | -- | -- | |
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
a) Scour at base of slopes? | NO Problem | -- | -- | 0 | |
b) Slippage of fill? | NO Problem | -- | -- | 0 | |
c) Erosion of fill? | NO Problem | -- | -- | 0 | |
d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
8 | Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
A- GENERAL | |||||
a) Erosion or scour at abutment? | NO Problem | -- | -- | 0 | |
b) Damage to foundation? | NO Problem | -- | -- | 0 | |
c) Movement of abutment? | NO Problem | -- | -- | 0 | |
d) Debris against abutment? | Yes | Bad | Much Qty | 6 | |
e) Vegetation growing on-or in abutment? | NO Problem | -- | -- | 0 | |
f) Scour near to retaining walls? | Not Applicable | -- | -- | -- | |
g) Movement of retaining walls? | Not Applicable | -- | -- | -- | |
h) Water leaking down through the expansion joint? | NO Problem | -- | -- | 0 | |
B- DRAINAGE SYSTEM | |||||
a) Not enough weepholes? | Not Applicable | -- | -- | -- | |
b) Weepholes not working? | Not Applicable | -- | -- | -- | |
c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
C- CONCRETE WALLS | |||||
a) Cracking? | Not Applicable | -- | -- | -- | |
b) Spalling? | Not Applicable | -- | -- | -- | |
c) Corrosion of reinforcement? | Not Applicable | -- | -- | -- | |
d) Poor concrete? | Not Applicable | -- | -- | -- | |
D- MASONRY WALLS | |||||
a) Cracking? | Not Applicable | -- | -- | -- | |
b) Bulging? | Not Applicable | -- | -- | -- | |
c) Poor pointing? | Not Applicable | -- | -- | -- | |
d) Deterioration of bricks or stones? | Not Applicable | -- | -- | -- | |
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
a) Scour at base of slopes? | NO Problem | -- | -- | 0 | |
b) Slippage of fill? | NO Problem | -- | -- | 0 | |
c) Erosion of fill? | NO Problem | -- | -- | 0 | |
d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
9 | Embankments Component Weightage 10 | ||||
A- STONE PITCHING SLOPE PROTECTION | |||||
a) Cracking? | Not Applicable | -- | -- | -- | |
b) Poor pointing? | Not Applicable | -- | -- | -- | |
c) Scour or erosion at edge? | Not Applicable | -- | -- | -- | |
d) Pieces broken off? | Not Applicable | -- | -- | -- | |
e) Piping failure of fill? | Not Applicable | -- | -- | -- | |
B- SLOPE PROTECTION WITH CRATES | |||||
a) Not much movement of crates? | Not Applicable | -- | -- | -- | |
b) Damage to crates or ties? | Not Applicable | -- | -- | -- | |
C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS | |||||
a) Slope getting washed out? | Not Applicable | -- | -- | -- | |
b) Settlement? | Not Applicable | -- | -- | -- | |
10 | RIVER BED Component Weightage 10 | ||||
A- BED PROTECTION AND APRONS | |||||
a) Large holes in the river bed? | NO Problem | -- | -- | 0 | |
b) Loss of material | NO Problem | -- | -- | 0 | |
c) Crates broken away from pier or abutment? | Yes | Bad | Much Qty | 6 | |
d) Damage to wires or ties? | NO Problem | -- | -- | 0 | |
B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS | |||||
a) Scour at edge? | NO Problem | -- | -- | 0 | |
b) Cracking? | NO Problem | -- | -- | 0 | |
c) Spalling or stones missing? | NO Problem | -- | -- | 0 | |
d) Erosion of surface? | NO Problem | -- | -- | 0 | |
e) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
11 | PIERs Component Weightage 60 | ||||
Pier-1 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | NO Problem | -- | -- | 0 | |
b) Damage to foundations? | NO Problem | -- | -- | 0 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-2 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | NO Problem | -- | -- | 0 | |
b) Damage to foundations? | NO Problem | -- | -- | 0 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-3 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | NO Problem | -- | -- | 0 | |
b) Damage to foundations? | NO Problem | -- | -- | 0 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-4 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | NO Problem | -- | -- | 0 | |
b) Damage to foundations? | NO Problem | -- | -- | 0 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-5 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | NO Problem | -- | -- | 0 | |
b) Damage to foundations? | NO Problem | -- | -- | 0 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-6 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | NO Problem | -- | -- | 0 | |
b) Damage to foundations? | NO Problem | -- | -- | 0 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-7 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | NO Problem | -- | -- | 0 | |
b) Damage to foundations? | NO Problem | -- | -- | 0 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-8 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | NO Problem | -- | -- | 0 | |
b) Damage to foundations? | NO Problem | -- | -- | 0 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 | |
Pier-9 | |||||
TYPE - CONCRETE PIERS | |||||
a) Scour near base of pier? | NO Problem | -- | -- | 0 | |
b) Damage to foundations? | NO Problem | -- | -- | 0 | |
c) Movement of pier? | NO Problem | -- | -- | 0 | |
d) Impact damage? | NO Problem | -- | -- | 0 | |
e) Vegetation growirig on pier? | NO Problem | -- | -- | 0 | |
f) Water Leaking past expansion joint | NO Problem | -- | -- | 0 | |
CONCRETE PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Spalling? | NO Problem | -- | -- | 0 | |
c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
d) Poor concrete? | NO Problem | -- | -- | 0 |
End of Report