Bridge (ID- 3491 ) Inventory Report

BALGANGA RIVER On Chainage 0.000 of Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway

Data Yet Not Finalized

Last Rated On 18 Nov 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : TD Ghansaali

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : BALGANGA RIVER
Name of Bridge : BALGANGA RIVER
Nearest Town : KOT VISHAN
Latitude (Northing) : 30.33002100
Longitude (Easting) : 78.25252500
Construction Year : 2020
Inventory Year : 2024

Geometric

Overall length (in meter) : 48.00
Total No of Span : 48
Maximuam Span (in meter) : 48.00
Span Arragment : 1*48
No of Lane : 1.000
Overall Width (m) : 2.500
Carriageway Width (m) : 2.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 3.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : Raft
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided