Bridge (ID- 2955 ) Inventory Report

120 m span suspension bridge over jalkur river at Piplogi

Data finalized On 05 Jan 2024

By Er. Bhupendra Rawat

Last Rated On 28 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : PD New Tehri

General

Bridge Type : Pedestrain Bridge
Structure No : 1
Feature Intersected : Jalkur gad
Name of Bridge : 120 m span suspension bridge over jalkur river at Piplogi
Nearest Town : Lambgaon
Latitude (Northing) : 30.00000000
Longitude (Easting) : 78.00000000
Construction Year : 2021
Inventory Year : 2022

Geometric

Overall length (in meter) : 120.00
Total No of Span : 1
Maximuam Span (in meter) : 120.00
Span Arragment : 1X120
No of Lane : 1.000
Overall Width (m) : 3.000
Carriageway Width (m) : 3.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 3.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Cable stayed
Superstructure Material : Steel
Wearing Coat Type : Mastic asphalt
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Spherical and Cylindrical

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided