Segment [Id - 10] Detail

NH

139.25 Km

Road ID: 10

National Highway [NH119/534]

Starting from its junction with NH-58 near Meerut in the state of Uttar Pradesh and connecting Bijnor Najibabad Kotdwara Pauri and terminating at junction with NH -58 near Srinagar National Highway

राष्ट्रीय मार्ग 58 के जक्शंन मेरठ के निकट से बिजनौर नजीबाबाद कोटद्वार-पौड़ी राष्ट्रीय मार्ग 58 के श्रीनगर स्थान तक राष्ट्रीय राजमार्ग

Segment ID- 10 :

139.250 Km

Top Surface Details of A Uniform Segment Section
#/ID Chainage Top Layer width (m) Top layer thickness (mm) Total Crust thickness (cm) Crust Detail Constructed On Renewed On
1/2829 138.950 - 142.000 BC 7.000 30.0 28.0 G1 10cm+G2 7.5cm+G3 7.5cm+BC 3 cm Mar 1945 May 2024
2/2830 142.000 - 144.000 BC 5.500 30.0 28.0 G1 10cm+G2 7.5cm+G3 7.5cm+BC 3cm Mar 1945 May 2024
3/2831 144.000 - 150.000 BC 5.500 30.0 33.0 G1 10cm+G2 7.5cm+G3 7.5cm+DBM 5cm+BC 3cm Mar 1945 Jul 2022
4/2832 150.000 - 154.000 BC 5.500 30.0 28.0 G1 10cm+G2 7.5cm+G3 7.5cm+BC 3cm Mar 1945 May 2024
5/2833 154.000 - 160.000 BC 5.500 30.0 28.0 G1 10cm+G2 7.5cm+G3 7.5cm+BC 3cm Mar 1945 May 2024
6/2834 160.000 - 174.000 BC 5.500 30.0 33.0 G1 10cm+G2 7.5cm+G3 7.5cm+DBM 5cm+BC 3 cm Mar 1945 Jul 2022
7/2835 174.000 - 194.000 BC 5.500 30.0 28.0 G1 10cm+G2 7.5cm+G3 7.5cm+BC 3cm Mar 1945 May 2024
8/1853 196.000 - 275.020 BC 5.500 25.0 48.0 48.00 Mar 2021 Mar 2021