ID :690
Arch Bridge OF IRRIGATION CANAL at Paheniya shiripur Bichuva Road
on Chainage 2.000 of Paheniya Shripur Bichuwa road
In District Udham Singh Nagar Under CD Khatima Division
Critical Report on Bridge Condition
Form Filled By Himanshu Bhatt [370022220]
Inspection Team
Detail Report
# | Parameter | Problem ? | How Bad? | How Much? | |
---|---|---|---|---|---|
1 | ROAD APPROCHES AND DECK Component Weightage 10 | ||||
A- ROAD SURFACE NEAR BRIDGE | |||||
a) Bumpy road surface near bridge? | Yes | Very Bad | Some Qty | 8 | |
B- DRAINAGE | |||||
a) Badly built road drainage near bridge? | NO Problem | -- | -- | 0 | |
b) Blocked or damaged road drains? | NO Problem | -- | -- | 0 | |
c) Water on the deck? | NO Problem | -- | -- | 0 | |
d) Blocked or damaged deck drains? | NO Problem | -- | -- | 0 | |
C- WEARING COAT | |||||
BITUMEN WEARING COURSE | |||||
a) Surface breaking up or lifting off? | NO Problem | -- | -- | 0 | |
b) Cracking above joints ? | NO Problem | -- | -- | 0 | |
D- KERBS & FOOTPATHS | |||||
a) Loose railing fixtures? | NO Problem | -- | -- | 0 | |
a) Damaged or loose kerbs? | NO Problem | -- | -- | 0 | |
2 | PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10 | ||||
a) Impact damaged? | Yes | Bad | Much Qty | 6 | |
b) Loose or damaged fixings? | Yes | Bad | Some Qty | 5 | |
c) Loose base of posts? | Yes | Bad | Some Qty | 5 | |
d) Damaged coatirig or paint on steel surface? | Not Accessible | -- | -- | -- | |
e) Corrosion on steel surface? | Not Accessible | -- | -- | -- | |
f) Cracking on Masonary Parapets? | Yes | Bad | Some Qty | 5 | |
g) Movement or bending of parapet? | Yes | Bad | Some Qty | 5 | |
h) Poor pointing/ Plaster on parapet? | Yes | Bad | Some Qty | 5 | |
i) Deterioration of bricks or stones? | Yes | Very Bad | Some Qty | 8 | |
3 | EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10 | ||||
a) Damage to concrete of deck end or dirt wall near joint? | Yes | Bad | Some Qty | 5 | |
b) Debris or vegetation in joint? | Yes | Bad | Much Qty | 6 | |
c) Loose or damaged fixtures? | Yes | Bad | Some Qty | 5 | |
d) Damage or corrosion to metal parts? | Not Accessible | -- | -- | -- | |
e) Damage to rubber waterseals? | Not Accessible | -- | -- | -- | |
4 | RIVER Component Weightage 10 | ||||
A- BLOCKAGES IN WATERWAY | |||||
a) Debris against piers or abutments? | Yes | Bad | Some Qty | 5 | |
b) Remains of old bridge under or upstream of the bridge? | Yes | Bad | Much Qty | 6 | |
c) Fencing or buildings under bridge? | NO Problem | -- | -- | 0 | |
d) Trees or bushes.growing under bridge? | Yes | Bad | Much Qty | 6 | |
B- CHANGE IN RIVER COURSE | |||||
a) River changing path upstream of bridge? | NO Problem | -- | -- | 0 | |
b) New islands forming upstream of bridge? | NO Problem | -- | -- | 0 | |
C- RIVER TRAINING WORKS | |||||
a) River attack beyond the upstream end of river training works? | NO Problem | -- | -- | 0 | |
b) Damage to walls? | Yes | Bad | Some Qty | 5 | |
c) Loss of pitching? | NO Problem | -- | -- | 0 | |
d) Damage to crates, timber, fencing, etc.? | NO Problem | -- | -- | 0 | |
e) Damage to trees? | NO Problem | -- | -- | 0 | |
5 | SUPERSTRUCTURE Component Weightage 60 | ||||
SUPERSTRUCTURE -1 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | Not Accessible | -- | -- | -- | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Not Accessible | -- | -- | -- | |
c) Water coming through the deck? | Not Accessible | -- | -- | -- | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Not Accessible | -- | -- | -- | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Much Qty | 6 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | Yes | Bad | Some Qty | 5 | |
c) Corrosion of reinforcement? | Yes | Bad | Some Qty | 5 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | Yes | Bad | Some Qty | 5 | |
c) Reinforcement corrosion? | Yes | Bad | Some Qty | 5 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
e) Less cover to reinforcement? | Not Accessible | -- | -- | -- | |
SUPERSTRUCTURE -2 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | Not Accessible | -- | -- | -- | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Not Accessible | -- | -- | -- | |
c) Water coming through the deck? | Yes | Bad | Some Qty | 5 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Not Accessible | -- | -- | -- | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Some Qty | 5 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | Yes | Bad | Some Qty | 5 | |
c) Corrosion of reinforcement? | Yes | Bad | Some Qty | 5 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | Yes | Bad | Some Qty | 5 | |
c) Reinforcement corrosion? | Not Accessible | -- | -- | -- | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
e) Less cover to reinforcement? | Not Accessible | -- | -- | -- | |
SUPERSTRUCTURE -3 | |||||
TYPE - CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | Yes | Bad | Some Qty | 5 | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Some Qty | 5 | |
c) Water coming through the deck? | Yes | Bad | Some Qty | 5 | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Not Accessible | -- | -- | -- | |
e) Not enough vertical & horizontal clearances? | Yes | Bad | Some Qty | 5 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | Yes | Bad | Some Qty | 5 | |
c) Corrosion of reinforcement? | Yes | Bad | Some Qty | 5 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Spalling? | Yes | Bad | Some Qty | 5 | |
c) Reinforcement corrosion? | Yes | Bad | Some Qty | 5 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
e) Less cover to reinforcement? | Not Accessible | -- | -- | -- | |
6 | BEARINGS Component Weightage 10 | ||||
RUBBER BEARINGS | |||||
a) Debris or vegetation around bearings? | Yes | Bad | Some Qty | 5 | |
b) Bad drainage? | Yes | Bad | Some Qty | 5 | |
c) Not enough room for the bridge span to move? | Yes | Bad | Some Qty | 5 | |
d) Bearing not seated properly? | Yes | Bad | Some Qty | 5 | |
e) Bridge span not seated properly on bearing? | Yes | Bad | Some Qty | 5 | |
f) Damaged bedding mortar? | Yes | Bad | Much Qty | 6 | |
g) Damaged or loose earthquake restraints? | Yes | Bad | Some Qty | 5 | |
RUBBER BEARINGS | |||||
a) Splitting, tearing or cracking of rubber? | Not Accessible | -- | -- | -- | |
b) Damaged bedding mortar? | Not Accessible | -- | -- | -- | |
7 | Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
A- GENERAL | |||||
a) Erosion or scour at abutment? | Yes | Bad | Much Qty | 6 | |
b) Damage to foundation? | Yes | Bad | Much Qty | 6 | |
c) Movement of abutment? | Yes | Bad | Some Qty | 5 | |
d) Debris against abutment? | Yes | Bad | Some Qty | 5 | |
e) Vegetation growing on-or in abutment? | Yes | Bad | Some Qty | 5 | |
f) Scour near to retaining walls? | Yes | Bad | Some Qty | 5 | |
g) Movement of retaining walls? | Yes | Bad | Some Qty | 5 | |
h) Water leaking down through the expansion joint? | Yes | Bad | Some Qty | 5 | |
B- DRAINAGE SYSTEM | |||||
a) Not enough weepholes? | Not Accessible | -- | -- | -- | |
b) Weepholes not working? | Not Accessible | -- | -- | -- | |
c) Water leaking through the abutment? | Yes | Bad | Some Qty | 5 | |
C- CONCRETE WALLS | |||||
a) Cracking? | Not Accessible | -- | -- | -- | |
b) Spalling? | Not Accessible | -- | -- | -- | |
c) Corrosion of reinforcement? | Yes | Bad | Some Qty | 5 | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
D- MASONRY WALLS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Bulging? | Yes | Bad | Some Qty | 5 | |
c) Poor pointing? | Yes | Bad | Some Qty | 5 | |
d) Deterioration of bricks or stones? | Yes | Bad | Some Qty | 5 | |
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
a) Scour at base of slopes? | Yes | Bad | Some Qty | 5 | |
b) Slippage of fill? | Yes | Bad | Some Qty | 5 | |
c) Erosion of fill? | Yes | Bad | Some Qty | 5 | |
d) Cracking of road or embankment edge? | Yes | Bad | Some Qty | 5 | |
e) Piping failure of fill? | Yes | Bad | Some Qty | 5 | |
8 | Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
A- GENERAL | |||||
a) Erosion or scour at abutment? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundation? | Yes | Bad | Some Qty | 5 | |
c) Movement of abutment? | Yes | Bad | Some Qty | 5 | |
d) Debris against abutment? | Yes | Bad | Some Qty | 5 | |
e) Vegetation growing on-or in abutment? | Yes | Bad | Much Qty | 6 | |
f) Scour near to retaining walls? | Yes | Bad | Much Qty | 6 | |
g) Movement of retaining walls? | Yes | Bad | Some Qty | 5 | |
h) Water leaking down through the expansion joint? | Yes | Bad | Some Qty | 5 | |
B- DRAINAGE SYSTEM | |||||
a) Not enough weepholes? | Yes | Bad | Some Qty | 5 | |
b) Weepholes not working? | Yes | Bad | Some Qty | 5 | |
c) Water leaking through the abutment? | Yes | Bad | Some Qty | 5 | |
C- CONCRETE WALLS | |||||
a) Cracking? | Not Accessible | -- | -- | -- | |
b) Spalling? | Not Accessible | -- | -- | -- | |
c) Corrosion of reinforcement? | Not Accessible | -- | -- | -- | |
d) Poor concrete? | Yes | Bad | Some Qty | 5 | |
D- MASONRY WALLS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Bulging? | Yes | Bad | Not Much Qty | 4 | |
c) Poor pointing? | Yes | Bad | Some Qty | 5 | |
d) Deterioration of bricks or stones? | Yes | Bad | Some Qty | 5 | |
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
a) Scour at base of slopes? | Yes | Bad | Some Qty | 5 | |
b) Slippage of fill? | Yes | Bad | Some Qty | 5 | |
c) Erosion of fill? | Yes | Bad | Some Qty | 5 | |
d) Cracking of road or embankment edge? | Yes | Bad | Some Qty | 5 | |
e) Piping failure of fill? | Yes | Bad | Some Qty | 5 | |
9 | Embankments Component Weightage 10 | ||||
A- STONE PITCHING SLOPE PROTECTION | |||||
a) Cracking? | Not Accessible | -- | -- | -- | |
b) Poor pointing? | Not Accessible | -- | -- | -- | |
c) Scour or erosion at edge? | Not Accessible | -- | -- | -- | |
d) Pieces broken off? | Not Accessible | -- | -- | -- | |
e) Piping failure of fill? | Not Accessible | -- | -- | -- | |
B- SLOPE PROTECTION WITH CRATES | |||||
a) Not much movement of crates? | Not Accessible | -- | -- | -- | |
b) Damage to crates or ties? | Not Accessible | -- | -- | -- | |
C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS | |||||
a) Slope getting washed out? | Not Accessible | -- | -- | -- | |
b) Settlement? | Not Accessible | -- | -- | -- | |
10 | RIVER BED Component Weightage 10 | ||||
A- BED PROTECTION AND APRONS | |||||
a) Large holes in the river bed? | Yes | Bad | Some Qty | 5 | |
b) Loss of material | Yes | Bad | Some Qty | 5 | |
c) Crates broken away from pier or abutment? | Yes | Bad | Much Qty | 6 | |
d) Damage to wires or ties? | Not Accessible | -- | -- | -- | |
B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS | |||||
a) Scour at edge? | Not Accessible | -- | -- | -- | |
b) Cracking? | Not Accessible | -- | -- | -- | |
c) Spalling or stones missing? | Yes | Bad | Some Qty | 5 | |
d) Erosion of surface? | Yes | Bad | Some Qty | 5 | |
e) Corrosion of reinforcement? | Yes | Bad | Some Qty | 5 | |
11 | PIERs Component Weightage 60 | ||||
Pier-1 | |||||
TYPE - MASONRY PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | Yes | Bad | Some Qty | 5 | |
d) Impact damage? | Yes | Bad | Some Qty | 5 | |
e) Vegetation growirig on pier? | Yes | Bad | Much Qty | 6 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
MASONRY PIERS | |||||
a) Cracking? | NO Problem | -- | -- | 0 | |
b) Poor pointing? | NO Problem | -- | -- | 0 | |
c) Deterioration of masonry | NO Problem | -- | -- | 0 | |
Pier-2 | |||||
TYPE - MASONRY PIERS | |||||
a) Scour near base of pier? | Yes | Bad | Some Qty | 5 | |
b) Damage to foundations? | Yes | Bad | Some Qty | 5 | |
c) Movement of pier? | Yes | Bad | Some Qty | 5 | |
d) Impact damage? | Yes | Bad | Some Qty | 5 | |
e) Vegetation growirig on pier? | Yes | Bad | Much Qty | 6 | |
f) Water Leaking past expansion joint | Yes | Bad | Some Qty | 5 | |
MASONRY PIERS | |||||
a) Cracking? | Yes | Bad | Some Qty | 5 | |
b) Poor pointing? | Yes | Bad | Some Qty | 5 | |
c) Deterioration of masonry | Yes | Bad | Some Qty | 5 |
End of Report