725
|
|
PD Bageshwar |
|
48m span steel girder motor bridge |
Truss |
Motor Bridge High Level |
Class A |
2017 |
48.00 |
4.750 |
631
|
Khatigaon link motor road
|
1.975 |
0.00 %
|
16-05-2024
|
Kulur river |
Kanda |
VR
|
|
727
|
|
PD Bageshwar |
|
15m span rcc motor bridge |
Solid slab |
Motor Bridge High Level |
Class A |
2017 |
15.00 |
6.000 |
228
|
Kanda Saniudiyar Rawatsera motor road
|
28.985 |
0.00 %
|
16-05-2024
|
Local Gadhera |
Kanda |
MDR
|
|
1750
|
|
PD Bageshwar |
|
30m Span steel girder motor bridge |
Truss |
Motor Bridge High Level |
Class B |
1997 |
30.00 |
4.750 |
133
|
Bageshwar Dafout motor road
|
10.900 |
0.20 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
MDR
|
|
1753
|
|
PD Bageshwar |
|
70m Span Steel Girder from Bagnath Temple to Numishkhet |
Truss |
Pedestrain Bridge |
Footpath Live Load |
2022 |
70.00 |
3.750 |
--
|
None
|
0.200 |
0.00 %
|
15-06-2024
|
Saryu River |
Bageshwar |
--
|
|
1754
|
|
PD Bageshwar |
|
36m Span Suspension Bridge Near Sakteshwar Temple |
Suspension |
Pedestrain Bridge |
Footpath Live Load |
1986 |
36.00 |
1.800 |
5413
|
Sakteshwar bridge approach road
|
0.100 |
0.80 %
|
17-05-2024
|
Saryu River |
Bageshwar |
LVR
|
|
1755
|
|
PD Bageshwar |
|
70m Span Suspension bridge at Satapyara village |
Suspension |
Pedestrain Bridge |
Footpath Live Load |
2008 |
70.00 |
1.800 |
--
|
None
|
4.000 |
1.54 %
|
29-06-2024
|
Saryu River |
Bageshwar |
--
|
|
1756
|
|
PD Bageshwar |
|
30m Span steel girder bridle bridge |
Truss |
Pedestrain Bridge |
Footpath Live Load |
2012 |
30.00 |
1.800 |
--
|
None
|
0.300 |
2.25 %
|
16-05-2024
|
Jaigan river |
Kafligair |
--
|
|
1757
|
|
PD Bageshwar |
|
30m Span steel girder bridle bridge |
Truss |
Pedestrain Bridge |
Footpath Live Load |
2000 |
30.00 |
2.000 |
--
|
None
|
0.400 |
4.31 %
|
16-05-2024
|
Jaigan river |
Kafligair |
--
|
|
1758
|
|
PD Bageshwar |
|
12.50m Span RCC motor bridge |
Solid slab |
Motor Bridge High Level |
Class B |
|
12.50 |
4.270 |
233
|
Pauri Bend Devaldhar Paldichinaa Jhiroli Kafligair motor road
|
15.800 |
0.00 %
|
08-06-2024
|
Local Gadhera |
Kafligair |
MDR
|
|
1825
|
|
PD Bageshwar |
|
48 Papey Motor Bridge |
Plate Girder |
Motor Bridge High Level |
Class B |
2018 |
48.00 |
4.200 |
3262
|
Kamedi Pape motor road
|
0.250 |
0.00 %
|
18-05-2024
|
Gomati river |
Bageshwar |
VR
|
|
1826
|
|
PD Bageshwar |
|
72m Span motor Bridge near District Hospital |
T-beam and slab |
Motor Bridge High Level |
Class A |
2016 |
72.00 |
6.100 |
238
|
District Hospital approach motor road
|
0.750 |
0.00 %
|
30-06-2024
|
Saryu River |
Bageshwar |
ODR
|
|
1830
|
|
PD Bageshwar |
|
60m Span motor bridge |
Truss |
Motor Bridge High Level |
Class A |
2015 |
60.00 |
6.100 |
625
|
Ring Road (Bhagirathi-Mandalsera-Aarey, Dyagan and Bilona divisions).
|
2.900 |
1.60 %
|
22-05-2024
|
Saryu River |
Bageshwar |
VR
|
|
1831
|
|
PD Bageshwar |
|
60m Span Bridle bridge Dunasagar |
T-beam and slab |
Foot Over Bridge |
Class A |
1994 |
60.00 |
1.800 |
5417
|
Dunasagar bridle bridge approach road over river Saryu
|
0.600 |
10.00 %
|
20-05-2024
|
Saryu River |
Bageshwar |
LVR
|
|
1832
|
|
PD Bageshwar |
|
68.58m span motor bridge Agnikund |
Truss |
Motor Bridge High Level |
Class B |
2009 |
68.58 |
4.870 |
241
|
District Magistrate Office approach motor road
|
0.000 |
0.00 %
|
30-06-2024
|
Saryu River |
Bageshwar |
ODR
|
|
1833
|
|
PD Bageshwar |
|
71m Span bridle bridge |
T-beam and slab |
Foot Over Bridge |
Footpath Live Load |
1988 |
71.00 |
1.800 |
5415
|
Bilona brdle bridge approach road over river Saryu
|
0.160 |
0.78 %
|
30-06-2024
|
Saryu River |
Bageshwar |
LVR
|
|
1834
|
|
PD Bageshwar |
|
84m Span motor bridge Bilona |
Truss |
Motor Bridge High Level |
Class A |
2017 |
84.00 |
6.100 |
625
|
Ring Road (Bhagirathi-Mandalsera-Aarey, Dyagan and Bilona divisions).
|
6.625 |
0.00 %
|
30-06-2024
|
Saryu River |
Bageshwar |
VR
|
|
1835
|
|
PD Bageshwar |
|
36m Span motor bridge Dyangar |
Truss |
Motor Bridge High Level |
Class A |
2015 |
36.00 |
6.100 |
625
|
Ring Road (Bhagirathi-Mandalsera-Aarey, Dyagan and Bilona divisions).
|
4.050 |
3.87 %
|
20-05-2024
|
Gomati river |
Bageshwar |
VR
|
|
1869
|
|
PD Bageshwar |
|
36m Span bridle bridge |
Truss |
Foot Over Bridge |
Footpath Live Load |
1995 |
36.00 |
1.800 |
5407
|
Rawatsera bridle bridge approach road over river Kulur
|
1.600 |
0.00 %
|
16-05-2024
|
Kulur river |
Kanda |
LVR
|
|
1870
|
|
PD Bageshwar |
|
36m Span bridle bridge |
Truss |
Foot Over Bridge |
Footpath Live Load |
2006 |
36.00 |
1.800 |
--
|
None
|
0.000 |
0.59 %
|
16-05-2024
|
Kulur river |
Kanda |
--
|
|
1871
|
|
PD Bageshwar |
|
16m Span RCC Motor Bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
2003 |
16.00 |
4.870 |
133
|
Bageshwar Dafout motor road
|
7.650 |
0.45 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
MDR
|
|
1876
|
|
PD Bageshwar |
|
36.00 m span steel bridge |
Truss |
Motor Bridge High Level |
Class A |
1954 |
36.00 |
4.750 |
55
|
Karnaprayag (Shimli) Gwaldam Bageshwar Chokodi Thal Munsyari Joljivi state highway
|
67.000 |
0.12 %
|
13-05-2024
|
Garur Ganga |
Garur |
SH
|
|
1877
|
|
PD Bageshwar |
|
Baijnath bridge |
Truss |
Motor Bridge High Level |
Class A |
1954 |
41.50 |
4.750 |
55
|
Karnaprayag (Shimli) Gwaldam Bageshwar Chokodi Thal Munsyari Joljivi state highway
|
67.950 |
0.12 %
|
13-05-2024
|
Gomati River |
Baijnath |
SH
|
|
1878
|
|
PD Bageshwar |
|
Pandeykhark Kaderiya bridge |
Truss |
Motor Bridge High Level |
Class A |
2016 |
36.00 |
4.750 |
663
|
Pandeykharak-Kaderiya-Jijoli motor road
|
4.250 |
0.00 %
|
13-05-2024
|
Garur Ganga |
Devnai |
VR
|
|
1879
|
|
PD Bageshwar |
|
Kajuli-kotfilwari Bridge |
Truss |
Motor Bridge High Level |
Class A |
2019 |
48.00 |
4.750 |
664
|
Kajuli-Kotphulwari motor road
|
3.000 |
0.23 %
|
13-05-2024
|
Gomati River |
Kajuli |
VR
|
|
1880
|
|
PD Bageshwar |
|
Bhitarkot road Bridge |
Truss |
Motor Bridge High Level |
Class A |
2019 |
30.00 |
4.750 |
--
|
None
|
0.525 |
0.12 %
|
13-05-2024
|
Garur Ganga |
Devnai |
--
|
|
1895
|
|
PD Bageshwar |
|
15 m span R.C.C bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
|
15.00 |
6.000 |
7236
|
Kafligair Kholsir Naugauv motor road : 6045
|
0.700 |
0.08 %
|
16-05-2024
|
local gadhera |
kafligair |
VR
|
|
1896
|
|
PD Bageshwar |
|
16 m span R.C.C bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
|
16.00 |
6.000 |
7236
|
Kafligair Kholsir Naugauv motor road : 6045
|
2.100 |
0.97 %
|
16-05-2024
|
local gadhera |
kafligair |
VR
|
|
1898
|
|
PD Bageshwar |
|
24.00 m span RCC |
Truss |
Motor Bridge High Level |
Class B |
|
24.00 |
6.000 |
7236
|
Kafligair Kholsir Naugauv motor road : 6045
|
14.800 |
1.40 %
|
16-05-2024
|
local gadhera |
kafligair, sheraghat |
VR
|
|
1903
|
|
PD Bageshwar |
|
10m span motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
|
11.60 |
5.000 |
7236
|
Kafligair Kholsir Naugauv motor road : 6045
|
2.000 |
0.79 %
|
16-05-2024
|
Local Gadhera |
Kafligair |
VR
|
|
1904
|
|
PD Bageshwar |
|
10m span motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
|
10.00 |
5.470 |
133
|
Bageshwar Dafout motor road
|
5.700 |
0.57 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
MDR
|
|
1905
|
|
PD Bageshwar |
|
10m span motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
1997 |
10.00 |
5.470 |
133
|
Bageshwar Dafout motor road
|
7.850 |
0.57 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
MDR
|
|
1906
|
|
PD Bageshwar |
|
12m span motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
2002 |
12.00 |
5.250 |
133
|
Bageshwar Dafout motor road
|
10.300 |
0.41 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
MDR
|
|
1907
|
|
PD Bageshwar |
|
10m span motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
2012 |
10.00 |
6.600 |
133
|
Bageshwar Dafout motor road
|
25.800 |
0.41 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
MDR
|
|
1908
|
|
PD Bageshwar |
|
6m Span RCC bridge at Titoli |
T-beam and slab |
Motor Bridge High Level |
Class A |
|
6.00 |
6.000 |
228
|
Kanda Saniudiyar Rawatsera motor road
|
7.000 |
0.00 %
|
16-05-2024
|
Titoli Gar |
Kanda |
MDR
|
|
1949
|
|
PD Bageshwar |
|
30 m span motor bridge |
Plate Girder |
Motor Bridge High Level |
Class B |
|
30.00 |
4.770 |
232
|
Dangoli Syali Chhatiya Harinagari Kulau Gwaldam motor road
|
1.350 |
1.87 %
|
05-06-2024
|
ghangli river |
garud |
MDR
|
|
1950
|
|
PD Bageshwar |
|
100m span Jakhera Suspension Bridle Bridge |
Suspension |
Pedestrain Bridge |
Footpath Live Load |
2001 |
100.00 |
1.800 |
--
|
None
|
0.350 |
1.53 %
|
16-05-2024
|
Lahur River |
garud |
--
|
|
1951
|
|
PD Bageshwar |
|
36 m span Rolyana Bridge |
T-beam and slab |
Pedestrain Bridge |
Class A |
2001 |
36.00 |
1.800 |
--
|
None
|
0.500 |
2.00 %
|
16-06-2024
|
Local |
garud |
--
|
|
1952
|
|
PD Bageshwar |
|
36 m Steel Girder Bridle Bridge near Darimkhet |
Plate Girder |
Pedestrain Bridge |
Footpath Live Load |
2003 |
36.00 |
1.800 |
--
|
None
|
0.450 |
1.51 %
|
16-06-2024
|
lahur River |
garud |
--
|
|
1953
|
|
PD Bageshwar |
|
36 m steel girder bridle bridge at Agarkot Majkot |
Plate Girder |
Foot Over Bridge |
Footpath Live Load |
2008 |
36.00 |
1.800 |
--
|
None
|
0.300 |
1.76 %
|
16-06-2024
|
local |
garud |
--
|
|
1954
|
|
PD Bageshwar |
|
36 m steel girder Bridge at Magristate |
Plate Girder |
Pedestrain Bridge |
Footpath Live Load |
2012 |
36.00 |
1.800 |
--
|
None
|
0.450 |
1.80 %
|
16-06-2024
|
Gomti |
garud |
--
|
|
1961
|
|
PD Bageshwar |
|
24 m span Steel Girder Bridge |
Plate Girder |
Motor Bridge High Level |
Class A |
2007 |
24.00 |
4.270 |
232
|
Dangoli Syali Chhatiya Harinagari Kulau Gwaldam motor road
|
14.150 |
1.06 %
|
11-06-2024
|
local |
garud |
MDR
|
|
1962
|
|
PD Bageshwar |
|
12m span Steel Girder Bridge |
Plate Girder |
Motor Bridge High Level |
Class A |
|
12.00 |
4.270 |
232
|
Dangoli Syali Chhatiya Harinagari Kulau Gwaldam motor road
|
10.750 |
1.29 %
|
11-06-2024
|
Local |
garud |
MDR
|
|
1963
|
|
PD Bageshwar |
|
12 m span Bailey Bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
2005 |
12.00 |
4.270 |
232
|
Dangoli Syali Chhatiya Harinagari Kulau Gwaldam motor road
|
12.225 |
0.26 %
|
11-06-2024
|
Local |
garud |
MDR
|
|
1964
|
|
PD Bageshwar |
|
13m RCC Bridge |
Solid slab |
Motor Bridge High Level |
Class A |
|
13.00 |
4.270 |
657
|
Chafula-Mate-Tilsari motor road
|
5.500 |
0.06 %
|
18-05-2024
|
local |
garud |
VR
|
|
1965
|
|
PD Bageshwar |
|
18 m span Bailey Bridge |
Plate Girder |
Motor Bridge High Level |
Class A |
|
15.00 |
4.270 |
671
|
Kandhar Reethatalla Patharkhani motor road
|
5.100 |
3.87 %
|
11-06-2024
|
local |
garud |
VR
|
|
1966
|
|
PD Bageshwar |
|
24 m span Steel Girder Bridge |
Plate Girder |
Motor Bridge High Level |
Class A |
2014 |
24.00 |
4.270 |
670
|
Kandahar-Roulyana-Majkot Motor Road
|
12.400 |
0.77 %
|
07-06-2024
|
local |
garud |
VR
|
|
1967
|
|
PD Bageshwar |
|
18 m Span Steel Girder |
Plate Girder |
Motor Bridge High Level |
Class A |
2014 |
18.00 |
4.270 |
670
|
Kandahar-Roulyana-Majkot Motor Road
|
13.850 |
0.98 %
|
07-06-2024
|
local |
garud |
VR
|
|
1968
|
|
PD Bageshwar |
|
33m Span Steel Girder Bridge |
Plate Girder |
Motor Bridge High Level |
Class A |
2015 |
33.00 |
4.270 |
670
|
Kandahar-Roulyana-Majkot Motor Road
|
14.325 |
0.38 %
|
07-06-2024
|
local |
garud |
VR
|
|
1969
|
|
PD Bageshwar |
|
30m Steel Girder Bridge |
Plate Girder |
Motor Bridge High Level |
Class A |
1985 |
30.00 |
1.800 |
--
|
None
|
0.100 |
3.47 %
|
16-06-2024
|
local |
garud |
--
|
|
1970
|
|
PD Bageshwar |
|
30m Span Steel girder Bridge |
Plate Girder |
Pedestrain Bridge |
Class A |
1995 |
30.00 |
1.800 |
--
|
None
|
0.100 |
0.00 %
|
25-07-2024
|
Local |
garud |
--
|
|
1971
|
|
PD Bageshwar |
|
30m Span Steel girder Bridge |
Plate Girder |
Motor Bridge High Level |
Class A |
1997 |
30.00 |
2.000 |
--
|
None
|
0.015 |
2.14 %
|
16-06-2024
|
Lahur River |
garud |
--
|
|
1972
|
|
PD Bageshwar |
|
30 m Span Steel girder Bridge |
T-beam and slab |
Pedestrain Bridge |
Class A |
2021 |
30.00 |
1.800 |
--
|
None
|
0.225 |
0.49 %
|
16-06-2024
|
lahur |
garud |
--
|
|
1973
|
|
PD Bageshwar |
|
18 m Span Steel Girder Bridge |
Plate Girder |
Pedestrain Bridge |
Class A |
2020 |
18.00 |
1.800 |
--
|
None
|
0.010 |
0.00 %
|
20-07-2024
|
local |
garud |
--
|
|
1983
|
|
PD Bageshwar |
|
65 m span suspension bridge at thaklar |
Suspension |
Pedestrain Bridge |
Class A |
2019 |
65.00 |
1.800 |
7229
|
Road from km 185 of Tanakpur Tavaghat motor road to Gogina
|
1.000 |
1.68 %
|
27-06-2024
|
Gomti |
garud |
VR
|
|
1984
|
|
PD Bageshwar |
|
72m span suspension bridge at village bund |
Suspension |
Pedestrain Bridge |
Class A |
2012 |
72.00 |
1.800 |
7229
|
Road from km 185 of Tanakpur Tavaghat motor road to Gogina
|
1.000 |
2.09 %
|
27-06-2024
|
Gomti |
garud |
VR
|
|
1985
|
|
PD Bageshwar |
|
70 m Suspension Bridge near Bamrari |
Suspension |
Pedestrain Bridge |
Class A |
|
70.00 |
1.800 |
7229
|
Road from km 185 of Tanakpur Tavaghat motor road to Gogina
|
1.000 |
0.00 %
|
27-06-2024
|
Gomti |
garud |
VR
|
|
1986
|
|
PD Bageshwar |
|
45 m span Kholi Bahuli Steel Girder Bridge |
Plate Girder |
Pedestrain Bridge |
Class A |
|
45.00 |
1.800 |
--
|
None
|
1.000 |
0.00 %
|
18-05-2024
|
Gomti |
garud |
--
|
|
1987
|
|
PD Bageshwar |
|
10m span motor bridge at Tunera baset |
Solid slab |
Motor Bridge High Level |
Class A |
2019 |
10.00 |
6.000 |
652
|
Mohan nagar-Tunera-Baset motor road
|
2.000 |
0.00 %
|
08-06-2024
|
Local |
bageshwar |
VR
|
|
2139
|
|
PD Bageshwar |
|
70m Span Suspension bridge at Rawatsera |
Suspension |
Foot Over Bridge |
Footpath Live Load |
2010 |
70.00 |
1.800 |
--
|
None
|
0.000 |
1.31 %
|
16-05-2024
|
Kulur river |
Kanda |
--
|
|
2140
|
|
PD Bageshwar |
|
36m Span bridle bridge Bhaisuri |
Plate Girder |
Foot Over Bridge |
Footpath Live Load |
2015 |
36.00 |
1.800 |
--
|
None
|
0.000 |
2.27 %
|
16-05-2024
|
Local Gadhera |
Kanda |
--
|
|
2218
|
|
PD Bageshwar |
|
6m Span RCC bridge |
Solid slab |
Motor Bridge High Level |
Class A |
2020 |
6.00 |
6.000 |
634
|
Kanda Padaw-Pangchora motor road
|
1.000 |
0.00 %
|
16-05-2024
|
Local Gadhera |
Kanda |
VR
|
|
2229
|
|
PD Bageshwar |
|
15m Span RCC bridge (Mandalsera Section) |
Solid slab |
Motor Bridge High Level |
NA |
2012 |
15.00 |
6.000 |
625
|
Ring Road (Bhagirathi-Mandalsera-Aarey, Dyagan and Bilona divisions).
|
0.000 |
0.92 %
|
04-06-2024
|
Bhagarathi Nala |
Bageshwar |
VR
|
|
2234
|
|
PD Bageshwar |
|
15m Span RCC bridge (Mandalsera Section) |
Solid slab |
Motor Bridge High Level |
NA |
2014 |
15.00 |
6.000 |
625
|
Ring Road (Bhagirathi-Mandalsera-Aarey, Dyagan and Bilona divisions).
|
2.000 |
1.25 %
|
04-06-2024
|
Local Gadhera |
Bageshwar |
VR
|
|
2236
|
|
PD Bageshwar |
|
12m Span RCC bridge (Mandalsera Section) |
Solid slab |
Motor Bridge High Level |
NA |
2014 |
12.00 |
6.000 |
625
|
Ring Road (Bhagirathi-Mandalsera-Aarey, Dyagan and Bilona divisions).
|
2.600 |
0.33 %
|
04-06-2024
|
Local Gadhera |
Bageshwar |
VR
|
|
2333
|
|
PD Bageshwar |
|
12m Span RCC bridge (Dyangar Section) |
T-beam and slab |
Motor Bridge High Level |
Class A |
2014 |
12.00 |
6.000 |
625
|
Ring Road (Bhagirathi-Mandalsera-Aarey, Dyagan and Bilona divisions).
|
3.000 |
0.56 %
|
05-06-2024
|
Local Gadhera |
Bageshwar |
VR
|
|
2335
|
|
PD Bageshwar |
|
6.70m Span RCC bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
1997 |
6.70 |
6.000 |
24
|
Bageshwar Girechhina Someshwar Dwarahat Bimandeshwar Ida Ranikhet state highway
|
6.000 |
0.00 %
|
16-05-2024
|
Local Gadhera |
Bageshwar |
SH
|
|
2377
|
|
PD Bageshwar |
|
60m Span Steel girder bridge (Runikhet-Gandigram motor road) |
T-beam and slab |
Motor Bridge High Level |
Class A |
2017 |
60.00 |
6.000 |
--
|
None
|
0.200 |
17.86 %
|
16-05-2024
|
Gomati river |
Bageshwar |
--
|
|
2379
|
|
PD Bageshwar |
|
24m Span Steel girder bridle bridge near Patan village |
T-beam and slab |
Foot Over Bridge |
Class A |
2005 |
24.00 |
1.800 |
--
|
None
|
0.000 |
19.11 %
|
20-05-2024
|
Kausaliya Gadhera |
Bageshwar |
--
|
|
2419
|
|
PD Bageshwar |
|
24.50m Span motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
2019 |
24.50 |
6.000 |
654
|
Thunai-Mihiniya motor road
|
0.400 |
14.34 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
VR
|
|
2420
|
|
PD Bageshwar |
|
18m Span Steel Girder motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
2019 |
18.00 |
6.000 |
654
|
Thunai-Mihiniya motor road
|
3.000 |
17.66 %
|
16-05-2024
|
Local Gadhera |
Bageshwar |
VR
|
|
2421
|
|
PD Bageshwar |
|
10m span motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
2015 |
10.00 |
6.000 |
655
|
Amsarkot Sat Ratwey motor road
|
0.000 |
2.47 %
|
16-05-2024
|
Local Gadhera |
Bageshwar |
ODR
|
|
2437
|
|
PD Bageshwar |
|
6m span rcc motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
|
6.00 |
6.000 |
55
|
Karnaprayag (Shimli) Gwaldam Bageshwar Chokodi Thal Munsyari Joljivi state highway
|
55.000 |
0.12 %
|
13-05-2024
|
Local Gadhera |
Kausani |
SH
|
|
2440
|
|
PD Bageshwar |
|
10m span motor bridge |
Solid slab |
Motor Bridge High Level |
Class B |
2002 |
10.00 |
6.000 |
666
|
Garur Kapkoti Falyati motor road
|
3.000 |
0.06 %
|
13-05-2024
|
Local Gadhera |
Akudai |
ODR
|
|
2442
|
|
PD Bageshwar |
|
36m Span Steel Girder Bridge |
Truss |
Motor Bridge High Level |
Class B |
2018 |
36.00 |
6.000 |
7245
|
Kausani to Bhatdiya motor road : 6053
|
13.000 |
0.12 %
|
13-05-2024
|
Bhatariya Lala |
Kausani |
VR
|
|
2445
|
|
PD Bageshwar |
|
6m Span motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
2016 |
6.00 |
6.000 |
663
|
Pandeykharak-Kaderiya-Jijoli motor road
|
5.000 |
0.12 %
|
13-05-2024
|
Local Gadhera |
Jijoli |
VR
|
|
2447
|
|
PD Bageshwar |
|
6m Span motor bridge |
Solid slab |
Motor Bridge High Level |
Class B |
|
6.00 |
6.000 |
639
|
Garur Devnai Pokhari motor road
|
3.000 |
0.12 %
|
13-05-2024
|
Local Gadhera |
Devnai |
ODR
|
|
2448
|
|
PD Bageshwar |
|
6m Span motor bridge |
Solid slab |
Motor Bridge High Level |
Class B |
|
6.00 |
6.000 |
639
|
Garur Devnai Pokhari motor road
|
5.000 |
0.12 %
|
13-05-2024
|
Local Gadhera |
Devnai |
ODR
|
|
2450
|
|
PD Bageshwar |
|
36m Span bridle bridge |
Truss |
Foot Over Bridge |
Footpath Live Load |
1987 |
36.00 |
1.800 |
--
|
None
|
0.000 |
0.42 %
|
13-05-2024
|
Garur Ganga |
Devnai |
--
|
|
2451
|
|
PD Bageshwar |
|
36m Span bridle bridge |
Truss |
Foot Over Bridge |
Footpath Live Load |
1987 |
36.00 |
1.800 |
--
|
None
|
0.000 |
0.06 %
|
13-05-2024
|
Garur Ganga |
Garur |
--
|
|
2452
|
|
PD Bageshwar |
|
36m Span bridle bridge |
Truss |
Foot Over Bridge |
Footpath Live Load |
2012 |
36.00 |
1.800 |
--
|
None
|
0.000 |
0.12 %
|
13-05-2024
|
Garur Ganga |
Devnai |
--
|
|
2453
|
|
PD Bageshwar |
|
10m span motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
2003 |
10.00 |
6.000 |
639
|
Garur Devnai Pokhari motor road
|
7.000 |
0.12 %
|
13-05-2024
|
Local Gadhera |
Devnai |
ODR
|
|
2454
|
|
PD Bageshwar |
|
6m Span motor bridge |
Solid slab |
Motor Bridge High Level |
Class B |
2003 |
6.00 |
6.000 |
639
|
Garur Devnai Pokhari motor road
|
3.000 |
0.36 %
|
11-06-2024
|
Local Gadhera |
Devnai |
ODR
|
|
2643
|
|
PD Bageshwar |
|
24m Span Steel girder bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
2003 |
24.00 |
6.000 |
228
|
Kanda Saniudiyar Rawatsera motor road
|
9.000 |
1.48 %
|
16-05-2024
|
Bhadrawati river |
Kanda |
MDR
|
|
2644
|
|
PD Bageshwar |
|
30m Span steel girder bridge near Dhapolasera |
T-beam and slab |
Foot Over Bridge |
Class A |
2008 |
30.00 |
1.800 |
--
|
None
|
0.000 |
1.81 %
|
16-05-2024
|
Bhadrawati river |
Kanda |
--
|
|
2645
|
|
PD Bageshwar |
|
18m span steel girder motor bridge Near Village Bhandarisera |
T-beam and slab |
Motor Bridge High Level |
Class A |
|
18.00 |
6.000 |
--
|
None
|
0.975 |
1.43 %
|
16-05-2024
|
Bhadrawati river |
Kanda |
--
|
|
2646
|
|
PD Bageshwar |
|
18m Span Steel Girder motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
|
18.00 |
6.000 |
629
|
Dhapolasera Simkuna motor road
|
3.000 |
1.89 %
|
16-05-2024
|
Local Gadhera |
Kanda |
VR
|
|
2647
|
|
PD Bageshwar |
|
36m span bridle bridge at Simkuna Village |
T-beam and slab |
Foot Over Bridge |
Class A |
|
36.00 |
1.800 |
--
|
None
|
0.000 |
2.27 %
|
16-05-2024
|
Bhadrawati river |
Kanda |
--
|
|
2648
|
|
PD Bageshwar |
|
18m Span Steel Girder motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
|
18.00 |
6.000 |
636
|
Satchara-Jalthakot-Chamadthal-Kimoli motor road.
|
3.000 |
4.92 %
|
16-05-2024
|
Local Gadhera |
Kanda |
VR
|
|
2659
|
|
PD Bageshwar |
|
30 m span motor bridge at km 16 of dangoli sailani motor road |
Plate Girder |
Motor Bridge High Level |
Class A |
1982 |
30.00 |
4.250 |
33
|
Dangoli Sailani Darimkhet Hadbar Pandrahpali Balighat Dofad Dhramghar Kotmanya Pankhu Thal Satsiling state highway
|
15.900 |
2.17 %
|
16-05-2024
|
Lahur River |
garud |
SH
|
|
2660
|
|
PD Bageshwar |
|
6 m span Motor Brisge at Dangoli syali chatiya |
Solid slab |
Motor Bridge High Level |
Class A |
|
6.00 |
4.250 |
232
|
Dangoli Syali Chhatiya Harinagari Kulau Gwaldam motor road
|
3.550 |
2.59 %
|
11-06-2024
|
local |
garud |
MDR
|
|
2661
|
|
PD Bageshwar |
|
30 m Span Motor Bridge at KM-4 of Jakheda Dakghat Lamchu;a |
Plate Girder |
Motor Bridge High Level |
Class A |
2015 |
30.00 |
4.250 |
7239
|
Jakheda Dakghat se Lamchula motor road : 6046
|
3.175 |
0.42 %
|
16-05-2024
|
Local |
garud |
VR
|
|
2664
|
|
PD Bageshwar |
|
10 m span Motor Bridge at Km-7 of Jakheda Dakhghat Lamchula |
Solid slab |
Motor Bridge High Level |
Class A |
2015 |
10.00 |
4.250 |
7239
|
Jakheda Dakghat se Lamchula motor road : 6046
|
6.150 |
0.65 %
|
16-05-2024
|
local |
garud |
VR
|
|
2666
|
|
PD Bageshwar |
|
30 m span Motor Bridge at Km7 of jakheda dakghat lamchula |
Plate Girder |
Motor Bridge High Level |
Class A |
2015 |
30.00 |
4.250 |
7239
|
Jakheda Dakghat se Lamchula motor road : 6046
|
6.350 |
0.81 %
|
16-05-2024
|
local |
garud |
VR
|
|
2682
|
|
PD Bageshwar |
|
48m span Motor Bridge at Simar Kansyari MR |
Truss |
Motor Bridge High Level |
Class A |
|
48.00 |
4.250 |
7232
|
Simar Kansyari motor road : 6041
|
1.350 |
1.42 %
|
18-05-2024
|
local |
garud |
VR
|
|
2699
|
|
PD Bageshwar |
|
63 m span suspension bridge near house of Dungar Singh Parihar |
Suspension |
Pedestrain Bridge |
Class A |
|
63.00 |
1.800 |
7229
|
Road from km 185 of Tanakpur Tavaghat motor road to Gogina
|
11.800 |
1.31 %
|
27-06-2024
|
local |
garud |
VR
|
|
2713
|
|
PD Bageshwar |
|
6m Span RCC bridge at Sunargawn |
T-beam and slab |
Motor Bridge High Level |
Class A |
2018 |
6.00 |
6.000 |
621
|
Kanda Dhapolasera motor road to Silangkhet Sunargawn motor road
|
1.000 |
0.00 %
|
16-05-2024
|
Pepalgar Gadhera |
Kanda |
VR
|
|
2714
|
|
PD Bageshwar |
|
12m Span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
2002 |
12.00 |
6.000 |
33
|
Dangoli Sailani Darimkhet Hadbar Pandrahpali Balighat Dofad Dhramghar Kotmanya Pankhu Thal Satsiling state highway
|
37.000 |
0.12 %
|
18-05-2024
|
Local Gadhera |
Bageshwar |
SH
|
|
2715
|
|
PD Bageshwar |
|
30m Span steel girder motor bridge at Pandrahpali |
T-beam and slab |
Motor Bridge High Level |
Class A |
2016 |
30.00 |
6.000 |
33
|
Dangoli Sailani Darimkhet Hadbar Pandrahpali Balighat Dofad Dhramghar Kotmanya Pankhu Thal Satsiling state highway
|
32.000 |
0.00 %
|
16-06-2024
|
Pandrahpali Nala |
Bageshwar |
SH
|
|
2716
|
|
PD Bageshwar |
|
30m Span steel girder motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
2016 |
30.00 |
6.000 |
33
|
Dangoli Sailani Darimkhet Hadbar Pandrahpali Balighat Dofad Dhramghar Kotmanya Pankhu Thal Satsiling state highway
|
28.000 |
0.00 %
|
16-06-2024
|
Nargol Nala |
Bageshwar |
SH
|
|
2720
|
|
PD Bageshwar |
|
24m Span Steel girder bridle bridge near Mithunkot village |
T-beam and slab |
Pedestrain Bridge |
Class A |
|
24.00 |
1.800 |
--
|
None
|
0.400 |
0.30 %
|
16-05-2024
|
Local Gadhera |
Kanda |
--
|
|
2743
|
|
PD Bageshwar |
|
6m Span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
|
6.00 |
5.400 |
24
|
Bageshwar Girechhina Someshwar Dwarahat Bimandeshwar Ida Ranikhet state highway
|
10.000 |
1.43 %
|
16-05-2024
|
Local Gadhera |
Bageshwar |
SH
|
|
2744
|
|
PD Bageshwar |
|
6.5 m span bridge at ratisera |
Solid slab |
Motor Bridge High Level |
Class A |
2008 |
6.50 |
1.800 |
--
|
None
|
13.000 |
0.73 %
|
11-06-2024
|
Local |
garud |
--
|
|
2769
|
|
PD Bageshwar |
|
6m Span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
|
6.00 |
6.000 |
133
|
Bageshwar Dafout motor road
|
8.500 |
0.58 %
|
17-05-2024
|
Local Gadhera |
Bagehwar |
MDR
|
|
2771
|
|
PD Bageshwar |
|
10m Span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
|
10.00 |
6.000 |
133
|
Bageshwar Dafout motor road
|
15.700 |
0.72 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
MDR
|
|
2772
|
|
PD Bageshwar |
|
6m Span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
|
6.00 |
6.000 |
133
|
Bageshwar Dafout motor road
|
22.500 |
0.41 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
MDR
|
|
2773
|
|
PD Bageshwar |
|
6m Span RCC motor bridge |
Solid slab |
Motor Bridge High Level |
Class B |
|
6.00 |
6.000 |
133
|
Bageshwar Dafout motor road
|
23.900 |
0.41 %
|
17-05-2024
|
Local Gadhera |
Bageshwar |
MDR
|
|
3406
|
|
PD Bageshwar |
|
BRIDGE NEAR MALDUNGARI OVER LAHUR RIVER |
T-beam and slab |
Pedestrain Bridge |
Footpath Live Load |
1995 |
18.00 |
2.300 |
24
|
Bageshwar Girechhina Someshwar Dwarahat Bimandeshwar Ida Ranikhet state highway
|
0.300 |
1.37 %
|
05-07-2024
|
LAHUR RIVER |
MALDUNGARI |
SH
|
|
3418
|
|
PD Bageshwar |
|
24m Span Steel Girder motor bridge |
Truss |
Motor Bridge High Level |
Class B |
2001 |
24.00 |
4.800 |
7240
|
Garud Dhaina methro patli Lakhani motor road
|
0.375 |
0.00 %
|
14-05-2024
|
Local Gadhera |
Garur |
VR
|
|
3422
|
|
PD Bageshwar |
|
6m Span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
2007 |
6.00 |
7.100 |
7240
|
Garud Dhaina methro patli Lakhani motor road
|
4.825 |
0.00 %
|
14-05-2024
|
Kamlekh Gadhera |
Garud |
VR
|
|
3423
|
|
PD Bageshwar |
|
9m Span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
2009 |
9.00 |
6.600 |
7240
|
Garud Dhaina methro patli Lakhani motor road
|
14.325 |
0.00 %
|
14-05-2024
|
Badpyar Gadhera |
Garud |
VR
|
|
3424
|
|
PD Bageshwar |
|
6m Span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
2016 |
6.00 |
6.800 |
641
|
Senu-Ladoliya market motor road
|
0.500 |
0.00 %
|
14-05-2024
|
Local Gadhera |
Garud |
VR
|
|
3432
|
|
PD Bageshwar |
|
24m Span Steel Girder Bridle Bridge |
T-beam and slab |
Foot Over Bridge |
Footpath Live Load |
2022 |
24.00 |
1.800 |
--
|
None
|
0.000 |
0.00 %
|
16-05-2024
|
Jaigan Gadhera |
Kafligair |
--
|
|
3433
|
|
PD Bageshwar |
|
14m Span RCC Motor Bridge |
Solid slab |
Motor Bridge High Level |
Class B |
2015 |
14.00 |
6.000 |
7236
|
Kafligair Kholsir Naugauv motor road : 6045
|
6.000 |
0.16 %
|
16-05-2024
|
Local Gadhera |
Kafligair |
VR
|
|
3434
|
|
PD Bageshwar |
|
36m Span Steel Girder Bridge |
T-beam and slab |
Foot Over Bridge |
Footpath Live Load |
1991 |
36.00 |
1.800 |
24
|
Bageshwar Girechhina Someshwar Dwarahat Bimandeshwar Ida Ranikhet state highway
|
0.000 |
0.00 %
|
18-05-2024
|
Gomati River |
Bageshwar |
SH
|
|
3463
|
|
PD Bageshwar |
|
7.20m span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class B |
|
7.20 |
6.000 |
3751
|
Bageshwer Kapkot Shama Tejam state highway
|
2.000 |
0.82 %
|
04-06-2024
|
Local Gadhera |
Bageshwar |
SH
|
|
3464
|
|
PD Bageshwar |
|
7m Span RCC motor Bridge (Ring Road Majiyakhet-Bilona Section) |
T-beam and slab |
Motor Bridge High Level |
Class B |
2018 |
7.00 |
6.000 |
625
|
Ring Road (Bhagirathi-Mandalsera-Aarey, Dyagan and Bilona divisions).
|
1.300 |
0.33 %
|
04-06-2024
|
Local Gadhera |
Bageshwar |
VR
|
|
3465
|
|
PD Bageshwar |
|
10m Span RCC motor bridge |
T-beam and slab |
Motor Bridge High Level |
Class A |
2023 |
10.00 |
6.000 |
676
|
Mandalsera-Ghiroli approach motor road
|
1.000 |
0.82 %
|
07-06-2024
|
Local Gadhera |
Bageshwar |
VR
|
|