Bridge (ID- 1862 ) Inventory Report

100 Mtr Span Suspension Bridge Block Kapkot to Tahsil Kapkot

Data finalized On 27 Aug 2022

By Er. Deepak chandra Upreti

Last Rated On 25 May 2024

Rating 9.75%

Categorized As

XXXXX on XX-XX-XXXX

In District : Bageshwar Under Division : CD Kapkot

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Saryu
Name of Bridge : 100 Mtr Span Suspension Bridge Block Kapkot to Tahsil Kapkot
Nearest Town : Kapkot
Latitude (Northing) : 29.94409900
Longitude (Easting) : 79.89995700
Construction Year : 2020
Inventory Year : 2020

Geometric

Overall length (in meter) : 100.00
Total No of Span : 1
Maximuam Span (in meter) : 100.00
Span Arragment : 1x100
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 7
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1002.500
OFL Ordinary Flood Level : 1000.500
LWL Low Water Level : 1000.000
Design Velocity (m/Sec) : 5.00
Design Discharge (Cumecs) : 850.00
Soffit Level at Centre : 1009.500
Road Level at Centre : 1010.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum Concrete Block
Bank Protection Right Side of Up-stream : Plum Concrete Block
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided