Bridge (ID- 690 ) Inventory Report

Arch Bridge OF IRRIGATION CANAL at Paheniya shiripur Bichuva Road On Chainage 2.000 of Paheniya Shripur Bichuwa road

Data finalized On 07 Dec 2022

By ER. A. K. SATSANGI

Last Rated On 05 Dec 2024

Rating 67.49%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : CD Khatima

General

Bridge Type : Motor Bridge High Level
Structure No : 1/2
Feature Intersected : Devha River
Name of Bridge : Arch Bridge OF IRRIGATION CANAL at Paheniya shiripur Bichuva Road
Nearest Town : KHATIMA
Latitude (Northing) : 28.94361100
Longitude (Easting) : 79.93222200
Construction Year : 1976
Inventory Year : 2021

Geometric

Overall length (in meter) : 24.00
Total No of Span : 3
Maximuam Span (in meter) : 24.00
Span Arragment : 3*8
No of Lane : 1.000
Overall Width (m) : 3.650
Carriageway Width (m) : 3.650
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 9.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Arch
Superstructure Material : Masonry
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : other
Pier Foundation Type : other
No of Piers : 3
Abutment Type : Brick Masonry
Pier Type : Brick Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided