Bridge (ID- 970 ) Inventory Report

Devta Gadhera On Chainage 134.627 of Thalisain Bhungidhar Deghat Jainal Manila Dotiyal Marchula state highway

Data finalized On 14 Oct 2022

By Manoj Kumar

Last Rated On 16 Nov 2023

Rating 0.40%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : PD Ranikhet

General

Bridge Type : Motor Bridge High Level
Structure No : 135/3
Feature Intersected : Devta Gadhera
Name of Bridge : Devta Gadhera
Nearest Town : Marchula
Latitude (Northing) : 29.60914800
Longitude (Easting) : 79.09655750
Construction Year : 1967
Inventory Year : 2021

Geometric

Overall length (in meter) : 86.87
Total No of Span : 1
Maximuam Span (in meter) : 76.87
Span Arragment : 1x76.87+ 1x10.00
No of Lane : 1.000
Overall Width (m) : 4.750
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.700
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : other

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : other
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : other

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided