Loading...
Loading Data...
| ID | Final | Division | District | Bridge Name | Struct Type | Bridge Type | Loding | Const. Year | Length(m) | Width(m) | Road ID | Road Name | Road Chainage | Rating | Rating Date | Intersected | Nearest town | Road Type | Work Code(s) | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 196 |
|
CD Pabo | Tehri | saiji burasi kuliyani Motor road Bridge | Truss | Motor Bridge High Level | Class A | 2018 | 30.00 | 4.250 | 3481 | Saiji Burasi Kuliyani motor road | 1.000 |
0.00 % |
20-05-2026 | Saiji or Burasi | Nautha | VR | -- | |
| 216 |
|
CD Pabo | Pauri | paithani BADETH bridge | Truss | Motor Bridge High Level | Class A | 2008 | 32.00 | 6.000 | 3434 | Paithani Badeth Nodi motor road | 0.490 |
0.00 % |
17-05-2026 | west nayar | paithani | MDR | -- | |
| 217 |
|
CD Pabo | Pauri | paithani BADETH bridge | Solid slab | Motor Bridge High Level | Class A | 1990 | 30.00 | 6.000 | 3434 | Paithani Badeth Nodi motor road | 4.750 |
0.00 % |
26-05-2026 | Local nala | paithani | MDR | -- | |
| 218 |
|
CD Pabo | Pauri | musaagli bridge | Truss | Motor Bridge High Level | Class A | 2020 | 36.00 | 6.000 | 161 | Damdewal Kalgari Khirshu Pokhara Kherakhal Kandai Khakra motor road | 40.218 |
0.00 % |
20-05-2026 | west nayar | pabau | MDR | -- | |
| 224 |
|
CD Pabo | Pauri | Patoti matholi Motor Bridge | Truss | Motor Bridge High Level | Class A | 2017 | 24.00 | 4.250 | 3437 | Patoti Matholi motor road | 1.125 |
0.00 % |
20-05-2026 | local gadera | Pabou | VR | -- | |
| 225 |
|
CD Pabo | Pauri | Patoti Matholi Motor road | T-beam and slab | Motor Bridge High Level | Class A | 2017 | 15.00 | 4.250 | 3437 | Patoti Matholi motor road | 2.525 |
0.00 % |
20-05-2026 | Local Gadera | Pabau | VR | -- | |
| 226 |
|
CD Pabo | Pauri | Tripalisain Gadoli Dungri Motor Bridge | Solid slab | Motor Bridge High Level | Class A | 2016 | 15.00 | 4.250 | -- | None | 2.000 |
0.54 % |
08-07-2026 | Local River | Chakisain | -- | -- | |
| 232 |
|
CD Pabo | Pauri | Karnprayag Noti Paithani Motor Bridge | Truss | Motor Bridge High Level | Class B | 1986 | 48.00 | 4.250 | 54 | Karanprayg Nauti Paithani state highway | 77.950 |
0.00 % |
05-05-2026 | Pachami Nayar | Paithani | SH | 125W492 | |
| 233 |
|
CD Pabo | Pauri | marchula Sarikhet Baijro Pokhara Motor Bridge | Truss | Motor Bridge High Level | Class B | 1972 | 45.00 | 6.000 | 62 | Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway) | 166.013 |
0.11 % |
18-05-2026 | Satpuli nayar | Pokhara | SH | 125W493 | |
| 234 |
|
CD Pabo | Pauri | Nh 121 to Nanda Motor Road in Pachimi nayar 36 meter Span Setu. | Truss | Motor Bridge High Level | Class A | 2018 | 36.00 | 6.000 | 3460 | Pabou to Nada Extention Road extended up to NH 121 to Nanda Extention Road. | 10.218 |
0.00 % |
20-05-2026 | Pachimi Nayar | Paithani | VR | -- | |
| 256 |
|
CD Pabo | Pauri | NANDA BRIDGE | Truss | Motor Bridge High Level | Class A | 2005 | 24.00 | 5.000 | 3460 | Pabou to Nada Extention Road extended up to NH 121 to Nanda Extention Road. | 0.300 |
0.00 % |
20-05-2026 | west nayar | CHIPPLGHAAT | VR | -- | |
| 665 |
|
CD Pabo | Pauri | paithni raadgaadbridge | Truss | Pedestrain Bridge | Footpath Live Load | 2018 | 36.00 | 1.800 | -- | None | 18.000 |
0.00 % |
05-05-2026 | west nayar | paithani | -- | -- | |
| 666 |
|
CD Pabo | Pauri | near saakrsain iter collage bridge | Truss | Pedestrain Bridge | Footpath Live Load | 1991 | 36.00 | 1.800 | -- | None | 18.000 |
0.00 % |
02-07-2026 | west nayar | paithani | -- | -- | |
| 667 |
|
CD Pabo | Pauri | near sarana syoligaad bridge | Truss | Pedestrain Bridge | Footpath Live Load | 2015 | 36.00 | 1.800 | -- | None | 18.000 |
0.00 % |
19-05-2026 | syoligaad naalaa | paithani | -- | -- | |
| 668 |
|
CD Pabo | Pauri | paithani sivaalay temple bridge | Truss | Pedestrain Bridge | Footpath Live Load | 2014 | 36.00 | 1.800 | -- | None | 18.000 |
0.00 % |
05-05-2026 | west nayar | paithani | -- | -- | |
| 669 |
|
CD Pabo | Pauri | near villege chaakisain bridge | Truss | Pedestrain Bridge | Footpath Live Load | 2017 | 36.00 | 1.800 | -- | None | 18.000 |
0.00 % |
26-05-2026 | Local nala | chaakisain | -- | -- | |
| 670 |
|
CD Pabo | Pauri | near mankot paidal bridge for khaatsyun | Truss | Pedestrain Bridge | Footpath Live Load | 1985 | 36.00 | 1.800 | -- | None | 18.000 |
5.58 % |
15-07-2026 | west nayar | pabau | -- | -- | |
| 671 |
|
CD Pabo | Pauri | bngaadiyun bridge | Truss | Pedestrain Bridge | Footpath Live Load | 2016 | 24.00 | 1.800 | -- | None | 69.000 |
0.00 % |
19-05-2026 | Syoligaad | paithani | -- | -- | |
| 672 |
|
CD Pabo | Pauri | villege syoli talli mai tripani mndir mai 24m span bridge | Truss | Pedestrain Bridge | Footpath Live Load | 2006 | 24.00 | 1.800 | -- | None | 12.000 |
0.00 % |
19-05-2026 | khand nayar | paithani | -- | -- | |
| 673 |
|
CD Pabo | Pauri | chunkhet gadere mai narsri ke paas 30m span bridge | Truss | Pedestrain Bridge | Footpath Live Load | 2017 | 30.00 | 1.800 | -- | None | 15.000 |
0.00 % |
17-05-2026 | Local nala | paithani | -- | -- | |
| 674 |
|
CD Pabo | Pauri | villege bamorth mai uthiyaar toak mai bridge | Truss | Pedestrain Bridge | Footpath Live Load | 2010 | 24.00 | 24.000 | -- | None | 12.000 |
0.00 % |
19-05-2026 | Local nala | paithani | -- | -- | |
| 735 |
|
CD Pabo | Pauri | pabau santudhaar km 27 arch bridge | Arch | Motor Bridge High Level | Class A | 1972 | 9.14 | 8.300 | 162 | Pabou Santudhar Nagounkhal Damdewal Chubattakhal Chorikhal motor road | 26.283 |
0.00 % |
23-05-2026 | Local nala | pabau | MDR | -- | |
| 762 |
|
CD Pabo | Pauri | pabau santudhaar km 18 arch bridge | Arch | Motor Bridge High Level | Class SV | 1972 | 13.14 | 8.500 | 162 | Pabou Santudhar Nagounkhal Damdewal Chubattakhal Chorikhal motor road | 17.335 |
0.00 % |
23-05-2026 | Local nala | pabau | MDR | -- | |
| 763 |
|
CD Pabo | Pauri | pabau santudhaar km 06 arch bridge | Arch | Motor Bridge High Level | Class A | 1973 | 8.30 | 6.200 | 162 | Pabou Santudhar Nagounkhal Damdewal Chubattakhal Chorikhal motor road | 5.276 |
3.37 % |
11-05-2026 | Local nala | pabau | MDR | -- | |
| 764 |
|
CD Pabo | Pauri | pabau santudhaar km 08 arch bridge | Arch | Motor Bridge High Level | Class A | 1973 | 13.14 | 7.500 | 162 | Pabou Santudhar Nagounkhal Damdewal Chubattakhal Chorikhal motor road | 7.456 |
1.50 % |
11-05-2026 | pingaad nala | pabau | MDR | -- | |
| 872 |
|
CD Pabo | Pauri | graam sabhaa naudi ke vidoli tok se graam kthud hetu naudi nyaar par24M span paidal setu | Truss | Motor Bridge High Level | Class A | 2016 | 24.00 | 1.800 | -- | None | 0.012 |
0.00 % |
02-07-2026 | naudi nyaar | thelisain | -- | -- | |
| 873 |
|
CD Pabo | Pauri | pailar ghraat pr paidal setu | Truss | Motor Bridge High Level | Class A | 2016 | 24.00 | 1.800 | -- | None | 0.012 |
0.00 % |
01-06-2026 | pailaar ghraat | thelisain | -- | -- | |
| 874 |
|
CD Pabo | Pauri | manjholi ghrat par paidal setu | Solid slab | Motor Bridge High Level | Class A | 2006 | 18.00 | 1.800 | -- | None | 0.009 |
0.00 % |
02-06-2026 | manjholi | paithani | -- | -- | |
| 1529 |
|
CD Pabo | Pauri | khnd tllaa pr mukh ndi pr 26m span paidal loh setu | Truss | Pedestrain Bridge | Footpath Live Load | 2006 | 26.00 | 5.950 | -- | None | 0.012 |
0.00 % |
19-05-2026 | nayar | paithani | -- | -- | |
| 1530 |
|
CD Pabo | Pauri | naudi ke bidoli tok se gram kathud hetu naudi nyar par 24m span paidal setu | Truss | Pedestrain Bridge | Footpath Live Load | 2017 | 24.00 | 5.950 | -- | None | 0.012 |
0.00 % |
02-06-2026 | naudi nyaar | thelisain | -- | -- | |
| 2143 |
|
CD Pabo | Pauri | Dhaur Saklyana Bridge Motor Road Bridge | Truss | Motor Bridge High Level | Class A | 2021 | 24.00 | 5.950 | -- | None | 0.500 |
0.00 % |
28-05-2026 | Local River | Chipalghaat | -- | -- | |
| 2146 |
|
CD Pabo | Pauri | bridge near chuthani gadere | Arch | Motor Bridge High Level | Class B | 2000 | 12.00 | 6.000 | 54 | Karanprayg Nauti Paithani state highway | 76.050 |
0.69 % |
14-05-2026 | Local Gadera | Paithani | SH | 125W625 | |
| 2149 |
|
CD Pabo | Pauri | Pinakot Arch MR Bridge | Arch | Motor Bridge High Level | Class B | 2000 | 12.00 | 6.000 | 54 | Karanprayg Nauti Paithani state highway | 70.000 |
1.03 % |
14-05-2026 | Local Gadera | Paithani | SH | 125W625 | |
| 2150 |
|
CD Pabo | Pauri | Syoli Arch Bridge | Arch | Motor Bridge High Level | Class B | 2002 | 12.00 | 6.000 | 54 | Karanprayg Nauti Paithani state highway | 65.000 |
0.52 % |
14-05-2026 | Local Gadera | Paithani | SH | 125W625 | |
| 2151 |
|
CD Pabo | Pauri | Bamorth Arch Bridge | Arch | Motor Bridge High Level | Class B | 2002 | 12.00 | 6.000 | 54 | Karanprayg Nauti Paithani state highway | 63.000 |
0.44 % |
14-05-2026 | Local Gadera | Paithani | SH | 125W625 | |
| 2152 |
|
CD Pabo | Pauri | Khand Arch Bridge 01 | Arch | Motor Bridge High Level | Class B | 2002 | 12.00 | 6.000 | 54 | Karanprayg Nauti Paithani state highway | 57.000 |
0.46 % |
14-05-2026 | Local Gadera | Paithani | SH | 125W625 | |
| 2154 |
|
CD Pabo | Pauri | Khand Arch Bridge 02 | Arch | Motor Bridge High Level | Class B | 2002 | 10.00 | 6.000 | 54 | Karanprayg Nauti Paithani state highway | 59.000 |
0.03 % |
14-05-2026 | Local Gadera | Paithani | SH | 125W625 | |
| 2155 |
|
CD Pabo | Pauri | Sarna RCC Bridge | T-beam and slab | Motor Bridge High Level | Class B | 2005 | 18.30 | 6.000 | 54 | Karanprayg Nauti Paithani state highway | 73.000 |
0.00 % |
19-05-2026 | Local Gadera | Paithani | SH | 125W625 | |
| 2157 |
|
CD Pabo | Pauri | Malli Syoli RCC Bridge | Solid slab | Motor Bridge High Level | Class B | 2014 | 8.00 | 6.000 | -- | None | 3.025 |
0.20 % |
14-05-2026 | Local Gadera | Paithani | -- | -- | |
| 2161 |
|
CD Pabo | Pauri | Paithani Syoligaad Paidal Setu | Truss | Pedestrain Bridge | Footpath Live Load | 2016 | 24.00 | 1.800 | -- | None | 77.000 |
0.00 % |
19-05-2026 | Local Gadera | Paithani | -- | -- | |
| 2168 |
|
CD Pabo | Pauri | Kalo Bajward ke madya kalgadi Nayar par Paidal Setu | Truss | Pedestrain Bridge | Footpath Live Load | 1986 | 21.00 | 1.800 | -- | None | 27.000 |
0.00 % |
20-05-2026 | kalgadi Gadera | Kalu Bazar | -- | -- | |
| 2170 |
|
CD Pabo | Pauri | Kalgari Near Motor Dumlot Village Paidal Setu | Truss | Foot Over Bridge | Footpath Live Load | 1983 | 21.00 | 1.800 | -- | None | 32.000 |
0.00 % |
02-07-2026 | Kalgadi Gadera | Kalgadi | -- | -- | |
| 2171 |
|
CD Pabo | Pauri | Kalgari Paidal over Nayar river | Truss | Foot Over Bridge | Footpath Live Load | 2006 | 27.00 | 1.800 | -- | None | 238.000 |
0.00 % |
20-05-2026 | Pachimi Nayar | Kalgadi | -- | -- | |
| 2173 |
|
CD Pabo | Pauri | Ukaal RCC Te Beam Pool | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 1982 | 15.00 | 1.800 | -- | None | 6.000 |
27.81 % |
22-07-2026 | Local Gadera | pabou | -- | -- | |
| 2177 |
|
CD Pabo | Pauri | Damdewal Kalgari MR to Dumlot Paidal Setu | Truss | Pedestrain Bridge | Footpath Live Load | 1987 | 15.00 | 1.800 | -- | None | 30.000 |
0.00 % |
20-05-2026 | Local Gadera | pabou | -- | -- | |
| 2180 |
|
CD Pabo | Pauri | Thalisain Churikhal Chipalghat Arch Bridge. 01 | Arch | Motor Bridge High Level | Class B | 1976 | 10.00 | 5.500 | 95 | Thailisain Chorikhal Chipalghat state highway | 32.350 |
0.00 % |
20-05-2026 | Local Gadera | Nautha | SH | 125W603 | |
| 2181 |
|
CD Pabo | Pauri | Thalisain Churikhal Chipalghat Arch Bridge. 02 | Arch | Motor Bridge High Level | Class B | 1979 | 12.00 | 6.000 | 95 | Thailisain Chorikhal Chipalghat state highway | 33.060 |
0.00 % |
20-05-2026 | Local Gadera | sainji | SH | 125W603 | |
| 2182 |
|
CD Pabo | Pauri | Thalisain Churikhal Chipalghat Arch Bridge. 03 | Arch | Motor Bridge High Level | Class B | 1975 | 10.00 | 6.000 | 95 | Thailisain Chorikhal Chipalghat state highway | 32.125 |
0.00 % |
20-05-2026 | Local Gadera | Nautha | SH | 125W603 | |
| 2183 |
|
CD Pabo | Pauri | Village Saiji ke antargat Gadugadu gadera ke pass 24 m Span paidal Pool | Truss | Pedestrain Bridge | Footpath Live Load | 2017 | 24.00 | 2.100 | -- | None | 34.000 |
0.00 % |
02-07-2026 | Gadugadu gadera | Nautha | -- | -- | |
| 2216 |
|
CD Pabo | Pauri | Pinkot ke nikat Daagi mai Paidal Setu 1 | Truss | Pedestrain Bridge | Footpath Live Load | 2010 | 21.00 | 1.500 | -- | None | 71.000 |
0.00 % |
19-05-2026 | Syoligaad | Paithani | -- | -- | |
| 2217 |
|
CD Pabo | Pauri | Syoli Talli Paidal Setu | Truss | Pedestrain Bridge | Footpath Live Load | 2016 | 21.00 | 2.200 | -- | None | 1.000 |
1.95 % |
19-06-2026 | Syoligaad | Paithani | -- | -- | |
| 2220 |
|
CD Pabo | Pauri | Banekha ke pass Paidal Pool | Truss | Pedestrain Bridge | Footpath Live Load | 1975 | 18.00 | 2.100 | -- | None | 39.000 |
0.00 % |
28-05-2026 | Local Gadera | pabou | -- | -- | |
| 2223 |
|
CD Pabo | Pauri | Chaplodi Mankoli Motor marg mai Motor Setu | Truss | Motor Bridge High Level | Class B | 1985 | 15.00 | 6.000 | -- | None | 2.000 |
0.00 % |
28-05-2026 | Local Gadera | pabou | -- | -- | |
| 2227 |
|
CD Pabo | Pauri | Nanda Samark Marg 3 | T-beam and slab | Motor Bridge High Level | Class A | 2022 | 15.00 | 5.150 | -- | None | 6.600 |
0.00 % |
20-05-2026 | Local Gadera | pabou | -- | -- | |
| 2241 |
|
CD Pabo | Pauri | Changin nayar mai paidal Setu | Truss | Pedestrain Bridge | Footpath Live Load | 2010 | 27.00 | 1.800 | -- | None | 1.000 |
0.00 % |
17-05-2026 | Local River | Paithani | -- | -- | |
| 2243 |
|
CD Pabo | Pauri | Gadoli Dungri Talli (Tripalisain) mia paidal RCC Setu | Truss | Pedestrain Bridge | Footpath Live Load | 2011 | 15.00 | 1.800 | -- | None | 3.000 |
0.37 % |
08-07-2026 | Local Gadera | Paithani | -- | -- | |
| 2245 |
|
CD Pabo | Pauri | Markhola Gaoun ke liya pingad nadi mai RCC Setu | Truss | Pedestrain Bridge | Footpath Live Load | 1986 | 24.00 | 1.800 | -- | None | 8.000 |
33.96 % |
19-06-2025 | Local Gadera | pabou | -- | -- | |
| 2267 |
|
CD Pabo | Pauri | Khand pe Uthiyaar Tok mai Paidal Paul | Truss | Pedestrain Bridge | Footpath Live Load | 2006 | 21.00 | 1.800 | -- | None | 52.000 |
0.00 % |
19-05-2026 | Local Gadera | khand Malla | -- | -- | |
| 2285 |
|
CD Pabo | Pauri | Marchula Saraikhet Baijro Pokhara Pauri Satpuli mai 15 m Span Setu | T-beam and slab | Motor Bridge High Level | Class B | 1972 | 15.00 | 6.000 | 62 | Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway) | 157.000 |
0.36 % |
18-05-2026 | Local Gadera | Bijropaani | SH | 125W602 | |
| 2287 |
|
CD Pabo | Pauri | Pathodiya to Syoli Mahavidhalya hetu paidal Setu | Solid slab | Pedestrain Bridge | Footpath Live Load | 2017 | 8.00 | 2.100 | -- | None | 3.900 |
0.13 % |
03-07-2026 | Local River | Guraad, Syoli | -- | -- | |
| 2375 |
|
CD Pabo | Pauri | Pabou Paali ke Madya Paidal Setu | Truss | Pedestrain Bridge | Footpath Live Load | 1994 | 45.00 | 1.800 | -- | None | 1.000 |
0.00 % |
20-05-2026 | Pachimi Nayar | pabou | -- | -- | |
| 2415 |
|
CD Pabo | Pauri | RCC bridge near paithani | T-beam and slab | Motor Bridge High Level | Class A | 2002 | 15.00 | 6.000 | 54 | Karanprayg Nauti Paithani state highway | 78.000 |
0.65 % |
14-05-2026 | Local Gadera | Paithani | SH | 125W625 | |
| 2416 |
|
CD Pabo | Pauri | Bidoli Ghunna Motor Marg Bridge | Truss | Motor Bridge High Level | Class B | 2007 | 18.00 | 6.000 | -- | None | 1.000 |
0.00 % |
21-05-2026 | Local Gadera | pabou | -- | -- | |
| 2436 |
|
CD Pabo | Pauri | Mailsain Chopra Naogaoun MR Bridege | Truss | Motor Bridge High Level | Class B | 2014 | 18.00 | 6.000 | -- | None | 9.000 |
0.00 % |
26-05-2026 | Local Gadera | Paithani | -- | -- | |
| 2521 |
|
CD Pabo | Pauri | Methana bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2016 | 20.00 | 1.800 | 3451 | Guliyari to Kharkasari motor road | 2.000 |
0.00 % |
02-06-2026 | Nauri Gadera | Methana | VR | -- | |
| 2528 |
|
CD Pabo | Pauri | Chungeen to Kokli | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2012 | 20.00 | 1.800 | 3411 | Pabou Gadigoun Pinani Damdewal motor road | 1.000 |
0.00 % |
17-05-2026 | Western Nayar | Tripalisain | VR | -- | |
| 2597 |
|
CD Pabo | Pauri | 24 M Span Bridge at Salon & Kokli | T-beam and slab | Foot Over Bridge | Footpath Live Load | 2010 | 24.00 | 1.800 | -- | None | 199.000 |
0.00 % |
17-05-2026 | Local Gadera | Kokli | -- | -- | |
| 2598 |
|
CD Pabo | Pauri | 27 m span bridge near chungeen kucholi | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2010 | 27.00 | 1.800 | -- | None | 205.000 |
0.00 % |
02-07-2026 | Western Nayar | Kirshal | -- | -- | |
| 2658 |
|
CD Pabo | Pauri | Near Ghwalkhada Inter College Paidal Setu | Truss | Foot Over Bridge | Footpath Live Load | 1993 | 14.00 | 1.500 | -- | None | 33.000 |
0.00 % |
20-05-2026 | Balgad Gadera | Nautha | -- | -- | |
| 2667 |
|
CD Pabo | Pauri | pilkera sagoda edakhal motor bridge | T-beam and slab | Motor Bridge High Level | Class B | 2000 | 15.00 | 3.000 | 3414 | Matiyalna pul bend to Pilkhera Sagoda Edakhal motor road | 1.400 |
8.53 % |
23-05-2026 | Local Gadera | Tunakhal | VR | -- | |
| 2670 |
|
CD Pabo | Pauri | buwakhal samaya paidal bridge | Truss | Pedestrain Bridge | Footpath Live Load | 1940 | 12.00 | 2.000 | -- | None | 29.325 |
0.00 % |
08-07-2026 | Balgad Gadera | Nautha | -- | -- | |
| 2674 |
|
CD Pabo | Pauri | naugaonkhal surkhet tunakhal dyuld motor bridge | T-beam and slab | Motor Bridge High Level | Class A | 1998 | 27.44 | 4.200 | 7409 | Naugaonkhal Surkhet Tunakhal Dyuld motor road : . | 3.850 |
0.30 % |
23-05-2026 | ransuwa gadera | naugaonkhal | VR | -- | |
| 2676 |
|
CD Pabo | Pauri | buwakhal samaya paidal bridge | Truss | Pedestrain Bridge | Footpath Live Load | 1945 | 11.60 | 1.400 | -- | None | 2.200 |
0.00 % |
08-07-2026 | Balgad Gadera | Nautha | -- | -- | |
| 2684 |
|
CD Pabo | Pauri | buwakhal samaya paidal bridge | Truss | Pedestrain Bridge | Footpath Live Load | 1945 | 15.00 | 2.100 | -- | None | 35.100 |
0.00 % |
20-05-2026 | Balgad Gadera | sainji | -- | -- | |
| 2694 |
|
CD Pabo | Pauri | Bwuakhal Samaya Pedestrian Bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 1942 | 24.00 | 1.800 | 3459 | Chaplodi Faldwari motor road | 2.000 |
0.00 % |
24-06-2026 | Balgarh Gadera | Chaplori | VR | -- | |
| 2717 |
|
CD Pabo | Pauri | MATIYALNA PUL BAND TO PILKHERA SAGODA MOTOR BRIDGE | Arch | Motor Bridge High Level | NA | 2002 | 13.00 | 7.000 | 3414 | Matiyalna pul bend to Pilkhera Sagoda Edakhal motor road | 0.500 |
9.22 % |
23-05-2026 | Local Gadera | MATIYALNA | VR | -- | |
| 2719 |
|
CD Pabo | Pauri | pabo kota chair talla motor bridge | T-beam and slab | Motor Bridge High Level | Class B | 1960 | 15.00 | 4.500 | -- | None | 0.400 |
1.15 % |
11-05-2026 | Local Gadera | kotli | -- | -- | |
| 2749 |
|
CD Pabo | Pauri | sonth ghrat pedestrian bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2012 | 15.00 | 1.800 | -- | None | 10.000 |
0.00 % |
02-07-2026 | Local Gadera | Sonth | -- | -- | |
| 2777 |
|
CD Pabo | Pauri | 8 m bridge | T-beam and slab | Motor Bridge High Level | Class A | 2011 | 8.00 | 6.000 | 3434 | Paithani Badeth Nodi motor road | 15.000 |
0.00 % |
26-05-2026 | Local Gadera | bareth | MDR | -- | |
| 3522 |
|
CD Pabo | Pauri | KAPROLI BRIDGE | Arch | Motor Bridge High Level | Class B | 1972 | 12.00 | 8.000 | 95 | Thailisain Chorikhal Chipalghat state highway | 1.650 |
0.00 % |
18-05-2026 | Local Gadera | KAPROLI | SH | 125W603 | |
| 3523 |
|
CD Pabo | Pauri | MUSETI BRIDGE 1 | Arch | Motor Bridge High Level | Class B | 1973 | 10.00 | 8.000 | 95 | Thailisain Chorikhal Chipalghat state highway | 0.000 |
0.00 % |
20-05-2026 | BASKATA NALA | MUSETI | SH | 125W603 | |
| 3524 |
|
CD Pabo | Pauri | MUSETI BRIDGE 2 | Arch | Motor Bridge High Level | Class B | 1976 | 7.00 | 8.000 | 95 | Thailisain Chorikhal Chipalghat state highway | 5.325 |
0.00 % |
20-05-2026 | JHIJHI NALA | MUSETI | SH | 125W603 | |
| 3525 |
|
CD Pabo | Pauri | ARCH BRIDGE | Arch | Motor Bridge High Level | Class B | 1975 | 15.00 | 7.000 | 62 | Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway) | 168.300 |
0.22 % |
18-05-2026 | Local Gadera | RITHAKHAL | SH | 125W602 | |
| 3695 |
|
CD Pabo | Pauri | MATIYALNA PUL BAND TO PILKHERA SAGODA MOTOR BRIDGE | T-beam and slab | Motor Bridge High Level | Class A | 2023 | 15.00 | 5.250 | 3414 | Matiyalna pul bend to Pilkhera Sagoda Edakhal motor road | 0.700 |
0.07 % |
23-05-2026 | Local Gadera | naugaonkhal | VR | -- | |
| 3696 |
|
CD Pabo | Pauri | MATIYALNA PUL BAND TO PILKHERA SAGODA MOTOR BRIDGE | T-beam and slab | Motor Bridge High Level | Class A | 2023 | 15.00 | 5.250 | 3414 | Matiyalna pul bend to Pilkhera Sagoda Edakhal motor road | 1.950 |
0.00 % |
23-05-2026 | Local Gadera | naugaonkhal | VR | -- | |
| 3849 |
|
CD Pabo | Pauri | Changin Kucholi Kuthkhal MR RCC Bridge | T-beam and slab | Motor Bridge High Level | Class A | 2004 | 6.00 | 3.750 | 3415 | Changin Kucholi Kuthkhal motor road | 7.850 |
0.00 % |
26-05-2026 | Local Gadera | Tripalisain | ODR | -- | |
| 3850 |
|
CD Pabo | Pauri | Changin Kucholi Kuthkhal MR | Solid slab | Motor Bridge High Level | Class B | 2005 | 7.00 | 4.800 | 3415 | Changin Kucholi Kuthkhal motor road | 8.150 |
0.00 % |
26-05-2026 | Local Gadera | Kucholi | ODR | -- | |
| 3851 |
|
CD Pabo | Pauri | Chagin Kucholi Kuthkhal MR 12m Span | T-beam and slab | Motor Bridge High Level | Class B | 2008 | 12.00 | 5.400 | 3415 | Changin Kucholi Kuthkhal motor road | 10.025 |
0.00 % |
26-05-2026 | Local Gadera | Kucholi | ODR | -- | |
| 3852 |
|
CD Pabo | Pauri | changeen jajri RCC BRIDGE | T-beam and slab | Motor Bridge High Level | Class A | 2008 | 12.00 | 5.400 | -- | None | 10.450 |
0.00 % |
26-05-2026 | LACAL NALA | JAJARI | -- | -- |