Segment [Id - 9707] Detail

SH

188.2 Km

Road ID: 56

State Highway [SH010]

Kathgodam (Ranibag) Bhimtal Khutani Padampuri Dhanachuli Pahadpani Shaharfatak Mornaula Devidhura Lohaghat Pancheswer state highway

काठगोदाम (रानीबाग) भीमताल खुटानी चांफी पदमपुरी धानाचूली पहाड़पानी शहरफाटक मौरनौला देवीधुरा लोहाघाट पंचेश्वर राज्य मार्ग

Segment ID- 9707 :

39.600 Km

Top Surface Condition of A Uniform Segment Section
#/ID Start Chainage End Chainage KM Condition Patches Inventory Date Data status Current Source for Road Surface maintenance
1/22565 147.200 150.000 148, 149, 150 D: Renewel Required 50 Sep 20, 2026 AR
2/22566 150.000 170.000 151, 152, 153, 154, 155, 156, 157, 158, 159, 160, 161, 162, 163, 164, 165, 166, 167, 168, 169, 170 A: All Ok 0 Sep 20, 2026 AR
3/22567 170.000 175.000 171, 172, 173, 174, 175 D: Renewel Required 100 Sep 20, 2026 AR
4/22568 175.000 186.000 176, 177, 178, 179, 180, 181, 182, 183, 184, 185, 186 A: All Ok 0 Sep 20, 2026 AR
5/22569 186.000 186.800 187 D: Renewel Required 25 Sep 20, 2026 AR

Patch work history from MIS

For Division Segment ID - 11496 Total Achivement of 26.000 Km Reported by Rajendra Giri, Assistant Engineer Civil, CD Lohaghat on 2023-10-25 10:28:41 against Patch Repair 2023-24 (I)

For Division Segment ID - 11496 Total Achivement of 8.000 Km Reported by Hitesh Kandpal, Executive Engineer Civil, Engineer-in-Chief Office on 2024-10-12 14:43:21 against Patch Repair 2024-25 (Post-Mansoon)

For Division Segment ID - 11496 Total Achivement of 54.400 Km Reported by Prakash Chandra, Assistant Engineer Civil, CD Lohaghat on 2025-05-15 08:20:12 against Patch Repair 2025-26 (Pre-Mansoon)

For Division Segment ID - 11496 Total Achivement of 10.000 Km Reported by Harish Singh Bathiyal, Assistant Engineer Civil, CD Lohaghat on 2025-10-19 11:08:01 against Patch Repair 2025-26 (Post-Mansoon)


Historic Data :

No Historic Data available