Segment [Id - 115] Detail

MDR

12 Km

Road ID: 115

Major District Road [H-09]

Badhedi Rajputana Alawalpur motor road

बढेड़ी राजपुताना अलावलपुर मोटर मार्ग

Segment ID- 115 :

12.000 Km

Top Surface Condition of A Uniform Segment Section
#/ID Start Chainage End Chainage KM Condition Patches Inventory Date Data status Current Source for Road Surface maintenance
1/20896 0.000 4.500 1, 2, 3, 4, 5 B: Moderate Detoriation 0 Jul 24, 2026 AR
2/16548 4.500 7.500 5, 6, 7, 8 D: Renewel Required 0 Jul 19, 2025 AR
3/19012 7.500 12.000 8, 9, 10, 11, 12 B: Moderate Detoriation 0 Mar 25, 2026 Reconstruction

Patch work history from MIS

For Division Segment ID - 7862 Total Achivement of 3.000 Km Reported by Chetna Purohit, Assistant Engineer Civil, CD Roorkee on 2025-05-14 08:47:46 against Patch Repair 2025-26 (Pre-Mansoon)

For Division Segment ID - 5603 Total Achivement of 4.500 Km Reported by Ajeet Singh, Assistant Engineer Civil, PD Haridwar on 2025-10-17 05:56:23 against Patch Repair 2025-26 (Post-Mansoon)

For Division Segment ID - 7862 Total Achivement of 0.740 Km Reported by Rahul Arya, Assistant Engineer Civil, CD Roorkee on 2026-08-11 09:55:51 against Patch Repair 2026-27 (Pre-Mansoon)

For Division Segment ID - 5603 Total Achivement of 4.500 Km Reported by Man Mohan Singh, Assistant Engineer Civil, PD Haridwar on 2026-10-16 05:38:13 against Patch Repair 2026-27 (Post-Monsoon)


Historic Data :

#/ID Chainage Condition Patches Inventory Date Status
1/16547 0.000 - 4.500 A: All Ok 0 Jul 19, 2025 Data treated as old on Jul 24, 2026
2/5284 7.500 - 12.000 A: All Ok 0 Dec 18, 2023 Data treated as old on Mar 25, 2026
3/11381 0.000 - 7.500 D: Renewel Required 0 Apr 27, 2024 Data treated as old on Jul 19, 2025
4/5308 0.000 - 7.500 B: Moderate Detoriation 0 Dec 19, 2023 Data treated as old on Apr 27, 2024