Bridge (ID- 1743 ) Inventory Report

Suspension Bridge

Data finalized On 26 Nov 2022

By Er. Mahendra Singh Dawan

Last Rated On 13 Jun 2026

Rating 21.98%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : PD Pauri

General

Bridge Type : Pedestrain Bridge
Structure No : 73/1
Feature Intersected : Nayar River
Name of Bridge : Suspension Bridge
Nearest Town : Vyaschatti
Latitude (Northing) : 30.05980000
Longitude (Easting) : 78.59675000
Construction Year : 2010
Inventory Year : 2022
Work Code(s) : --

Geometric

Overall length (in meter) : 43.00
Total No of Span : 1
Maximuam Span (in meter) : 43.00
Span Arragment : 1x43.00
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.750
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 444.000
OFL Ordinary Flood Level : 440.000
LWL Low Water Level : 436.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 455.960
Road Level at Centre : 456.000
Design Scour Level at Pier :
Design Scour Level at Abutments : 452.000
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided