Data finalized On 09 Sep 2022
By Er. Govind Singh Mahara
Last Rated On 28 Jun 2024
Rating 0.56%
Categorized As
XXXXX on XX-XX-XXXX
In District : Bageshwar Under Division : CD Kapkot
General
Bridge Type :
Pedestrain Bridge
Structure No :
1/1
Feature Intersected :
Rewati River
Name of Bridge :
24.00 Mtr Span pedestrin Bridge At Baret
Nearest Town :
Baret
Latitude (Northing) :
29.98571100
Longitude (Easting) :
79.95229700
Construction Year :
2005
Inventory Year :
2010
Geometric
Overall length (in meter) :
24.00
Total No of Span :
1
Maximuam Span (in meter) :
24.00
Span Arragment :
1x24
No of Lane :
1.000
Overall Width (m) :
2.000
Carriageway Width (m) :
2.000
RS Footpath Width (m) :
0.000
LS Footpath Width (m) :
0.000
Approch Width i/c Shoulders (m) :
2.000
Gradient (%age) :
0
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
1201.500
OFL Ordinary Flood Level :
1200.500
LWL Low Water Level :
1200.000
Design Velocity (m/Sec) :
5.00
Design Discharge (Cumecs) :
1200.00
Soffit Level at Centre :
1205.250
Road Level at Centre :
1206.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition :
Moderate
Seismic Importance factor :
0.0
Design Loading :
Footpath Live Load
Load Rating :
Footpath Live Load
Super-Structure
Superstructure Type :
Truss
Superstructure Material :
Steel
Wearing Coat Type :
Other
Expension Joint Type :
Single Strip/Box Seal Joint
Railing/Crash Barrier type :
Steel rolled section
Bearing type :
Roller & Rocker
Sub-Structure
Founding Strata :
Bouldery
Abutment Foundation Type :
Raft
Pier Foundation Type :
NA
No of Piers :
0
Abutment Type :
Stone Masonry
Pier Type :
NA
Protection Work
Bank Protection Left Side of Up-stream :
Plum Concrete Block
Bank Protection Right Side of Up-stream :
Plum Concrete Block
Bank Protection Left Side of Down-stream :
no protection work provided
Bank Protection Right Side of Down-stream :
no protection work provided
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
no protection work provided
Tratment for Corrosion Protection (if any) :
no special treatment provided