Bridge (ID- 3484 ) Inventory Report

local gadhera bharat sewa On Chainage 0.350 of Tonidali Kakdagad Motor Marg

Data finalized On 07 Jul 2024

By Mukesh prasad painuly

Bridge Yet Not Rated

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : CD Ukhimath

General

Bridge Type : Motor Bridge High Level
Structure No : 1/2
Feature Intersected : local gadhera bharat sewa
Name of Bridge : local gadhera bharat sewa
Nearest Town : ukhimath
Latitude (Northing) : 30.50928200
Longitude (Easting) : 79.02274600
Construction Year : 2023
Inventory Year : 2023

Geometric

Overall length (in meter) : 7.00
Total No of Span : 1
Maximuam Span (in meter) : 7.00
Span Arragment : 1x7
No of Lane : 1.000
Overall Width (m) : 6.500
Carriageway Width (m) : 5.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 103.000
OFL Ordinary Flood Level : 101.000
LWL Low Water Level : 100.000
Design Velocity (m/Sec) : 15.00
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : not provided
Bank Protection Right Side of Up-stream : protection by gabions
Bank Protection Left Side of Down-stream : not provided due to rocky strata
Bank Protection Right Side of Down-stream : not provided due to rocky strata
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided